Carter Phase 2-CS 981208The City With A Beautiful Future
P.O. Box 478
Coppell, Texas 75019
214-462-0022
December 8, 1997
Robert L. Wright, P.E.
Needham Wright Engineers, Inc.
10290 Monroe Dr., Suite 305
Dallas, TX 75229
Carter Addition, Phase II
Development Fee Assessment
Dear Mr Wright:
Enclosed is a copy of the City of Coppell Development Fee Assessment table, along with a copy
of the Development Fee calculations for the referenced development.
Please make paYment to the City of Coppell in the amount of $15,200.00 and forward to the
Finance Depat'tcaent along with a copy of the Fee Assessment ruble. This amount is a portion
of the assessed fees which need to be paid prior to Council approval. Please refer to attached
table for additional fees. Also provide a copy of the Engineer's estimate or contract to our office
so the construction inspection fee can be verified.
Providing a copy of your paid receipt to the Engineering Depa~biient will help us to verify the
payment of required fees and insure a successful beginning of this project. We look forward
to working with you on this project. If you have any questions, please contact me.
Sincerely, ~
Director of Engineering & Public Works
Jennifer Armstrong, Finance Director
Doug Stevens, Engineering Technician
Public Services
Greg Jones, Chief Building Official
Gary Sims, Dir. Leisure Services
DEVELOPMENT FEE WORKSHEET
PROJECT: Carter Addition, Phase II
DATE: 12/8/97
Water Impact Fee:
Domestic Meter(s):
Irrigation Meter(s):
5 - 5/8 inch X 3/4 inch
Fireline Meter(s):
Total #: 5 ESU's @ $450.00 ea.
(100% due prior to Council approval of the final plat)
Water Tap Inspection Fee:
Total #: 5 Connections @ $50.00 ea.
(Single family due prior to issuance of building permit)
(All other developments due prior to issuance of meter)
Water Meter Fee (Domestic):
Total #: 5 Domestic Meter(s) @ 924.14
(Single family due prior to issuance of building permit)
(All other developments due prior to issuance of meter)
Water Meter Fee (Irrigation/Fireline):
Total #: 0 Irrigation Meter{s) @
Total #: 0 Additional Irrigation Meter(s) @
Total #: 0 Fireline Meter(s) @
(100% due prior to issuance of water meters)
Water Meter Deposit Fee (Domestic):
Total #: 5 Meter(a) @ $30.00 ea.
(100% due prior to issuance of water meters)
Irrigation/Fire Meter Deposit Fee:
Total #: O Meter(s) @ $35.00 ea.
(1OO% due prior to issuance cf water meters)
Wastewater Impact Fee:
Total Domestic Meters ESU'
5
@ 9450.00 ea.
Wastewater Tap Inspection Fee:
Total #: 5 Connections @ $50.00 ea.
(100% due prior to issuance of building permit)
Utility Final Inspection Fee (All developments):
Total #: 5 Lots @ 950.00 ea.
(100% due prior to issuance of building permit)
5 ESU's
'ESU's
ESU's
ESU's
92,250.00
9250.00
9120.70
90.00
90.00
90.00
9150.00
90.00
92,250.00
$250.00
9250.00
Page 1
DEVELOPMENT FEE WORKSHEET
Park Fee (For Resdential Developments Only):
* Preliminary plat approved prior to June 23, 1992:
N/A
N/A
Single-family @ $150.00 / Lot
Multi-family @ $75.00 / Unit
(50% paid prior to Council approval of final plat)
(50% paid at issuance of building permit)
Preliminary plat approved after June 23, 1992:
N/A
N/A
Single-family @ $350.00 / Lot
Multi-family @ $350.00 / Unit
(50% paid prior to Council approval of final plat)
(50% paid at issuance of building permit)
Preliminary plat approved after October 26, 1993:
5
N/A
Single-family @ $1285.00 / Lot
Multi-family @ $1285.00 / Unit
(100% paid prior to Council approval of final plat)
Roadway Impact Fee:
(See attached fee calculations)
Street Lighting Fees:
Assessed for lighting in the City's right-of-way.
This fee cannot be assessed until after T.U. Electric submits
the lighting plan for the proposed development.
Once the plans are submitted, $292.60 per light will be assessed.
(100% due prior to final acceptance of development)
N/A
N/A
N/A
N/A
$6,425.00
N/A
$4,275.00
Information not
available at this time
Street Sign Fees:
Assessed for signage in the City's right-of-way.
(See attached fee calculations if applicable)
available at this time
Construction Inspection Fees:
A copy of the development contract must be submitted for assessment.
The contracts should indicate the cost to construct the improvements
that are inspected by the Engineering Department.
(2% of development cost required for private improvements)
(4% of development cost required for public improvements)
Need submittal of
development comxacts
Page 2
DEVELOPMENT FEE TABLE
Project: Carter Addition, Phase II
Date: 12/8/97
TOTAL AMOUNT DUE
FEES DUE PRIOR TO
COUNCIL
APPROVAL
Water Impact Fee $2,250.00 $2,250.00
(100% due prior to Council Approval)
Water Tap Inspection Fee $250.00
(100% due at Issuance of Water Meter)
Water Meter Fee (Domestic) $120.70
(100% due at Issuance of Water Meter)
Water Meter Fee (Irrigation/Fireline) $0.00
(100% due at Issuance of Water Meter)
Water Meter Deposit (Domestic) $150.00
(100% due at Issuance of Water Meter)
Irrigation/Fireline Meter Deposit $0.00
(100% due at Issuance of Water Meter)
Wastewater Impact Fee $2,250.00 $2,250.00
(100% due prior to Council Approval)
Wastewater Tap Inspection Fee $250.00
(100% due at Issuance of Buildin$ Permi0
Utility Final Inspection Fee $250.00
(100% due at Issuance of Building Permit)
Park Fee $6,425.00 $6,425.00
(100% due prior to Council Approval)
Roadway Impact Fee $4,275.00 $4,275.00
(100% due prior to Council Approval)
Street Light Fee Information not
(100% due prior to Acceptance of Project available at this time
Street Sign Fee Information not
(100% due prior to Acceptance of Project available at this time
Construction Inspection Fee Need submiual of
development contracts
TOTAL $16,220.70
TOTAL AMOLrNT DUE PRIOR TO COUNCIL APPROVAL $15,200.00
ROADWAY IMPACT FEE CALCULATIONS
PROJECT:
DATE:
Carter Addition, Phase H
12/8/97
ROADWAY IMPACT FEE:
Service Area * 6
Category ** Residential
Land Use **
Buildin~ Size (ScI. Ft.)
Development Units **
Vehicle Miles per Developmem Unit **
Fee per Vehicle Mile ***
Single-Family Detached
N/A
5
2.85
$300
Roadway Impact Fee due = (Development Units) x
(Vehicle Miles per Development Unit) x (Fee per Vehicle Mile) = $4,275.00
* (Figure 2 - Roadway Impact Fee Study)
** (Table 3 - Roadway Impact Fee Study)
*** (Schedule 2, Page 3 - Roadway Impact Fee Study)