Loading...
Cambridge Phase 1-CS 950105The City With A Beautiful Future P. 0 Box 478 Coppell, Texas 75019 214 o 462-0022 FAX 214 - 393-0948 January5, 1995 Mr. Jack Bommarito P.O. Box 2312 Coppell, TX 75019 RE: Cambridge Manor Estates Final Acceptance Dear Sir: A final inspection of paving and utilities for the referenced project has been confirmed by representatives of the City of Coppell. The two-year maintenance bonds and as-built drawings have been received from the contractor. Maturity on the bonds will be two years from the date of this letter. Maturity on the Erosion Control Bond will also be two years from the date of this letter. Construction Inspector CC: Kenneth M. Griffin, P.E., Asst. City Manager/Dir. Public Works Howard Pafford, Utilities Superintendent Rey Gonzales, Street Superintendent Greg Jones, Chief Building Official Troy Glidewell, Fire Marshal Dowdey Anderson Site Concrete Burkhart Contractors Doug Stevens, Engineering Technician