Loading...
Chautaugua-CS 921124COPPELL PUBLIC WORKS MEMORANDUM DATE: November 24, 1992 TO: Garreth Campbell, Construction Inspector FROM: Rey Gonzalee, Streets Superintendent RE: Follow Up Walk Through - Chataqua Staff performed a follow up walk through on this project today and found the following items deficient; - Ponding still exist in eyebrow - correct - Seal random crack second entrance first panel; add an additional joint in this panel as well - Barricade incomplete median till such time that the landscaping is completed. If the Developer can send a letter of intent to complete these items, I will give a temporary release. Once completed, staff reserves the right to walk the project once more and note any additional deficiencies. If these are not in good order the project will be put on hold till such time the necessary corrections are made. If the project meets the standards established by the City a letter of acceptance will be submitted by this office to Engineering. If you have any questions, please let me know. RG/bc 75019 p~mn~c _w.Q~__K.s perm. 732 DEFOREST RD. P.O. BOX 478 COPPELL, TEXAS 750].9 ]:'AX .;l' (214) 393-764H FAX ~kTT., C~VT,:R F Z R!~: I A., I{ :__ PLEASE DELIVER PAGES TO: PACES (INCLUDING COVEI~ SIIEE'.P). ~ · ~.Tf you do nog rece.i.ve all of i:h¢: page;~, please call back as soon ;~s possible. T~].ephone Nol/(21,1) ,162-8,i95 and ask loc person DATE 11/24 TIME 1G:44 MESSAGE TX-TIME 08'42" DISTANT STATION ID 214 393 8948 CONF I RMAT I ON DATE: 11/24/92 I D: COPPELL PUBL I C MODE PAGES G3-S 082 TIME:16:45 RESULT OK