ST9302-LR 990217ALPHA TESTING, INC.
2209 Wisconsin St., Suite 100
Dallas, Texas 75229
9721620 -8911 - 9721263 -4937 (Metro)
FAX: 9721406 -8023
TESTED FOR: CITY OF COPPELL
COPPELL, TEXAS
DATE OF ISSUE: 02/17/99
PROJECT: SANDY LAKE ROAD PROJECT NO. ST 93 -02 OUR REPORT NO.: 98881 -15
COPPELL, TEXAS
FIELD DATA
LOCATION OF CONCRETE PLACEMENT MANHOLE AT STATION 101 +79.16, TYPE B
DATE PLACED
02/17/99
TIME
16:00
SLUMP (ASTM C -143)
2.8
AIR CONTENT (ASTM C -231 ❑ OR C -173 ❑)
N/A
AIR TEMPERATURE
65
CONCRETE TEMPERATURE
70
DATE RECEIVED
02/18/99
FIELD DATA SUBMITTED BY
OMAR
MIX DATA SUBMITTED BY
LATTIMORE
SPECIMENS CAPPED IN ACCORDANCE WITH ASTM C -617 Gr OR C -1231 ❑
COMPRESSION TEST RESULTS
(NOMINAL CYLINDER SIZE 6 X 12 - )
(ASTM C39)
PLANT
3
DELIVER TICKET NO.
3078123
MIX PROPORTIONS (SSD)
AREA
CEMENT
N/A
WATER
N/A
FINE AGGREGATE
N/A
COARSE AGGREGATE
N/A
ADMIXTURE
N/A
LAB
NO.
TYPE
CURING
DATE
TESTED
AGE
DAYS
TOTAL
LOAD
AREA
COMPRESSIVE
STRENGTH, PSI
1
LAB
02/24/99
7
84,909
28.27
3,000
2
LAB
03/17/99
28
113,306
28.27
4,010
3
LAB
03/17/99
28
140,864
28.27
4,980
4
LAB
HOLD
H
28.27
I Specifications 28
4,000
REMARKS:
REPORT OF CONCRETE
COMPRESSION TEST
GT Cylinders made by ALPHA
representative.
❑ Cylinders made by Architect's
�, or Contractor's representative.
Lam' Cylinders picked up by ALPHA
laboratory.
❑ Cylinders delivered to ALPHA
labo tery:
Compression test results comply with
applicable specifications.
❑ Compression test results do not comply
with applicable specifications.
w
pect(ull Submitted
ALP S I
Geotechnical Engineering ■ Construchon Materials Testing ■ Environmental Engineering ■ Consufling
1
ALPHA TESTING, INC.
REPORT OF CONCRETE
COMPRESSION TEST
2209 Wisconsin St., Suite 100
Dallas, Texas 75229
9721620 -8911 - 9721263 -4937 (Metro)
FAX: 9721406 -8023
TESTED FOR: CITY OF COPPELL
COPPELL, TEXAS
DATE OF ISSUE: 02/17/99
PROJECT: SANDY LAKE ROAD PROJECT NO, ST 93-02 OUR REPORT NO.: 98881 -15
COPPELL, TEXAS
FIELD DATA
LOCATION OF CONCRETE PLACEMENT MANHOLE AT STATION 101 +79.16, TYPE B
DATE PLACED
02/17/99
16:00
PLANT 3
DELMER TICKET NO. 3078123
TIME
2.8
MIX PROPORTIONS (SSD)
SLUMP (ASTM C -143)
AIR CONTENT (ASTM C-231 ❑ OR C -173 ❑)
N/A
CEMENT N/A
AIR TEMPERATURE
65
WATER N/A
N/A
CONCRETE TEMPERATURE
70
FINE AGGREGATE
NIA
28
02/18/99
COARSE AGGREGATE
DATE RECEIVED
OMAR
ADMIXTURE N/A
FIELD DATA SUBMITTED BY
LATTIMO�e
MIX DATA SUBMITTED BY
SPECIMENS CAPPED IN ACCORDANCE WITH ASTM C-617 C)/ OR C -1231 ❑
LAB
HOLD
H
D Cylinders made by ALPHA
28
COMPRESSION
TEST RESULTS
representative.
(NOMINAL CYLINDER SIZE 6" X 12")
(ASTM C -38)
LAB
NO.
TYPE
CURING
DATE
TESTED
AGE TOTAL
DAYS LOAD
AREA
COMPRESSIVE
STRENGTH, PSI
1
LAB
02/24/99
7 84,909
28.27
3,000
2
LAB
03117/99
28
28.27
3
LAB
03/17/99
28
28.27
4
LAB
HOLD
H
28.27
28
4,000
❑ Cylinders made by Archdads
or Contractors repro nbdive.
9-1n mders Picked up by ALPHA
laboratory.
❑ Cylinders delivered to ALPHA
laboratory.
❑ Compression test results comply with
applicable specifications.
❑ Compression test results do not comply
Milli applicable specifications.
RespeWuHY Submitted
LPHA TESTING, INC.
REMARKS:
CC
Geotechnical Engineering ■ Consfruciion Materials Tesffng ■ Environmental Engineering ■ Consultfn9