Burch Lot 3-CS 951020ENGINEERING DEPARTMF~NT
UTILITIES DIVISION
DATE:
TO:
FROM:
RE:
October 20, 1995
Doug Stevens, Engineering Tech.
Howard Pafford, Utilities Superintendent
Butch Addition Lot 3 Blk. A ($1.25 Dry
This project changed the size of the Domestic from a 3/4" to a 1" which in~ cost of
Impact Fees. They owe the city in addition to the fees that were already paid, a $675.00.
water imp~ct and a $675.00 sewer impact.
If you have any questions, please give me a call.
HLP/dg
$125 Cleaners