Loading...
Burch Lot 4-CS 951019ENGINEERING DEPARTMENT UTILITIES DIVISION DATE: TO: FROM: RE: October 19, 1995 Doug Stevens, Engineering Tech. Howard Pafford, Utilities Superintendent Butch Addition Lot 4 Blk. A. Assessment Fee Adjustment (Dr. Stitch) This project changed the size of the Domestic from a 3/4" to a 1" which increased cost of Impact Fees. They owe the city in addition to the fees that were already paid $675.00. water impact and $675.00 sewer impact. If you have any questions, please give me a call. HLP/dg DEVELOPMENT FEES PROJECT NAME: ENGINEER: REV SION DATE: Burch Addition, Lot 4, BIk. A (Dr. Stitch) 10/11/95 SENT 5/10/95 5/10/95 ASSESSMENT Park Fee Water Impact Fee Wastewater Impact Fee Street Sign Street Light Construction Inspection Const. Insp. (Brick Paving) Irrigation Street Escrow Street Cut Permit Overtime Inspection ASSESSED FEE $1,575.00 $450.00 $265.00 $26.00 $100.00 AMOUNT PAID DATE $1,575.00 8116~95 $450.00 8/16/95 $265.00 8/16/95 $26.00 8/18/95 $ 100.00 8118~95 TOTALS Total Fees $2,416.00 Fees Paid Amount Owed $2,416.00 $0.00 NOTES Prior To Construction Erosion Control Approved E.P.A.-N.O.I. Recd. Const. Plan Approved Irrigation Plan Recd. Homeowner's Uaint. Prior To Final Acceptance As Built Plan Recd. Paving Bond Recd. Utilities Bond Recd. Irrigation Plan Approved Erosion Control Maint.