Cambridge Phase 1-PT 950111I_3G RICH~RgSi]N TTL:214-255-4690 3a.n L1'95 15:41 No.O01
Bor~[Excav=t-ion in PubI£c Right-Of-way Pezmi=
City of CoRpe!I - Public Works Depa---tmenn
Name
Represen~a:ive(s) of ~he Franchise/Con==ac~or must adhere ~c all
construction s=andards apgroved by =he City cf Coppell, which
includes but is no= limited to: Compacui0n of Trenches and Bores,
and Barricading according ~o =he Texas ~anual on Uniform Traffic
Control Devices. Area(s) affected must be restored to as good
condition as before =he commencement of work.
Any excavauion requiring closing of a sureet
reported no the police, Fire, and Public Works
=o clo~ing (462--1144, 462--1133 and 462-8495).
Work Orde= (Franchise Only]
cr alley mus~ be
Departments prior
LSG RICHRRSSON TEL:214-25S-4690 fan i1'95 15:41No.O01P.05
A:=ach Ba_--r£cadJ. ng/De'aou= .~ian £~ a lane or s~r~e= closure is
Dare
A~!iCan: shoal! indemnify and foreve: hold ha~-~less against each
amd eve---Z claim, demand o= cause of acniom nba= may he made o= come
aqalns= in by reason of cr if any way a=isinq our cf =he closure,
bkccking, excava=img, cutting, uunne!ing, or o~her work
PEIL.H!T. PIiB
All contractors will contact Public Works @ 462-8495 to have
trenches and/or open cuts inspected prior to back fill operation
e~king place. Staff will be sent to inspect the project.
* NO WET BOHES
C~
Z
LEGEND
i · POLY I~El~ UCE R
LONE STAR GAS COMPANY
I~U$INBI DL:¥EL0~tEIfl'
CAMBRIDGE MANOR
°~ANy ~
COPPELL, TEXAS