Loading...
Cambridge Phase 1-PT 950202Bore/Excavation in Public Right-Of-Way Permit City of Coppe!l - Public Works Department Date: Permit Issued To: Name: Address-. Phone: Emergency Phone: Representing: InspeCtOr: Phone: T~rpe of Work/General Description: Location of Work: ~l~g ~ ~ · ~/~F Have ,il City and/or Franchise gtilicies Been Contacted and Existinq Utilities Located: / YES Will I~ 3e Necess~ to ~xcav~te Street, ~ley or Side~alk Payment? ~ YES (attach pe~it) NO Representative(s) of the Franchise/Contractor must adhere to all construction standards approved by the City of Coppell, which includes but is not limited to: Compaction of Trenches and Bores, and Barricading according to the Texas Manual on Uniform Traffic Control Devices. ~%rea(s) affected must be restored to as good condition as before the commencement of work. A~y excavation requiring closing of a street or alley must be reported to the Police, Fire, and Public Works Depa/-tments prior to closing (.%62-1144, 462-1133 and 462-8495). Attach Work Order (Franchise Only) PAGE 2 PER~!T Attach Barricading/Detour Plan if a lane or street closure is applicable. Franchise/Contractor Representative Franchise Appruv~ Inspector/or City Inspector Applicant shall indemnify and forever hold harmless against each and eve~/ claim, demand or cause of action that may be made or come against it by reason of or Lf any way arising out of the closure, blocking, excavating, cutting, tunneling, or other work by the applicant under per~. it frcm the City, if such permit is granted. PEri, IT. PIIB Ail contractors will contact Public Works @ 462-8495 to have trenches and/or open cuts inspected prior to back fill operation taking place. Staff will be sent to inspect the project. * NO WET BORES ALLOWED! MAIN r- '<2 ; r~ o r,~oDr E TOTAL - . 4" --~ ~ ; ~A ~ e POLY VALVE NO WET BORE ~eg ~ALLOWED *('O'behinu P.L. e Lot Line) LONE STAR GAS COMPANY BUSINESS D~ELOPUENT DEPT, NONE ~ ~*w" "W- NABOR~