Loading...
DR0401-CS051004COPPELL October 4, 2005 Kay Keene, President Whitewater Construction Co. 6640 Old Mexia Rd Waco TX 76705 RE: Oakcrest Barrow Ditch Drainage Improvements, Project # DR 04-01 Final Acceptance Dear Ms. Keene: The improvements in the above referenced project were inspected during construction by the City of Coppell Engineering Department and were installed according to plans and our specifications governing such work. As of August 15, 2005, the facilities are accepted subject to the two-year maintenance agreement. Thank you for your cooperation during this construction, and if I can be of further servic:, please contact me at (972) 304-3685. Sincerely, Construction Inspector Office Phone: (972) 304-3685 Fax: (972) 304-3570 Keith R. Marvin, P.E. Assistant City Engineer CC; Ken Griffin, P.E., Director of Engineering & Public Works Glenn Hollowell, P.E., Assistant Director of Public Works 2S5 PARKWAY 3¥ p+O.BOX 9478 ~ COPPELL TX 7§019 ~/~ TEL 9'72/462 0022 3~{ FAX 972/304 3673