January ll, 1999
Castlebury Court
Development Fee Assessment
Dear Mr. Goodwin:
Enclosed is a copy of the City of Coppell Development Fee Assessment table, along with a copy
of the Development Fee calculations for the referenced development.
Please make payment to the City of Coppell in the amount of $60,010.00 and forward to the
Finance Department along with a copy of the Fee Assessment table. This amount is a portion
of the assessed fees which need to be paid prior to Council approval. Please refer to attached
table for additional fees. Also provide a copy of the Engineer's estimate or contract to our office
so the construction inspection fee can be verified.
Providing a copy of your paid receipt to the Engineering Department will help us to verify the
payment of required fees and insure a successful beginning of this project. We look forward
to working with you on this project. If you have any questions, please contact me.
Sincerely,__
Michael A. Martin, P.E.
Assistant City Engineer
CC:
Jennifer Armstrong, Finance Director
Doug Stevens, Engineering Technician
Glenn Hollowell, Assistant Director of Public Works
Greg Jones, Chief Building Official
Gary Sims, Director of Leisure Services
DEVELOPMENT FEE TABLE
Project: Castlebury Court
Date: 1/11/99
TOTAL AMOUNT DUE
FEES DUE PRIOR TO
COUNCIL
APPROVAL
Water Impact Fee $10,800.00 $10,800.00
(100 % due prior to Council Approval)
Water Tap Inspection Fee $1,000.00
(100% due at Issuance of Water Meter)
Water Meter Fee (Domestic) $471.77
(100% due at Issuance of Water Meter)
Water Meter Fee (Irrigation/Fireline) $142.80
(100% due at Issuance of Water Meter)
Water Meter Deposit (Domestic) $665.00
(100% due at Issuance of Water Meter)
Irrigation/Fireline Meter Deposit $30.00
(100% due at Issuance of Water Meter)
Wastewater Impact Fee $8,550.00 $8,550.00
(100% due prior to Council Approval)
Wastewater Tap Inspection Fee $950.00
(100% due at Issuance of Building Permit)
Utility Final Inspection Fee $950.00
(100% due at Issuance of Building Permit)
Park Fee $24,415.00 $24,415.00
(100% due prior to Council Approval)
Roadway Impact Fee $16,245.00 $16,245.00
(100% due prior to Council Approval)
Street Light Fee Information not
(100 % due prior to Acceptance of Project available at this time
Street Sign Fee Information not
(100% due prior to Acceptance of Project available at this time
Construction Inspection Fee Need submittal of
development contracts
TOTAL $64,219.57
TOTAL AMOUNT DUE PRIOR TO COUNCIL APPROVAL $60,010.00
DEVELOPMENT FEE WORKSHEET
PROJECT: Castlebury Court
DATE: 1/11/99
Water Impact Fee:
Domestic Meter(s):
Irrigation Meter(s):
Fireline Meter(s):
19 - 5/8 inch X 3/4 inch = 19
1 - 1 1/2 inch = 5
Total #: 24 ESU's @ $450.00 ea.
(100% due prior to Council approval of the final plat)
Water Tap Inspection Fee:
Total #: 20 Connections @ $50.00 ea.
(Single family due prior to issuance of building permit)
(All other developments due prior to issuance of meter)
Domestic Water Meter Fee:
Total #: 19 Domestic Meter(s) @ $24.83
(Single family due prior to issuance of building permit)
(All other developments due prior to issuance of meter)
Irrigation/Fireline Water Meter Fee:
Total 0: 1 Irrigation Meter(s) @
Total #: 0 Additional Irrigation Meter(s) @
Total #: 0 Fireline Meter(s) @
(100% due prior to issuance of water meters)
$142.80
Domestic Water Meter Deposit Fee:
Total#: 19 Meter(s) @ $35.00 ea.
(100% due prior to issuance of water meters)
Irrigation/Fire Meter Deposit Fee:
Total #: 1 Meter(s) @ $30.00 ea.
(100% ~ue prior to issuance of water meters)
Wastewater Impact Fee:
Total Domestic Meters ESU's:
19
@ $450.00 ea.
Wastewater Tap Inspection Fee:
Total #: 19 Connections @ $50.00 ea.
(100% due prior to issuance of building permit)
Utility Final Inspection Fee (All developments):
Total 0: 19 Lots @ $50.00 ea.
(100% due prior to issuance of building permit)
ESU's
ESU's
ESU's
ESU's
$10,800.00
$1,000.00
$471.77
$142.80
$0.00
$0.00
$665.00
$30.00
$8,550.00
$950.00
$950.00
Page 1
DEVELOPMENT FEE WORKSHEET
Park Fee (For Residential Developments Only):
* Preliminary plat approved prior to June 23, 1992:
N/A
N/A
Single-family @ $150,00 / Lot
Multi-family @ $75.00 / Unit
(50% paid prior to Council approval of final plat)
(50% paid at issuance of building permit)
* Preliminary plat approved after June 23, 1992:
N/A
N/A
Single-family @ $350.00 / Lot
Multi-family @ $350.00 / Unit
(50% paid prior to Council approval of final plat)
(50% paid at issuance of building permit)
* Preliminary plat approved after October 26, 1993:
19
N/A
Single-family @ $1285.00 / Lot
Multi-family @ $1285,00 / Unit
(100% paid prior to Council approval of final plat)
Roadway Impact Fee:
(See attached fee calculations)
Street Lighting Fees:
Assessed for lighting in the City's right-of-way.
This fee cannot be assessed until after T.U. Electric submits
the lighting plan for the proposed development.
Once the plans are submitted, $292.60 per light will be assessed.
(100% due prior to final acceptance of development)
N/A
N/A
N/A
$24,415.00
N/A
$16,245.00
Information not
available at this time
Street Sign Fees:
Assessed for signage in the City's right-of-way.
(See attached fee calculations if applicable)
Information not
available at this time
Construction
Inspection Fees:
A copy of the development contract must be submitted for assessment.
The contracts should indicate the cost to construct the improvements
that are inspected by the Engineering Department.
(2% of development cost required for private improvements)
(4% of development cost required for public improvements)
Need submittal of
development contracts
Page 2
ROADWAY IMPACT FEE CALCULATIONS
PROJECT: Caztlebury Cour~
DATE: 1/11/99
ROADWAY IMPACT FEE:
Service Area * 6
Category ** Residential
Land Use ** Single-Family Detached
Building Size (Sq. Ft.) N/A
Development Units ** 19
Vehicle Miles per Development Unit ** 2.85
Fee per Vehicle Mile *** $300
Roadway Impact Fee due = (Development Units) x
Vehicle Miles per Development Unit) x (Fee per Vehicle Mile) = $16,245.00
* (Figure 2 - Roadway Impact Fee Study)
** (Table 3 - Roadway Impact Fee Study)
*** (Schedule 2, Page 3 - Roadway Impact Fee Study)