Loading...
Cambridge Phase 2-CS 970516DATEs TO: FROM: RE: COPPELL STREET DIVISION M~y 16, 1997 Larry Davis, Construction Inspector Brent Adams, Streets Division Cambridge Manor Phase II Listed below are Street Division comments relative to walk thru. 1. Clean Q~t RCP under street approach off of Deforest. Repair curb scar north of first meter box on east side of road off of Deforest. Repair curb on west side of road adiacent to fire hydrant at saw cut: also can be determined on west side of roadway. May be bird bath at new concrete and existina on south side straiaht away. Finish sealina in 90 dearee turn & straiaht away into the addit 0n, t