Loading...
Burch Lot 2-CS 941010DEVELOPMENT FEES PROJECT NAME: Kwik Kar Lube & Tune ENGINEER: Kwik Industries, Inc. REV SION DATE: 10/10/94 SENT ASSESSMENT ASSESSED FEE Park Fee 9/14/94 Water Impact Fee $1,300.00 9/14/94 Wastewater Impact Fee $450.00 Street Sign Street Light Construction Insp.(Grading) Construction Inspection Construction Insp.(Fire Ln.) Construction Insp.(Walk) irrigation Street Escrow Street Cut Permit Overtime Inspection Water Tap Inspection Utility Final Inspection Water Meter Fee(Lots) Water Meter (Irrig. & Fire) Water Meter Deposit TOTALS $90.00 $249.30 $143.00 $96.00 $100.00 $200.00 $50.00 $22.25 $22.25 $70.00 TotaIFees $2,792.80 AMOUNT PAID $1,300.00 $450.00 $90.00 $249.30 $143.00 $96.00 $100.00 $200.00 $50.00 $22.25 $22.25 $70.00 Fees Paid $2,792.80 DATE 9/19/94 9/19/94 8/25/94 9/19/94 9/19/94 9/19/94 8/25/94 9/19/94 9/19/94 9/19/94 9/19/94 9/19/94 Amount Owed $0.00 NOTES Prior To Construction Erosion Control Approved E.P.A.-N.O.I. Recd. Const. Plan Approved Irrigation Plan Recd. Homeowner's Maint. Prior To Final Acceptance As Built Plan Recd. Paving Bond Recd. Utilities Bond Recd. Irrigation Plan Approved Erosion Control Maint. COPPELL PUBLIC WORKS MEMORANDUM DATE: TO: FROM: RE: September 7, 1994 Engineering Department Public Works Staff Development Fees for Kwik Kar The following fees referenced project. Water Impact Fee: 2 5/8" x 3/4" 100% should be assessed and collected on the above Total 2 due prior to Council approval Domestic Meter/s = 2 ESU's Irrigation Meter/s = __ ESU's Fireline Meter/s = __ ESU's ESU's ~ $650.00 ea = $ 1,300.00 of the final plat. Wastewater Impact (City) 1 - 5/8" x 3/4" Domestic Meter/s = 1 ESU's Total 1 ESU's ~ $450.00 ea = $ 450.00 100% due prior to Council approval of the final plat. Water Tap Inspection Fee 2 Connections @ $100.00 each = $ 200.00 100% due prior to issuance of building permit for residential. the case of multi-family, commercial, retail, industrial, prior to issuance of meter). Utility Final Inspection Fee (Ail Development) 1 lots @ $50.00/lot = $ 50.00 100% due prior to issuance of building permit. (Or in fee is due Development Fees Page 2 Water Meter Fee (Domestic) 1 - 5/8" x 3/4" Domestic Meters @ $22.50 ea = $ 22.25 100% due prior to issuance of building permit for residential only. Ail other development fees are due prior to issuance of meter/s. Water Meter Fee (Irrigation) 1 - 5/8" x 3/4" Irrigation Meter/s ~ 100% due prior to issuance of water meter/s. $ 22.25ea = $ 22.25 Water Meter Deposit (Multi-Family or Non-Residential) 2 Meters ~ $35.00 ea = $ 70.00 100% due prior to issuance of water meters. - CITY OF COPPELL DEVELOPMENT FEES Date:' September 14. 1994 Project: Kwik Kar TOTAL AMOUNT DUE FEES DUE PRIOR TO COUNCIL APPROVAL Water Impact Fee $1,300.00 $1,300.00 (100% due prior to Council Approval) Water Tap Inspection Fee $200.00 -0- (100% due at Issuance of Water Meter) Wastewater Impact Fee $ 450.00 $ 450.00 (100% due prior to Council Approval) Sewer Tap Inspection Fee -0- -0- (100% due at Issuance of Building Permit) Utility Final Inspection Fee $50.00 -0- (100% due at Issuance of Building Permit) Water Meter Fee (Domestic) $22~25 -0- (100% due at lssuance of Water Meter) Water Meter Deposit (Non-Residential) $70.00 (100% due at Issuance of Water Meters) Water Meter Deposit (Residential) -0- -0- (100% due at Issuance of Building Permit) Water Meter Fee (Irrigation & Fire) $22.25 -0- (100% due at Issuance of Water Meters) Irrigation Meter Deposit -0- -0- (100% due at Issuance of Water Meters) Street Sign Fee -0- -0- (100% due prior to Acceptance of Project) Street Light Fee * -0- -0- (100% due prior to Acceptance of Project) Park Fee -0- -0- (50% due prior to Council Approval) (50% due prior to Issuance of Building Permit) Construction Inspection Fee need submittal of -0- (2% of Project Cost due prior to Preconstr. Mtg.) contracts TOTAL $ 2, 114.50 TOTAL AMOUNT DUE PRIOR TO COUNCIL APPROVAL $1,750,00 * This fee cannot be assessed until after TU Electric submits the lighting plan for the proposed project. Once Ibc plan is submitted, S2~)2.60 per light will bc assessed.