Loading...
Burch Lot 2-CS 940907COPPELL PUBLIC WORKS MEMORANDUM DATE: TO: FROM: RE: September 7, 1994 Engineering Department Public Works Staff Development Fees for Kwik Kar The following fees referenced project. Water Impact Fee: 2 - 5/8" Total 2 X 3/4" should be assessed and collected on the above Domestic Meter/s = 2 ESU's Irrigation Meter/s = __ ESU's Fireline Meter/s = __ ESU's ESU's @ $650.00 ea = $ 1,300.00 100% due prior to Council approval of the final plat. Wastewater Impact (City) 1 - 5/8" x 3/4" Domestic Meter/s = 1 ESU's Total 1 ESU's ~ $450.00 ea = $ 450.00 100% due prior to Council approval of the final plat. Water Tap Inspection Fee 2 Connections ~ $100.00 each = $ 200.00 100% due prior to issuance of building permit for residential. (Or in the case of multi-family, commercial, retail, industrial, fee is due prior to issuance of meter). Utility Final Inspection Fee (Ail Development) 1 lots @ $50.00/lot = $ 50.00 100% due prior to issuance of building permit. Development Fees Page 2 Water Meter Fee (Domestic) 1 - 5/8" x 3/4" Domestic Meters @ $22.50 ea = $ 22.25 100% due prior to issuance of building permit for residential only. Ail other development fees are due prior to issuance of meter/s. Water Meter Fee (Irrigation) 1 - 5/8" x 3/4" Irrigation Meter/s @ $ 22.25ea 100% due prior to issuance of water meter/s. = $ 22.25 Water Meter Deposit (Multi-Family or Non-Residential) 2 Meters @ $35.00 ea = $ 70.00 100% due prior to issuance of water meters.