Burch Lot 4-CS 951019ENGINEERING DEPARTMENT
UTILITIES DIVISION
DATE:
TO:
FROM:
RE:
October 19, 1995
Doug Stevens, Engineering Tech.
Howard Pafford, Utilities Superintendent
Butch Addition Lot 4 Blk. A. Assessment Fee Adjustment
(Dr. Stitch)
This project changed the size of the Domestic from a 3/4" to a 1" which increased cost of
Impact Fees. They owe the city in addition to the fees that were already paid $675.00.
water impact and $675.00 sewer impact.
If you have any questions, please give me a call.
HLP/dg
DEVELOPMENT FEES
PROJECT NAME:
ENGINEER:
REV SION DATE:
Burch Addition, Lot 4, BIk. A (Dr. Stitch)
10/11/95
SENT
5/10/95
5/10/95
ASSESSMENT
Park Fee
Water Impact Fee
Wastewater Impact Fee
Street Sign
Street Light
Construction Inspection
Const. Insp. (Brick Paving)
Irrigation
Street Escrow
Street Cut Permit
Overtime Inspection
ASSESSED FEE
$1,575.00
$450.00
$265.00
$26.00
$100.00
AMOUNT PAID DATE
$1,575.00 8116~95
$450.00 8/16/95
$265.00 8/16/95
$26.00 8/18/95
$ 100.00 8118~95
TOTALS
Total Fees
$2,416.00
Fees Paid Amount Owed
$2,416.00 $0.00
NOTES
Prior To Construction
Erosion Control Approved
E.P.A.-N.O.I. Recd.
Const. Plan Approved
Irrigation Plan Recd.
Homeowner's Uaint.
Prior To Final Acceptance
As Built Plan Recd.
Paving Bond Recd.
Utilities Bond Recd.
Irrigation Plan Approved
Erosion Control Maint.