Freeport NIP(8.1)-CS051005 (2)October 5, 2005
Mr. Jack Evans, P.E.
Pacheco Koch Consulting Engineers
8350 N. Central Expressway, Suite 1000
Dallas, TX 75206
RE: Duke-Freeport Addition, Lots 2R 1 & 2R 2, Block A
Fee Assessment Letter
Dear Mr. Evans:
Enclosed is a copy of the City of Coppell Development Fee Assessment table, along with a copy of the
Development Fee calculations for the referenced development.
Please make payment for the Impact Fees to the City of Coppell in the amount of $74,918.26 and forward
to lhe Engineering Department along with a copy of the Fee Assessment table. This amount is a portion of
the assessed fees that need to be paid prior to filing of the final plat. Please note that the Texas
Legislature, under Senate Bill 243, delayed the collection of Water and Sewer Impact Fees until the
issuance of a Building Permit. Please provide a copy of the Engineer's estimate or contract to our office
so the 2% & 4% construction inspection fee can be verificd. The construction inspection fees must be
paid prior to the scheduled pre-construction meeting.
Thc additional fees for xvater and sewer taps, water meters, and utility inspection fees need to be paid by
separate check at the new Public Works Service Center, 816 S. Coppell Road. Meters will be ordered
when those fees are paid.
Appropriate pa3qnent of the required fees will help insure a successful beginning of this project. We look
fbrward to working with you on this project. If you have any questions, please contact me.
Sincerely,
Graduate Engineer
CC:
Jennifer Armstrong, Finance Director
Mary Beth Spletzer, Administrative Secretary, Building Inspections
Glenn Hollowell, Assistant Director of Public Works
Greg Jones, Chief Building Official
Brad Reid, Director of Parks and Recreation
DEVELOPMENT FEE TABLE
Project: Duke-Freeport Addition, Lots 2R 1 & 2R 2, Block A
Date: lO/5/2005
TOTAL AMOUNT DUE
FEES DUE PRIOR TO
FILING
PLAT
Water hnpact Fee $9,660.00
(100% due at Issuance of Building Permit)
Water Tap Inspection Fee $300.00
(100% due at Issuance of Water Meter)
Water Meter Fee (Domestic) $408.68
(100% due at Issuance of Water Meter)
Water Meter Fee (Irrigation/Fireline) $9,491.18
(100% due at Issuance of Water Meter)
Water Meter Deposit (Domestic) $60.00
(100% due at Issuance of Water Meter)
Irrigation/Fireline Meter Deposit $120.00
(100% due at Issuance of Water Meter)
Wastewater Impact Fee $4,480.00
(100% due at Issuance of Building Permit)
Wastewater Tap Inspection Fee $100.00
(100% due at Issuance of Building Pemfit)
Utility Final Inspection Fee $100.00
(100% due at Issuance of Building Permit)
Park Fee $0.00 $0.00
(100% due prior to Filing Plat)
Roadway lmpact Fee $74,918.26 $74,918.26
(100% due prior to Filing Plat)
Street Light Fee Information not Available
(100% due prior to Acceptance of Project)
Street Sign Fee information not Available
(100% due prior to Acceptance of Project) I[
Construction Inspection Fce Information not Available
(100% due prior to Start of Construction)
TOTAL $99,638.12
IOTAL AMOUNT DUE PRIOR TO F1L1NG FINAL PLAT $74,918.26
DEVELOPMENT FEE WORKSHEET
PROJECT: Duke-Freeport Addition, Lots 2R 1 & 2R 2, Block
DATE: 10/5/2005
Water Impact Fee:
Domestic Meter(s):
Irrigation Meter(s):
Firetine Meter(s):
2 - 2 inch = 16 ESU's
2 - 2 inch = 16 ESU's
0 = 0 ESU's
2 - 8 inch = 2.5 ESU's
Total#: 34.5 ESU's @ $280.00 ea.
(Due prior to issuance of building permit)
Water Tap Inspection Fee:
Total #: 6 Connections @ $50.00 ea.
(Single family due prior to issuance of building permit)
(All other developments due prior to issuance of meter)
Domestic Water Meter Fee:
Total fl: 2 Domestic Meter(s) @ $204.34
(Single family due prior to issuance of building permit)
(Ail other developments due prior to issuance of meter)
Irrigation/Fireline Water Meter Fee:
Total #: 2 Irrigation Meter(s) @ $204.34
Total Ct: 0 Additional Irrigation Meter(s) @ $0.00
Total #: 2 Fireline Meter(s) @ $4,541.25
(100% due prior to issuance of water meters)
Domestic Water Meter Deposit Fee:
Total Ct: 2 Meter(s) @ $30.00 ea,
(100% due prior to issuance of water meters)
Irrigation/Fire Meter Deposit Fee:
Total Ct: 4 Meter(s) @ $30.00 ea.
(100% due prior to issuance of water meters)
Wastewater Impact Fee:
Total Domestic Meters ESU's: 16
(Due prior to issuance of building permit)
@ $280.00 ea.
Wastewater Tap Inspection Fee:
Total #: 2 Connections @ $50.00 ea.
(100% due prior to issuance of building permit)
Utility Final Inspection Fee (All developments):
Total Ct: 2 Lots @ $50.00 ea.
(100% due prior to issuance of building permit)
$9,660.00
$300.00
$408.68
$408.68
$0.00
$9,082,50
$60.00
$120.00
$,1,480.00
$100.00
$100.00
Park Fee (For Residential Developments Only):
Page 1
DEVELOPMENT FEE WORKSHEET
Preliminary plat approved:
After October 26, 1993
Single-family @ $0.00 per lot
Multi-family @ $0.00 per unit
(100% paid prior to Council approval of final plat)
$0.00
$0.00
$74,918,26
Information not Available
Roadway In]pact Fee:
(See attached fee calculations)
Street Lighting Fees:
Assessed for lighting in the City's right-of-way.
This fee cannot be assessed until after T.U. Electric submits
the lighting plan for the proposed development.
Once the plans are submitted, $292.60 per light will be assessed.
(100% due prior to final acceptance of development)
Street Sign Fees:
Assessed for signage in the City's right-of-way.
(See attached fee calculations if applicable)
Information not Available
Construction Inspection Fees:
A copy of the development contract must be submitted for assessment.
The contracts should indicate the cost to construct the improvements
that are inspected by the Engineering Department
(2% of development cost required for private improvements)
(4% of development cost required for public improvements)
Information not Available
Page 2
ROADWAY IMPACT FEE CALCULATIONS
PROJECT:
DATE:
Duke-Freeport Addition, Lots 2R 1 & 2R 2, Block
10/5/2005
ROADWAY IMPACT FEE:
Service Area * 4
Category ** Industrial
Land Use ** General Light Industrial
Building Area (si) 235,592
Developmeot Units ** 235.59
Vehicle Miles per Development Unit ** 1.06
Fee per Vehicle Mile *** $300
Roadway Impact Fee due (Development Units) x
'Vehicle Miles per Development Unit) x (Fee per Vehicle Mile) $74,918.26
* (Figure 2 - Roadway Impact Fee Study)
** (Table 3 - Roadway Impact Fee Ytudy)
*** (Schedule 2, Page 3 - Roadway Impact Fee Study)