Loading...
Champions-CS040520May 20, 2004 T H £ C I T Y 0 F COPPELL Henry Samamaria 17390 Preston Rd., Ste 390 Dallas TX 75252 RE: Champions School of Real Estate Final Acceptance Dear Mr. Santamaria: Representatives of the City of Coppell have confirmed a final inspection of paving, drainage and utilities for the referenced project. The two-year maintenance bonds and as-built drawings have been received from the contractor. Maturity on the bonds will be two years from the date of this letter. Office Phone: (972) 304-3684 Fax: (972) 304-3570 Ken Griffin, Director of Engineering & Public Works Rhonda Brothers, Engineering Secretary Glenn Hollowell, Director of Public Works Greg Jones, Chief Building Official Tim Oates, Fire Marshal Carl Byrd, Smith Commercial Contracting Robert Schneeburg, Gonzales & Schneeburg