Chautaugua-CS 921102COPPBLL PUBLIC ~RAND~ DATE: FROM: November 2, 1992 Garreth Campbell, Construction Inspector~ Howard Paf£o~d, Utilities Superintendent~'k Walk-through Punchlist for Chatagua Place Water/Sanitary Sewer A punch list walk-through was conducted on the above referenced project this morning and the following it~ remain deficient. Second Fire Hydrant and Valve. The hydrant has a leak in its main valve and can't see if stack was replaced due to stack being full of water. Bethel School & Dakota - These valve stacks were replaced, but need to be reset. Can't get on Valve Nut. Sra. 5+44.46 - can't see clean out to verify correction covered with debri. Please insure each of these items are corrected prior to acceptance of project. REQUEST FOR SERVICE Date = Time: Taken by: Name: Address: Phone: Request: Directed to'-~,~ Reply to: Comment/action taken/reason denied: Completion date: Initialed by: COPPELL PUBLIC ~O~KS October 27, 1992 Garreth Campbell, Construction Inspector Howard L. Pafford, utilities Superintendent Walk-through Punchlist for Chataqua Place - Water/Sanita~-f Sewer This morning a walk-through was conducted on the above referenced project by Utilities field personnel. The following items were found deficient on this project. Sra. 0+00 - Manhole ring needs regrouting Bethel School and Harris - The mainline valve stack needs replacing. The fire hydrant valve stacks needs replacing. Sra. 1+32.00 - Remove wood from under manhole ring and regrout. 4. Bethel School Road - ~. The two main lane val~es be / replaced. ~L $¢~ool _ ~. S~a. 5.44.~6~- Need ~o rese~ cleanou~ and cu~ and plug / ~Lo~ %4 - Needs new me=er ~ke ~ Lo~ %7 - Reset meter yoke and can ~k~ Main line valve on Harris - Need ~o replace s~ack. Please insure ~ha~ each of ~hese i=~ are corrected prior ~o acceptance of ~his project. If you have any questions, please advise. CHATAQUA. HLP The City With A Beautiful Future October 22, 1992 Box 478 .,~bppell, Texas 75019 21~4-462-0022 Mr. Mike Garrett Nathan D. Maler Three Northpark 8800 N. Central Expressway, Suite 300 Dallas, TX 75231 RE: Walk-Through Chautauqua Place Dear Mike: Please be advised that a walk-through has been scheduled for Tuesday, October 27th at 8:30 a.m. for the water, sanitary sewer, paving and drainage facilities in the referenced project. Please ensure that all facilities are clean and accessible at that time and that contractor's representatives are present to assist with the inspection. Your cooperation in this effort is greatly appreciated. If you should have any questions, please call at your earliest convenience. Sincerely, ~~. pbell ~instm~°~arI;S;ectaff~d, Water Superintendent Rey Gonzales, Street Superintendent Mark Hicks, HCH Construction, Inc. Rick. Burgett, Rebcon, Inc. chautwlk ! Lo'~ 7