Vaughn Addition-CS051004 T H E C I T Y 0 F COl'FELL October 4, 2005 Ms. Sharon Vaughn Vaughn Construction 2221 Manana, #100 Dallas, TX 75220 RE: Vaughn Addition, Lot 1, Block A Fee Assessment Letter Dear Ms. Vaughn: Enclosed is a copy of the City of Coppell Development Fee Assessment table, along wkh a copy of the Development Fee calculations for the referenced development. Please make payment for the Impact Fees to the City of Coppell in the amount of $461.70 and forward to the Engineering Department along with a copy of the Fee Assessment table. This amount is a portion of the assessed fees that need to bc paid prior to filing of the final plat. This fee is based on the additional impact to city facilities based on the change from a single-family residence to an office use. The amount owed is equal to thc calculated impact for an office building of this size less the calculated amount for one single family home. Since there is no plan to change any of the utilities, there are no utility impact fees due. If an additional irrigation meter is installed with this project, that will constitute an impact to the system, and appropriate fees would need to be paid. If you have any questions, or if you need additional intbrmation, please contact me. Sincerely, Charlene La Mattma, E.I.T. Graduate Engineer Jennifer Armstrong, Finance Director Mary Beth Spletzer, Administrative Secretary, Building Inspections Glenn Hollowell, Assistant Director of Pnblic Works Greg Jones, Chief Building Official Brad Reid, Director of Parks and Recreation DEVELOPMENT FEE TABLE Project: Vaughn Addition, Lot 1, Blocl~ A Date: 10/4/2005 TOTAL AMOUNT DUE FEES DUE PRIOR TO FILING PLAT Water Impact Fee $0.00 (100% due at Issuance of Building Permit) Water Tap Inspection Fee $0.00 (100% due at Issuance of Water Meter) Water Meter Fee (Domestic) $0.00 (100% due at Issuance of Water Meter) Water Meter Fee (Irrigation/Fireline) $0.00 (100% due at Issuance of Water Meter) Water Meter Deposit (Domestic) $0.00 (100% due at Issuance of Water Meter) lrrigation/Fireline Meter Deposit $0.00 (100% due at Issuance of Water Meter) Wastewater Impact Fee $0.00 (100% due at Issuance of Building Permit) Wastewater Tap Inspection Fee $0.00 (100% due at Issuance of Building Permit) !Utility Final Inspection Fee $0.00 (100% due at Issuance of Building Permit) Park Fee $0.00 $0.00 (100% due prior to Filing Plat) Roadway Impact Fee $461.70 $461.70 (100% due prior to Filing Plat) Street Light Fee [nlbrmation not Available (100% due prior to Acceptance of Project) [[ Street Sign Fee Information not Available (I 00% due prior to Acceptance of Project) [1 Construction Inspection Fee Information not Available (100% due prior to Start of Construction) II YOTAL $461.70 TOTAL AMOUNT DUE PRIOR TO FILING FINAL PLAT $461.70 DEVELOPMENT FEE WORKSHEET PROJECT: Vaughn Addition, Lot 1, Block A DATE: 10/4/2005 Water Impact Fee: Domestic Meter(s): Irrigation Meter(s): Fireline Meter(s): 0 = 0 Total #: 0 ESU's @ $280.00 ea. (Due prior to issuance of building permit) Water Tap Inspection Fee: Total #: 0 Connections @ $50.00 ea. (Single family due prior to issuance of building permit) (All other developments due prior to issuance of meter) Domestic Water Meter Fee: Total #: 0 Domestic Meter(s) @ $0.00 (Single family due prior to issuance of building permit) (All other developments due prior to issuance of meter) Irrigation/Fireline Water Meter Fee: Total #: 0 Irrigation Meter(s) @ $0.00 Total #: 0 Additional Irrigation Meter(s) @ $0.00 Total #: 0 Fireline Meter(s) @ $0.00 (100% due prior to issuance of water meters) Domestic Water Meter Deposit Fee: Total #: 0 Meter(s) @ $30.00 ea. (100% due prior to issuance of water meters) Irrigation/Fire Meter Deposit Fee: Total #: 0 Meter(s) @ $3000 ea. (100% due prior to issuance of water meters) Wastewater Impact Fee: Total Domestic Meters ESU's: 0 (Due prior to issuance of building permit) @ $280.00 ea Wastewater Tap Inspection Fee: Total #: 0 Connections @ $50.00 ea (100% due prior to issuance of building permit) Utility Final Inspection Fee (All developments): lotal #: 0 Lots @ $5000 ea. (100% due prior to issuance of building permit) 0 ESU's 0 ESU's 0 ESU's ESU's $0.00 $0.00 $000 $0.00 SQ00 $0.00 SQ00 $000 $0.00 $0.00 $0.00 Park Fee (For Residential Developments Only): Page 1 DEVELOPMENT FEE WORKSHEET * Preliminary plat approved: After October 26, 1993 0 o Single-family @ $0.00 per lot Multi-family @ $0.00 per unit (100% paid prior to Council approval of final plat) $0.00 SQ00 $461 70 Information not Available Roadway Impact Fee: (See attached fee calculations) Street Lighting Fees: Assessed for lighting in the City's right-of-way. This fee cannot be assessed until after T,U Electric submits the lighting plan for the proposed development, Once the plans are submitted, $292.60 per light will be assessed. (100% due prior to final acceptance of development) Street Sign Fees: Assessed for signage in the City's right-of-way. (See attached fee calculations if applicable) Information not Available Construction Inspection Fees: A copy of the development contract must be submitted for assessment. The contracts should indicate the cost to construct the improvements that are inspected by the Engineering Department. (2% of development cost required for private improvements) (4% of development cost required for public improvements) Information not Available Page 2 ROADWAY IMPACT FEE CALCULATIONS PROJECT: DATE: Vaughn Addition, Lot 1, Block 10/4/2005 ROADWAY IMPACT FEE: gervice Area * 5 Category ** Office Land Use ** General Office Bldg. Building Area (so 1,100 Development Units ** 1.10 Vehicle Miles per Development Unit ** 3.99 Fee per Vehicle Mile *** $300 Roadway Impact Fee due - (Development Units) x Vehicle Miles per Development Unit) x (Fee per Vehicle Mile) $1,316.70 * (Figure 2 - Roadway Impact Fee Study) ** (Table 3 - Roadway Impact Fee Study) *** (Schedule 2, Page 3 - Roadway Impact Fee Study) Credit for Single Family Home Impact Fee $855 $855.00 AMOuNT DUE: ' $~612~0 }