Loading...
Cambridge Phase 1-CS 9406200~/~/~4 09:~4 C~T¥ ~F COPPELL 00~ DO~IDEY, ANDERSON AND ASSOCIATES, INC, CIVIL ENGINEERS 16250 DALLAS I~RKVVAY SUITE DALI~5, TE~S 75248 ~14) 931-0694 F~ (214) 931 June 20, 1994 Mr. Kenneth Griffin, City Engineer City of Coppell 255 Parkway Boulevard Coppell, Texas 75019 Dear Kenneth: we are in the process of completing ithe fill :for The Estates of Cambridge Manor. TO complete the process, ou~iclient purchased a tract of land east of the site. To transporti the material tolthe site, it will be necessary to disturb a section of DeForest R~ad. Approximately 550 L.F. of roadway will be disturbed. DeForest Road appears to consist of a combination of flexbase (approximatel~ 3" thick) with a poor surface course of 1"; The roadway' is approximately 15 feet wide. We recommend that the surface be scarified, and re-compacted on :the existing surface. Upon the completion of the haul operation, we will replace the surface with a 2" surface Course treatement of H.M,A.C. If you have any questions please contact me. Very truly yours, William A. Anderson, WAA; J rb × 450, 2 ¢56.6 CITY OF COPPELL !~0. 2~&/393.-oga8 FA~ MO.