Loading...
MA FY 0405-CS051005T H E- C I T Y O F COPPELL October 5, 2005 RE: Parkway Boulevard (between Parkview Place and Lodge Road) Reconstruction project Dear Coppell Citizen: Over the past few years the concrete paving on Parkway Blvd. (from Parkview Place to Lodge Road) has experienced concrete failures. This has caused the City to continually repair sections of the roadway. The City is proceeding with their annual street repair project and Parkway Blvd, is on the list for removal and replacement of the failed sections of paving. Our contractor for street repairs, Pavement Services Corporation, will begin the removal and replacement of failed sections of Parkway Blvd. in mid - Oct ober. The work has been estimated to take approximately two weeks, barring any bad weather days. During the reconstruction on Parkwav Blvd., parking on the south side of Parkwav Blvd., between Parkview Place and Lodge Road, will not be allowed. Notices will be put on your front door when the construction is scheduled to begin. If you have any questions regarding this project or any information provided in this letter, please contact the Engineering Department at 972/304 -3679. Sincerely, x�. Kenneth M4rif Director of Engineering/Public Works Office 972/304 -3686 Fax 972/304 -7041 E-mail kg ifffin d ci.co4�pv11.tx.us cc: Jim Witt, City Manager Sharon Logan, Comm. Info. Officer Police Dept. Fire Dept. coPPE" YtCRi IN 255 PARKWAY * P.O.BOX 9478 * <OPPELL TX 75019 * TEL 9721462 0022 * FAX 972/304 3673 T H E C 1 T Y O F COPPELL October 5, 2005 (Letter mailed to 24 addresses list attached) RE: Parkway Boulevard (between Parkview Place and Lodge Road) Reconstruction project Dear Coppell Citizen: Over the past few years the concrete paving on Parkway Blvd. (from Parkview Place to Lodge Road) has experienced concrete failures. This has caused the City to continually repair sections of the roadway. The City is proceeding with their annual street repair project and Parkway Blvd. is on the list for removal and replacement of the failed sections of paving. Our contractor for street repairs, Pavement Services Corporation, will begin the removal and replacement of failed sections of Parkway Blvd. in mid - October The work has been estimated to take approximately two weeks, barring any bad weather days. During the reconstruction on Parkway Blvd., parking on the south side of Parkway Blvd., between Parkview Place and Lodge Road, will not be allowed Notices will be put on your front door when the construction is scheduled to begin. If you have any questions regarding this project or any information provided in this letter, please contact the Engineering Department at 972/304 -3679. Sincerely, Kenneth M. rif ifn P.E. Director of Engineering /Public Works Office 972/304 -3686 Fax 972/304 -7041 E -mail k priffi n Ct�ci.j� c jijx.u, cc: Jim Witt, City Manager Sharon Logan, Comm. Info. Officer Police Dept. Fire Dept. COPPELL YEARS IN 9 55.100 5 255 PARKWAY * P.O.BOX 9478 * COPPELL TX 75019 * TEL 972/462 0022 * FAX 972/3043673 TAXPAYNAME SMITH KIRK E & ELEANOR R SULLIVAN TAXPAYADR2 TAXPAYCITY TAXPFTAXPAYZI BURSA CHRISTINE L 329 PARKWAY BLVD COPPELL TX 75019 ADDISON TIMOTHY J 333 PARKWAY BLVD COPPELL TX 75019 RUVIO FRANK J & LINDA L BROWN 337 PARKWAY BLVD 341 PARKWAY BLVD COPPELL TX 75019 GRISSETT VICKI 345 PARKWAY BLVD COPPELL COPPELL TX TX 75019 DODSON PAUL W 307 COPPERSTONE TRL COPPELL TX 75019 75019 BROCKMAN SCOTT E & GINGER L 353 PARKWAY BLVD COPPELL TX 75019 PARTIDA CHERYL J 357 PARKWAY BLVD COPPELL TX 75019 DOBSON JOHN S & SUZANNE J MILLER 361 PARKWAY BLVD COPPELL TX 75019 TRAYWICK MARK 365 PARKWAY BLVD COPPELL TX 75019 SHARROCK RICHARD L 369 PARKWAY BLVD COPPELL TX 75019 CHARANIA NAZIR & MUNIRA 401 PARKWAY BLVD COPPELL TX 75019 JACKSON RICHARD E 405 PARKWAY BLVD COPPELL TX 75019 NULISCH KARY D BOOTH LLOYD E 409 PARKWAY BLVD COPPELL TX 75019 VOLOGZHANIN DMITRY L 413 E PARKWAY BLVD COPPELL TX 75019 HANSON LAURA 417 PARKWAY BLVD COPPELL TX 75019 MAXWELL JAMES G & KECIA D 421 PARKWAY BLVD 425 PARKWAY BLVD COPPELL TX 75019 HOUSKA BRAD A PO BOX 3065 COPPELL COPPELL TX TX 75019 SEALY MARSHA C & CARMEN A SEALY 433 PARKWAY BLVD COPPELL TX 75019 PHILLIPS LYNN C & CATHY S PHILLIPS 437 PARKWAY BLVD COPPELL TX 75019 KIEFNER BRUCE J 441 PARKWAY BLVD COPPELL TX 75019 75019 Road Closure Parkwa Boulevard (between Park Place an����������� Contractors xviUberornovin )ondnap|acin�foihmd�eoton of — ---'~° ^~�~^~^« »veokof October 17,2OOS. m sections pa«en�*nton�arbxxayBk/�.th� Parking on the south side mf Parkway Blvd. will not beallowed, between Parkvievv Place and Lodge Road, during the reconstruction. Notices will be placed on doorways prior to the start of construction. For more information on this and mther - ithin the city mfCoppmU visit the Engineering Department . � � /l i°it 3 T H E C I T Y O F NEWS RELEASE FOR IMMEDIATE RELEASE October 7, 2005 Contact: Sharon Logan, Community Information Officer (972) 304 -7065 PARKWAY BLVD. TO UNDERGO REPAIRS MID - OCTOBER Parkway Boulevard, between Parkview Place and Lodge Road will undergo removal and replacement of failed sections of paving beginning mid - October. During the reconstruction phase, parking on the south side of Parkway Boulevard between Parkview Place and Lodge Road will not be allowed. Notices will be placed on doorways prior to the start of construction. If you have questions regarding this project, please contact the Engineering Department at 972 - 304 -3679. 255 PARKWAY * P.O. BOX 9478 * COPPELL TX 75019 * TEL 972/462 -0022