MA FY 0405-LR050831Hooper Engineering Laboratories, Inc.
Construction Materials Testing
REPORT OF CONCRETE TESTS JOB NO.:
CLIENT: Pavement Services Corp. DATE:
PROJECT: City of Coppell Street Repair Project SUPPLIER:
Job #03-007, Coppell, TX
LOCATION OF POUR SET 1: Paving, v~-~lCound Cambria at 446 residence
LOCATION OF POUR SET 2:
02.1077
31 August 2005
Pavement Ser.
SAMPLE DATA: SET 1 SET 2 MIX NO.
Truck No. Cement
Ticket No. Flyash
Time Batched Sand
Time Sampled ~n.
Concrete Temp. (ASTM C1064) 1.0 in.
Air Content {ASTM C231) Water
Unit Weight {ASTM C138) Admix //1
Ambient Temp. Admix #2
AEA
COMPRESSIVE STRENGTH TESTS IASTM C39)
(Standard 6 inch x 12 inch cylinder)
Cylinder Slump Age Test Total Load Compressive Required
Number Inches Days Date Pounds Stren.gth 28-Day
(ASTM C 143) psi Strength
461 15 09/15/05
462 28 09/28/05
463 28 09/28/05
134,700 4760
140,800 4980
139,400 4930
28-Day Average 4960
4O00
NOTE: Cylinders and all information furnished by contractor.
TECHNICIAN:
DISTRIBUTION:
1 hour lab. processing
(1) Pavement Services Corp.
(1) City of Coppell
2870 Walnut Hill Lane Dallas, Texas 75229 (214) 351-6419 Fax (214) 351-5148