Loading...
Burch Lot 4-CS 960304COPPELL ENGINEERING UTILITIES DIVISION MEMORANDUM DATE: TO: FROM: RE: March 4, 1996 Carolyn Bebermeyer, Accountant Darlene Greene, Utilities Secretary Reimbursement For Over Payment On Meter Assessment On 3/1/96 meter assessments for Dr. stich III, were paid in the amount of $281.05. Attached is a receipt showing this transaction. We apologize for the inconvenience, but we are requesting a reimbursement check for the amount of $50.00. The total to be paid at that time should have been $231.05. Please issue it to Dr. Stich III, DDS M.S.D. 580 S. Denton Tap Road, Suite 220 Coppell, Texas 75019. Thank you for your time on this matter. have any questions. Give me a call if you DG -~ FRANK J. STICH III, D.D.S., .d.S.D. pRACllCE UMfTSD TO ORTHODONTICS ~80 S, DENTON TA~ RD., SUITE 220 COPI~I.I., 'TX 7~019 PH, 214-4~.7892 ~AY ~ .~ --~OLLARSI CH£CX CHECK AMOUNT OVERTON PARK NATIONAL BANK. N.A. COPPELLOFFICE COPPELL TF-XAS 75010 Col~pell, Texas 75019 214-482-8495 Pet Registration Fee Trap Deposit Impound Fee Boarding Fee Rai=ies Vaccine DEVELOPMENT FEES PROJECT NAME: Butch Addition, Lot 4, BIk. A (Dr. Stitch) ENGINEER: REVISION DATE: 2/26/96 SENT 5110~95 5/10~95 ASSESSMENT Park Fee Water Impact Fee Wastewater Impact Fee Street Sign Street Light Construction Inspection Const. Insp. (Brick Paving) Irrigation Street Escrow Street Cut Permit Overtime Inspection ASSESSED FEE $1,575.00 $450.00 $265.00 $26.00 $100.00 AMOUNT PAID DATE 1,575.00 8/16/95 $450.00 8/16/95 $265.00 8/16/95 $26.00 8/18/95 $100.00 8/18/95 TOTALS Total Fees $2,416.00 Fees Paid Amount Owed $2,416.00 $0.00 Prior To Construction Erosion Control Approved E.P.A.-N.O.I. Recd. Const. Plan Approved Irrigation Plan Recd. Homeowner's Maint. NOTES Prior To Final Acceptance As Built Plan Recd. Paving Bond Recd. Utilities Bond Recd. Irrigation Plan Approved Erosion Control Maint.