DATE:
FROM:
November 2, 1992
Garreth Campbell, Construction Inspector~
Howard Paf£o~d, Utilities Superintendent~'k
Walk-through Punchlist for Chatagua Place
Water/Sanitary Sewer
A punch list walk-through was conducted on the above
referenced project this morning and the following
it~ remain deficient.
Second Fire Hydrant and Valve. The hydrant has a
leak in its main valve and can't see if stack was
replaced due to stack being full of water.
Bethel School & Dakota - These valve stacks were
replaced, but need to be reset. Can't get on Valve
Nut.
Sra. 5+44.46 - can't see clean out to verify
correction covered with debri.
Please insure each of these items are corrected prior
to acceptance of project.
REQUEST FOR SERVICE
Date =
Time:
Taken by:
Name:
Address:
Phone:
Request:
Directed to'-~,~
Reply to:
Comment/action taken/reason denied:
Completion date: Initialed by:
COPPELL PUBLIC ~O~KS
October 27, 1992
Garreth Campbell, Construction Inspector
Howard L. Pafford, utilities Superintendent
Walk-through Punchlist for Chataqua Place -
Water/Sanita~-f Sewer
This morning a walk-through was conducted on the above referenced
project by Utilities field personnel. The following items were
found deficient on this project.
Sra. 0+00 - Manhole ring needs regrouting
Bethel School and Harris -
The mainline valve stack needs replacing.
The fire hydrant valve stacks needs replacing.
Sra. 1+32.00 - Remove wood from under manhole ring and
regrout.
4. Bethel School Road -
~. The two main lane val~es
be
/ replaced. ~L $¢~ool
_ ~. S~a. 5.44.~6~- Need ~o rese~ cleanou~ and cu~ and plug
/ ~Lo~ %4 - Needs new me=er ~ke
~ Lo~ %7 - Reset meter yoke and can
~k~ Main line valve on Harris - Need ~o replace s~ack.
Please insure ~ha~ each of ~hese i=~ are corrected prior ~o
acceptance of ~his project.
If you have any questions, please advise.
CHATAQUA. HLP
The City With A Beautiful Future
October 22, 1992
Box 478
.,~bppell, Texas 75019
21~4-462-0022
Mr. Mike Garrett
Nathan D. Maler
Three Northpark
8800 N. Central Expressway, Suite 300
Dallas, TX 75231
RE: Walk-Through
Chautauqua Place
Dear Mike:
Please be advised that a walk-through has been scheduled for Tuesday, October 27th at 8:30 a.m.
for the water, sanitary sewer, paving and drainage facilities in the referenced project.
Please ensure that all facilities are clean and accessible at that time and that contractor's
representatives are present to assist with the inspection.
Your cooperation in this effort is greatly appreciated. If you should have any questions, please
call at your earliest convenience.
Sincerely,
~~. pbell
~instm~°~arI;S;ectaff~d, Water Superintendent
Rey Gonzales, Street Superintendent
Mark Hicks, HCH Construction, Inc.
Rick. Burgett, Rebcon, Inc.
chautwlk