ST9302-CN 990902FAX ¢2~4) 3~2-3201 ED BELL CONSTRUCTION COMPANY POST OFFICE BOX 540787 10605 HARRY HINES DALLAS, TEXAS ?5354-0787 DALLAS, TEXAS 75220 September 2, 1999 Mr. Kenneth M. Griffin, P.E. Director of Engineering and Public Works City of Coppell 255 Parkway Blvd. Coppell, Texas 75019-4409 Re: Sandy Lake Road Reconstruction Coppell Project #: ST 93-02 Kimley-Hom Project #: 06940600 DWU Project #: 98-311F Dear Mr. Griffin: Enclosed for your review and incorporation into the contract are two executed copies of change order #2. If you have any questions regarding this change order, don't hesitate to contact our office. ,~Crely' [ Project Engineer xc~ Michael G. DeMotte, Kimley-Hom and Associates, Inc., 801 Cherry Street, Suite 1100 Fort Worth, Texas 76102-6803 AN EQUAL OPPORTUNITY EMPLOYER CITY OF COPPELL CHANGE OR EXTRA WORK ORDER PROJECT: CONTRACTOR OWNER: CHANGE ORDER #: SANDY LAKE ROAD PROJECT # ST 93-02 ED BELL CONSTRUCTION COMPANY CITY OF COPPELL 2 DATE: 8/23/99 ADD: Item # ~2uantity Unit Description Unit Price Total Price 50 LF Extend drain line from property line to sewer 22.50 1,125 2 EA Connect lateral into storm drain 550.00 1,100 2 EA Install cleanout at property line 300.00 600 280 LF 6" Sch 40 PVC electric conduit (bored) 24.00 6,720 1050 LF 6" Sch 40 PVC electric conduit (open cut) 8.00 8,400 360 LF 2" Sch 40 PVC electric conduit (open cut) 3.50 1,260 1 EA Remove / Replace Air release valve at Sta.' 11 +50 1,950.00 1,950 2 EA 16"x8" RCCP wet tapping sleeve & valve 2,680.00 5,360 9 EA 16"x8" DIP tapping sleeve & valve 3,025.00 27,225 1 EA 16"x4" DIP tapping sleeve & valve 3,180.00 3,180 9 EA 16"xl" DIP service connection 1,840.00 16,560 I EA 16"x2" DIP service connection 1,300.00 1,300 2 Tons Ductile iron fittings 2890.00 5,780 1 EA Reconnect sanitary sewer line @ STA 15+77.13 580.00 580 TOTAL Addition $81,140 DELETE: Item # Quantity Unit Description Unit Price Total Price 87 400 LF 16" water main 62.00 (24,800) 96 8 EA 8" gate valve 800.00 (6,400) 97 1 EA 6" gate valve 650.00 (650) 98 1 EA 4" gate valve 520.00 (520) 103 12 EA Connection to existing water main 1,050.00 (12,600) 106 9 EA I" water service 1,000.00 (9,000) 108 1 EA 2" water service 1,500.00 (1,500) 116 400 LF Remove 16" water main 6.00 , (2,400) TOTAL Deletion ($~7,870) TOTAL CHANGE ORDER//2 $23,270.00 Previous Contract Amount Total Change Order//2 Revised Contract Amount Net Increase in Contract Time of Completion Revised Contract Time of Completion $8,456,664.00 $23,270.00 $8,479,934.00 27 Days 891 Days The contractor hereby accepts this contract adjustment as a final and complete adjustment in full accord and satisfaction of all past and future liability originating under any clause in/~f~Ce~n~reason for this. revision to the Contract. ' Acce~by ~/ Date Recomme~ld~! by'City Engineer t I Date Agreed t6 by Con~ctor ' / Date