Loading...
Burch Lot 2-CS 941101COPPELL PUBLIC WORKS MEMORANDUM DATE: TO: FROM: RE: November 1, 1994 Mike Martin, E.I.T. Howard Pafford, Utilities Superintendent Development Fees for Burch Addition The following fees should be assessed and collected on the above referenced project. Water Impact Fee: 1 - 1" Domestic Meter/s = 2.5 ESU's 1 - 1" Irrigation Meter/s = 2.5 ESU's 1 - 8" Fireline Meter/s = 2.5 ESU's Total 7.5 ESU's @ $650.00 ea = $ 4,875.00 100% due prior to Council approval of the final plat. Wastewater Impact 1 1" Domestic Meter/s = 2.5 ESU's Total 2.5 ESU's @ $450.00 ea = $ 1,125.00 100% due prior to Council approval of the final plat. Water Tap Inspection Fee 3 Connections ~ $100.00 each = $ 300.00 100% due prior to issuance of building permit for residential. the case of multi-family, commercial, retail, industrial, prior to issuance of meter). Utility Final Inspection Fee (Ail Development) 1 lots @ $50.00/lot = $ 50.00 100% due prior to issuance of building permit. (Or in fee is due Development Fees Page 2 Water Meter Fee 1 - 1" (Domes tic) Domestic Meters 46.10ea = $ 46.10 100% due prior to issuance of building permit for'residential only. Ail other development fees are due prior to issuance,of meter/s. Water Meter Fee (Irrigation/Fireline) 1 1" Irrigation Meter/s 1 8" Fireline Meter/s ~ $ 46.10 ea = S 46.10 2,402.10ea = $ 2,402,10 Total $ 2,448.20 100% due prior to issuance of water meter/s. Water Meter Deposit (Multi-Family or Non-Residential) 2 Meters @ $35.00 ea = $ 70.00 100% due prior to issuance of water meters. Irrigation Meter Deposit 1 Meters @ $35.00 ea = $ 35.00 100% due prior to issuance of water meters.