Cambridge Phase 1-CS 940713The City With A Beautiful Future
July 13, 1994
Mr. Bill Anderson
Dowdey, Anderson and Associates, Inc.
16250 Dallas Parkway
Suite 100
Dallas, TX 75248
RE: Estates of Cambridge Manor
Development Fee Assessment
D O Box 478
CoDDe ~ Texas 75019
~.~,? :AX 214 393-0948
Dear Mr. Anderson:
Enclosed is a copy of the City of Coppell Development Fee Assessment list, along with a copy of
the Development Fee Calculations for Estates of Cambridge Manor.
Please provide a check made payable to the City of Coppell in the amount of $119,941.45 and
forward it to Mr. Alan Johnson, Finance Director, along with a copy of the Fee Assessment List.
Please provide our office a copy of the Engineer's Estimate or contract for this project so the
construction inspection fee can be verified.
By providing a copy of your paid receipt to our office, it will help us to verify payment of the
required fees and insure a successful beginning of this project.
We look forward to working with you on this project. If you have any questions, please do not
hesitate to contact me.
Sincerely,
Kenneth M. Griffin, P.E.
Assistant City Manager/City Engineer
cc: ~,4~'ve Goram, Director of Public Works
Alan Johnson, Finance Director
Greg Jones, Building Official
Doug Stevens, Engineering Technician
-- CITY OF COPPELL
DEVELOPMENT FEES
Date:
Project:
July 13, 1994
Estates of Cambridge Manor
TOTAL AMOUNT DUE
FEES DUE PRIOR TO
COUNCIL
APPROVAL.
Water Impact Fee $ 39,650.00 $ 39,650.00
(100% due prior to Council Approval)
Water Tap Inspection Fee $5,100.00 -0-
(100% due at Issuance of Building Permit)
Wastewater Impact Fee $ 20,700.00 $ 20,700.00
(100% due prior to Council Approval)
Sewer Tap Inspectkm Fee $ 4,600.00 -0-
(100% due at Issuance of Building Permit)
Utility Final Inspection Fee $ 2,300.00 -0-
(100% due at Issuance of Building Permit)
Water Meter Fee (Domestic) $ 1,023.50 4)-
(100% due at Issuance of Building Permit)
Water Meter Deposit (Non-Residential) 4)- 4)-
(100% due at Issuance of Water Meters)
Water Meter Deposit (Residential) $ 1,380.00 -0-
(100% due at Issuance of Building Permit)
Water Meter Fee (Irrigation & Fire) 5~ .~,.~L /~ ~q. 4*'~ $34-3'750 4)-
(100% due at Issuance of Water Meters) / ~/t/~_ [~,,y/
Irrigation Meter Deposit $ 175.00 -0-
(100% due at Issuance of Water Meters)
Street Sign Fee $ 631.45 $ 631.45
(100% due prior to Acceptance of Project)
Street Light Fee * information not -0-
(100% due prior to Acceptance of Project) available
Park Fee $ 59,110.00 $ 59,110.00
(100% due prior to Council Approval)
Construction Inspection Fee need submittal of -0-
(2% of Project Cost due prior to Preconstr. Mtg.) contracts
TOTAL $ 134,983.45
TOTAL AMOUNT DUE PRIOR TO COUNCIL APPROVAL $119,941.45
* This fee cannot be assessed until after TU Electric submits the lighting plan tbr the proposed project. Once the plan
is submitted, $292.60 per light will be assessed.
COPPELL PUBLIC WORKS
MEMORANDUM
DATE:
TO:
FROM:
RE:
July 11, 1994
Engineering Department
Public Works Staff
Development Fees for Cambridge Manor
The following fees should be assessed and collected
referenced project.
Water Impact Fee:
46 - 5/8" x 3/4"
Total 61
Domestic Meter/s = 46 ESU's
Irrigation Meter/s = 10 ESU's
Fireline Meter/s = 5 ESU's
ESU's @ $650.00 ea = $ 39,650.00
100% due prior to Council approval of the final plat.
on the
above
Wastewater Impact (City)
46 - 5/8" x 3/4" Domestic Meter/s =
Total 46 ESU's @ $450.00 ea =
46 ESU's
$ 20,700.00
100% due prior to Council approval of the final plat.
