Champions-CS040520May 20, 2004
T H £ C I T Y 0 F
COPPELL
Henry Samamaria
17390 Preston Rd., Ste 390
Dallas TX 75252
RE: Champions School of Real Estate
Final Acceptance
Dear Mr. Santamaria:
Representatives of the City of Coppell have confirmed a final inspection of paving, drainage and
utilities for the referenced project.
The two-year maintenance bonds and as-built drawings have been received from the contractor.
Maturity on the bonds will be two years from the date of this letter.
Office Phone: (972) 304-3684
Fax: (972) 304-3570
Ken Griffin, Director of Engineering & Public Works
Rhonda Brothers, Engineering Secretary
Glenn Hollowell, Director of Public Works
Greg Jones, Chief Building Official
Tim Oates, Fire Marshal
Carl Byrd, Smith Commercial Contracting
Robert Schneeburg, Gonzales & Schneeburg