Loading...
Burch Lot 1-CS 941101The City With A Beautiful Future November 1, 1994 Mr. Wes Bnrch ~/~ 580 S. Denton Tap #100 ~ Coppell, Texas 75019~ RE: ~ DeX'red op~Fee Assessment P.O. Box 478 Coppelh Texas 75019 214-462-0022 Dear Mr. Burch: Enclosed is a copy of the City of Coppell Development Fee Assessment list, along with a copy of the Development Fee Calculations for the Bnrch Addition. Please make payment to the City of Coppell in the amount of $6,000.00 and forward it to Alan Johnson, Finance Director, along with a copy of the Fee Assessment List. A copy of the Engineer's estimate or contract for this project will need to be provided to our department so the construction inspection tee can be verified. Providing a copy of your paid receipt to our office will help us to verify payment of the required tees and insure a successfnl beginning of this project. We look forward to working with you on this project. If you have any questions, please do not hesitate to contact me. Sincerely, Kelmeth M. Griffin, P.E. Asst. City Manager/Dir. Public Works/City Engineer CC: Alan Johnson, Finance Director Greg Jones, Building Official Doug Stevens, Engineering Technician Howard Pafford, Utilities Superintendent Rey Gonzales, Street Superintendent Rick Wieland, Parks and Recreation Manager Date: Project: CITY OF COPPELL DEVELOPMENT FEES vember 1, 19745 Burcff a-saffi a TOTAL AMOUNT DUE FEES DUE PRIOR TO COUNCIL APPROVAL Water Impact Fee Fd~ 4,875.00 4,875.00 (100% due prior to Council Approval) Water Tap Inspection Fee 300.00 -0- (100% due at Issuance of Water Meter) Wastewater Impact Fee IDd 1,125.00 1,125.00 (100% due prior to Council Approval) Sewer Tap Inspection Fee -0- -0- (100% due at Issuance of Building Permit) Utility Final Inspection Fee 50.00 -0- (100% due at Issuance of Building Permit) Water Meter Fee (Domestic) 46.10 -0- (100% due at Issuance of Water Meter) Water Meter Deposit (Non-residential) 70.00 -0- (100% due at Issuance of Building Permit) Water Meter Fee (Irrigation & Fire) 2,448.20 -0- (100% due at Issuance of Water Meters) Irrigation Meter Deposit 35.00 -0- (100% due at Issuance of Water Meters) Street Sign Fee N/A -0- (100% due prior to Acceptance of Project) Street Light Fee * information not -0- (100% due prior to Acceptance of Project) available Park Fee (50% due prior to Council Approval) N/A (50% due prior to Issuance of Building Permit) Street Escrow N/A (100% due prior to Council Approval) Construction Inspection Fee need submittal of -0- (2% of Project Cost due prior to Preconstr. Mtg.) contracts TOTAL $ 8~949.30 $ 6,000.00 TOTAL AMOUNT DUE PRIOR TO COUNCIL APPROVAL This tee cannot be assessed until alter TU Electric submits the lighting plan for the proposed prqiect. Once the plan is submitted, $292.60 per light will be assessed. COPPELL PUBLIC WORKS MEMORANDUM DATE: TO: FROM: RE: The following fees referenced project. Water Impact Fee: November 1, 1994 Mike Martin, E.I.T. Howard Pafford, Utilities Superintendent Development Fees for Burch Addition should be assessed and collected 1 - 1" Domestic Meter/s = 2.5 ESU's 1 - 1" Irrigation Meter/s = 2.5 ESU's 1 - 8" Fireline Meter/s = 2.5 ESU's Total 7.5 ESU's ~ $650.00 ea = $ 4,875.00 100% due prior to Council approval of the final plat. on the Wastewater Impact 1 - 1" Domestic Meter/s = 2.5 ESU's Total 2.5 ESU's ~ $450.00 ea = $ 1,125.00 100% due prior to Council approval of the final plat. Water Tap Inspection Fee 3 Connections ~ $100.00 each = $ 300.00 100% due prior to issuance of building permit for residential. the case of multi-family, commercial, retail, industrial, fee prior to issuance of meter). Utility Final Inspection Fee (All Development) 1 lots ~ $50.00/lot = $ 50.00 100% due prior to issuance of building permit. above (Or in is due Development Fees Page 2 Water Meter Fee (Domestic) 1 1" Domestic Meters ~ 46.10ea = $ 46.10 100% due prior to issuance of building permit for residential only. All other development fees are due prior to issuance of meter/s. Water Meter Fee 1 - 1" 1 - 8" 100% due prior (Irrigation/Fireline) Irrigation Meter/s ~ Fireline Meter/s ~ $ $ 46.10 ea = $ 46.10 2,402.10ea = $ 2,402.10 Total $ 2,448.20 to issuance of water meter/s. Water Meter Deposit (Multi-Family or Non-Residential) 2 Meters ~ $35.00 ea = $ 70.00 100% due prior to issuance of water meters. Irrigation Meter Deposit 1 Meters @ $35.00 ea = $ 35.00 100% due prior to issuance of water meters. Park Fee For those developments having preliminary plat approval prior to June 23, 1992 the following assessment is determined: Residential Lots at $150.00 each = $ Units (Multi family) at $75.00 each = $ 50% of the amount specified above shall be paid by the Developer; prior to Council approval of final plat. 50% remaining shall be paid by the Builder at such time as a building permit is issued. Development Fees Page 3 For those developments having preliminary plat approval after June 23, 1992 the following assessment is determined: Residential Lots at $350.00 each = $ Units (Multi-Family) at $350.00 each = $ 50% of the amount specified above shall be paid by the Developer prior to Council approval of final plat. 50% remaining shall be paid by the Builder at such time as a building permit is issued. For those developments having preliminary plat approval after October 26, 1993 the following assessment is determined: Residential Lots at $1,285.00 each = $ Units (Multi-Family) at $1,285.00 each = $ 100% of the amount specified above shall prior to Council approval of final plat. Please advise the Developer of these fees If you have be paid by the Developer and due dates. any questions regarding these assessments please advise. Street Lighting Fee Shall be assessed and paid prior to final acceptance of project. Note: This fee cannot be assessed until after TU Electric submits the lighting plan for the proposed project. Once plan is submitted $292.60 per light will be assessed. Street Signs Fee See attached Street Sign Assessment sheet. 100% due prior to final acceptance of project. Development Fees Page 4 STREET SIGN ASSESSMENT for The following assessment is being made in accordance with the City of Coppell Subdivision Ordinance Appendix A Chapter VIII A. The following cost of those sign materials required are based on current pricing which is reviewed on a regular basis. SIGN UNIT PRICE NO Parking $53.10 Speed Limit $63.54 Yield $58.56 Stop $65.12 Street Name $11.60 Stop & Street Combo $96.85 OTHER QUANTITY EXTENDED PRICE * Cost breakdowns may be request. TOTA~ obtained from Public Works by written DEVFEES.HLP Revised 1/14/94 P.o. Box 47m Coppell, Texas 75019 214462-8~95 Pet Registration Fee Trap Deposit Impound Fee Boarding Fee Rabies Vaccine Permit ( ) Food ( ) Animal Water Meter Sales Water Meter Deposit /~..~,~ Water Sales ~ 404 ~ Received By