Water Tap Inspection Fee
51 Connections @ $100.00 each = $ 5.100.00
100% due prior to issuance of building permit for residential. (Or in
the case of multi-family, commercial, retail, industrial, fee is due
prior to issuance of meter).
Sewer Tap Inspection Fee
46 Connections @ $100.00 each = $ 4,600.00
100% due prior to issuance of building permit. (Residential only)
Development Fees
Page 2
Utility Final Inspection Fee (Ail Development)
46 lots @ $50.00/lot = $ 2,300.00
100% due prior to issuance of building permit.
Water Meter Fee (Domestic)
46 - 5/8" x 3/4" Domestic Meters ~ $22.25 ea = $ 1,023.50
100% due prior to issuance of building permit for residential only.
Ail other development fees are due prior to issuance of meter/s.
Water Meter Fee (Irrigation/Fireline)
4 - 1" Irrigation Meter/s @ $ 46.10 ea = $ 184.40 ~
1 - 1 1/2" Fireline Meter/s ~ $ 129.10 ea = $ 129.10
100% due prior to issuance of water meter/s.
Water Meter Deposit (Residential)
46 Meters @ $30.00 ea = $ 1,380.00
100% due prior to issuance of building permit.
Water Meter Deposit (Multi-Family or Non-Residential)
Meters @ $35.00 ea = $
100% due prior to issuance of water meters.
Irrigation Meter Deposit
5 Meters @ $35.00 ea = $ 175.00
100% due prior to issuance of water meters.
Development Fees
Page 3
Park Fee
For those developments having preliminary plat approval prior to June
23, 1992 the following assessment is determined:
N/A Residential Lots at $150.00 each = $
N/A Units (Multi family) at $75.00 each = $
50% of the amount specified above shall be paid by the Developer;
prior to Council approval of final plat.
50% remaining shall be paid by the Builder at such time as a building
permit is issued.
For those developments having preliminary plat approval after June 23,
1992 the following assessment is determined:
N/A Residential Lots at $350.00 each = $
N/A Units (Multi-Family) at $350.00 each = $
50% of the amount specified above shall be paid by the Developer prior
to Council approval of final plat.
50% remaining shall be paid by the Builder at such time as a building
permit is issued.
For those developments having preliminary plat approval after October
26, 1993 the following assessment is determined:
46 Residential Lots at $1,285.00 each = $ 59,110.00
Units (Multi-Family) at $1,285.00 each = $
100% of the amount specified above shall be paid by the Developer
prior to Council approval of final plat.
Please advise the Developer of these fees and due dates.
If you have any questions regarding these assessments please advise.
Street Lighting Fee
Shall be assessed and paid prior to final acceptance of project.
Note: This fee cannot be assessed until after TU Electric submits
the lighting plan for the proposed project. Once plan is
submitted $292.60 per light will be assessed.
Development Fees
Page 4
Street Signs Fee
See attached Street Sign Assessment sheet.
lOO% due prior to final acceptance of project.
cc: Steven G. Goram, Director of Public Works
G. Greg Jones, Chief Building Official
Development Fees
Page 5
STREET SIGN ASSESSMENT
for The Estates of Cambridge Manor
The following assessment is being made in accordance with the City of
Coppell Subdivision Ordinance Appendix A Chapter VIII A. The
following cost of those sign materials required are based on current
pricing which is reviewed on a regular basis.
SIGN UNIT PRICE QUANTITY EXTENDED PRICE
No Parking $53.10
Speed Limit $63.54 5 317.70
Yield $58.56
Stop $65.12
Street Name $11.60 1 11.60
Stop & Street Combo $96.85 3 290.55
OTHER
No Outlet $11.60 1 11.60
* Cost breakdowns may be
request.
TOTA~
obtained from Public
$631.45
Works by written
DEVFEES.HLP Revised 1/14/94