Cambridge Phase 2-CS 970516DATEs
TO:
FROM:
RE:
COPPELL STREET DIVISION
M~y 16, 1997
Larry Davis, Construction Inspector
Brent Adams, Streets Division
Cambridge Manor Phase II
Listed below are Street Division comments relative to walk thru.
1. Clean Q~t RCP under street approach off of Deforest.
Repair curb scar north of first meter box on east side of road
off of Deforest.
Repair curb on west side of road adiacent to fire hydrant at
saw cut: also can be determined on west side of roadway.
May be bird bath at new concrete and existina on south side
straiaht away.
Finish sealina in 90 dearee turn & straiaht away into the
addit 0n,
t