Loading...
Castlebury-CS 990111~The City With A Beautiful Future ~ PO BOX 478  COPPELL, TEXAS 75019 P.O. Box 478 Coppell, Texas 75019 972-462-0022 Daniel M. Goodwin, P.E. Goodwin and Marshall, Inc. 6001 Bridge Street, Suite 100 Fort Worth, Texas 76112 January ll, 1999 Castlebury Court Development Fee Assessment Dear Mr. Goodwin: Enclosed is a copy of the City of Coppell Development Fee Assessment table, along with a copy of the Development Fee calculations for the referenced development. Please make payment to the City of Coppell in the amount of $60,010.00 and forward to the Finance Department along with a copy of the Fee Assessment table. This amount is a portion of the assessed fees which need to be paid prior to Council approval. Please refer to attached table for additional fees. Also provide a copy of the Engineer's estimate or contract to our office so the construction inspection fee can be verified. Providing a copy of your paid receipt to the Engineering Department will help us to verify the payment of required fees and insure a successful beginning of this project. We look forward to working with you on this project. If you have any questions, please contact me. Sincerely,__ Michael A. Martin, P.E. Assistant City Engineer CC: Jennifer Armstrong, Finance Director Doug Stevens, Engineering Technician Glenn Hollowell, Assistant Director of Public Works Greg Jones, Chief Building Official Gary Sims, Director of Leisure Services DEVELOPMENT FEE TABLE Project: Castlebury Court Date: 1/11/99 TOTAL AMOUNT DUE FEES DUE PRIOR TO COUNCIL APPROVAL Water Impact Fee $10,800.00 $10,800.00 (100 % due prior to Council Approval) Water Tap Inspection Fee $1,000.00 (100% due at Issuance of Water Meter) Water Meter Fee (Domestic) $471.77 (100% due at Issuance of Water Meter) Water Meter Fee (Irrigation/Fireline) $142.80 (100% due at Issuance of Water Meter) Water Meter Deposit (Domestic) $665.00 (100% due at Issuance of Water Meter) Irrigation/Fireline Meter Deposit $30.00 (100% due at Issuance of Water Meter) Wastewater Impact Fee $8,550.00 $8,550.00 (100% due prior to Council Approval) Wastewater Tap Inspection Fee $950.00 (100% due at Issuance of Building Permit) Utility Final Inspection Fee $950.00 (100% due at Issuance of Building Permit) Park Fee $24,415.00 $24,415.00 (100% due prior to Council Approval) Roadway Impact Fee $16,245.00 $16,245.00 (100% due prior to Council Approval) Street Light Fee Information not (100 % due prior to Acceptance of Project available at this time Street Sign Fee Information not (100% due prior to Acceptance of Project available at this time Construction Inspection Fee Need submittal of development contracts TOTAL $64,219.57 TOTAL AMOUNT DUE PRIOR TO COUNCIL APPROVAL $60,010.00 DEVELOPMENT FEE WORKSHEET PROJECT: Castlebury Court DATE: 1/11/99 Water Impact Fee: Domestic Meter(s): Irrigation Meter(s): Fireline Meter(s): 19 - 5/8 inch X 3/4 inch = 19 1 - 1 1/2 inch = 5 Total #: 24 ESU's @ $450.00 ea. (100% due prior to Council approval of the final plat) Water Tap Inspection Fee: Total #: 20 Connections @ $50.00 ea. (Single family due prior to issuance of building permit) (All other developments due prior to issuance of meter) Domestic Water Meter Fee: Total #: 19 Domestic Meter(s) @ $24.83 (Single family due prior to issuance of building permit) (All other developments due prior to issuance of meter) Irrigation/Fireline Water Meter Fee: Total 0: 1 Irrigation Meter(s) @ Total #: 0 Additional Irrigation Meter(s) @ Total #: 0 Fireline Meter(s) @ (100% due prior to issuance of water meters) $142.80 Domestic Water Meter Deposit Fee: Total#: 19 Meter(s) @ $35.00 ea. (100% due prior to issuance of water meters) Irrigation/Fire Meter Deposit Fee: Total #: 1 Meter(s) @ $30.00 ea. (100% ~ue prior to issuance of water meters) Wastewater Impact Fee: Total Domestic Meters ESU's: 19 @ $450.00 ea. Wastewater Tap Inspection Fee: Total #: 19 Connections @ $50.00 ea. (100% due prior to issuance of building permit) Utility Final Inspection Fee (All developments): Total 0: 19 Lots @ $50.00 ea. (100% due prior to issuance of building permit) ESU's ESU's ESU's ESU's $10,800.00 $1,000.00 $471.77 $142.80 $0.00 $0.00 $665.00 $30.00 $8,550.00 $950.00 $950.00 Page 1 DEVELOPMENT FEE WORKSHEET Park Fee (For Residential Developments Only): * Preliminary plat approved prior to June 23, 1992: N/A N/A Single-family @ $150,00 / Lot Multi-family @ $75.00 / Unit (50% paid prior to Council approval of final plat) (50% paid at issuance of building permit) * Preliminary plat approved after June 23, 1992: N/A N/A Single-family @ $350.00 / Lot Multi-family @ $350.00 / Unit (50% paid prior to Council approval of final plat) (50% paid at issuance of building permit) * Preliminary plat approved after October 26, 1993: 19 N/A Single-family @ $1285.00 / Lot Multi-family @ $1285,00 / Unit (100% paid prior to Council approval of final plat) Roadway Impact Fee: (See attached fee calculations) Street Lighting Fees: Assessed for lighting in the City's right-of-way. This fee cannot be assessed until after T.U. Electric submits the lighting plan for the proposed development. Once the plans are submitted, $292.60 per light will be assessed. (100% due prior to final acceptance of development) N/A N/A N/A $24,415.00 N/A $16,245.00 Information not available at this time Street Sign Fees: Assessed for signage in the City's right-of-way. (See attached fee calculations if applicable) Information not available at this time Construction Inspection Fees: A copy of the development contract must be submitted for assessment. The contracts should indicate the cost to construct the improvements that are inspected by the Engineering Department. (2% of development cost required for private improvements) (4% of development cost required for public improvements) Need submittal of development contracts Page 2 ROADWAY IMPACT FEE CALCULATIONS PROJECT: Caztlebury Cour~ DATE: 1/11/99 ROADWAY IMPACT FEE: Service Area * 6 Category ** Residential Land Use ** Single-Family Detached Building Size (Sq. Ft.) N/A Development Units ** 19 Vehicle Miles per Development Unit ** 2.85 Fee per Vehicle Mile *** $300 Roadway Impact Fee due = (Development Units) x Vehicle Miles per Development Unit) x (Fee per Vehicle Mile) = $16,245.00 * (Figure 2 - Roadway Impact Fee Study) ** (Table 3 - Roadway Impact Fee Study) *** (Schedule 2, Page 3 - Roadway Impact Fee Study)