Chautaugua-CS 920109The City With A Beautiful Future
.O. Box 478
oppell, Texas 75019
4-462-0022
We are enclosing a copy of the City of Coppell Development Fee Assessment
list along with copies of the development fee calculations for the
Chautauqua Place Addition to the City of Coppell.
Please provide a check made payable to the City of Coppell in the amount
of $39,692.63 plus 2% of the construction cost, and forward it to Ms.
Carolyn Bebermeyer, Finance Department, along with a copy of the Fee
Assessment list. In addition, please provide our office with a copy of
your Engineer's Estimate for this project or contract amount for
verification of the construction inspection fee.
Please provide a copy of your paid receipt to our office and to Shimek,
Jacobs & Finklea, Attn: Mr. Gary C. Hendricks. Copies of your receipts
will help us verify payment of the required fees and assure a successful
beginning of this project.
We look forward to working with you on this project.
questions, please do no hesitate to contact me.
If you have amy
Sincerely,
Kenneth M. Griffin, P.E.
City Engineer
~MG/bd
cc:
Gary Sieb, Director of Planning and Community Services
Steve Goram, Director of Public Works
Carolyn Bebermeyer, Finance Department
Gary C. Hendricks, P.E., Plan Review Engineer
M. Shohre Daneshmand, P.E., Civil Engineer
CITY OF COPPELL
DEVELOPMENT FEES
Date: January 9, 1992
Project: Chautauqua Place
Total
Assessment
Amount Due
Prior to
Council
Approval
Park Fee
(50% payable prior to Council Approval)
(50% payable with Building Permit)
4,350.00
2,175.00
Water Impact Fee
(100% due prior to Council Approval)
$24,050.00
$24,050.00
Water Tap Inspection Fee $ 3,000.00
(100% due at Issuance of Building Permit)
Wastewater Impact Fee
(100% due prior to Council Approval)
$13,050.00
$13,050.00
Sewer Tap Inspection Fee $ 2,900.00
(100% due at Issuance of Building Permit)
Street Sign Fee
(100% due prior to Council Approval)
$ 417.63
$ 417.63
Street Light Fee
(100% due prior to Council Approval)
Construction Inspection Fee
(100% due prior to Council Approval)
(Based on 2% of project construction
cost to be provided by the
Developer's Engineer)
TOTALS
$47,767.63
$39,692.63
TOTAL AMOUNT DUE PRIOR
TO COUNCIL APPROVAL:
$39,692.63
Plus 2%
Construction
Inspection Fee
* This fee cannot be assessed until after TU Electric submits the lighting
plan for the proposed project. Once the plan is submitted, $292.60 per
light will be assessed.
Note:
This project is NOT within the Coppell Municipal Utility District
No. 1. Therefore, the Wastewater Impact Fee is due prior to
Council Approval.
CHADEV1
COPPET. T. P~BLIC WORF~
December 4, 1991 FILE COPY
Shohre Daneshmand, Acting City Engineer
Public Works Staff~
Development Fees for Chautauqua Place
The following fees should be assessed on the above referenced
project.
Water Impact Fee:
29 - 5/8" x 3/4"
Domestic Meter/s =
Irrigation Heter/s =
Fireline Meter/s =
29 ESU's
8 ESU's
ESU's
Total 37 ESU's 0 $650.00 ea = 324.050.00
100% due prior to Council approval of final plat.
City Wastewater Impact Fee=
2--9 - 5/8" x 3/4" Domestic Heter/s = 29 ESU's ~ $450.00 = $13.050.00
100% due prior to Council approval of final plat.
Water Tap Inspection Fee
30 Connections ~ 8100.00 each = $3,000.00
100% due prior to issuance of building permit. (Or in the case of
the irrigation meter-prior to issuance of meter).
Sewer Tap Inspection Fee
29 Connections 0 $100.00 each = $2,900.00
100% due prior to issuance of building permit.
Street Lighting Fee
Shall be assessed and paid prior to final acceptance of project.
Note: This fee cannot be assessed until after TU Electric submits
the lighting plan for the proposed project. Once plan is
submitted $292.60 per light will be assessed.
Street Signs Fee
See attached Street sign assessment sheet.
100% due prior to final acceptance of project.
Park Fee
29 Residential Lots at $150.00 each = $4,350.00
N/A Units (Multi family) at $75.00 each = $ N/A
50% of the amount specified above shall be paid by the Developer~
prior to Council approval of final plat.
50% remaining shall be paid by the Builder at such time as a
building permit is issued.
Please advise the Developer of these fees and due dates.
If you have any questions regarding these assessments please
advise.
HLPImp
cc: Steven G. Goram, Director of Public Works
DEVELFEE.HLP
STREET SIGN ASSESSMENT
for Chautauqua Place
The following assessment is being made in accordance with the City
of Coppell Subdivision Ordinance Appendix A chapter VIII A. The
following cost of those sign materials required are based on
current pricing which is reviewed on a regular basis.
SIGN UNIT PRICE OUANTITY
EXTENDED PRICE
No Parking $ 53.10
Speed Limit $ 63.54 2 $ 127.08
Yield $ 58.56
Stop $ 65.12
Street Name $ 11.60
Stop & Street Combo $ 96.85 3 S 290.55
TOTAL $ 417.63
* Cost breakdowns may be obtained from Public Works by written
request.
Revised 4/1/91