Loading...
Callahan-CS030902T H IE C; I T Y 0 F September 2, 2003 Tim Bonner Bonner Associates 737 S RL Thomton Fwy Dallas, TX 75203 Callahan Medical Center Final Acceptance Dear Mr. Bonner: Representatives of the City of Coppell have confirmed a final inspection of paving and utilities for the referenced project. The two-year maintenance bond and the as-built construction drawings have been received. Maturity on the maintenance bond will be two years from the date of this letter. Thank you for your cooperation during this project. Sincerely, Rick O'Dell Construction Inspector Office Phone: (972) 304-7090 Fax: (972) 304-3570 CC: Ken Griffin, Director of Engineering & Public Works Rhonda Brothers, Engineering Secretary Glenn Hollowell, Director of Public Works Greg Jones, Chief Building Official Travis Crump, Fire Marshal Walter J. Nelson, P. E.