Loading...
Burch Lot 3-CS 951020ENGINEERING DEPARTMF~NT UTILITIES DIVISION DATE: TO: FROM: RE: October 20, 1995 Doug Stevens, Engineering Tech. Howard Pafford, Utilities Superintendent Butch Addition Lot 3 Blk. A ($1.25 Dry This project changed the size of the Domestic from a 3/4" to a 1" which in~ cost of Impact Fees. They owe the city in addition to the fees that were already paid, a $675.00. water imp~ct and a $675.00 sewer impact. If you have any questions, please give me a call. HLP/dg $125 Cleaners