Loading...
Champions-CS030531DEVELOPMENT FEES IPROJECT NAME: School of Real Estate Champions ENGINEER: Gonzales & Schneeberg ORIGINATION DATE: 5/31/2003 SENT ASSESSMENT ASSESSED FEE AMOUNT PAll: 5/1/2003 Water Impact Fee ,~~,vvv.vw¢'~ onn nn $2,800.00 revised 8/8/03 $3,500.00 Wastewater Impact Fee $1,400,00 $1,400.00 Park Fee n/a Roadway Impact-Zone Street Sign Street Light DATE 7/14/2003 7/14/2003 $7,532.72 $7,532.72 rb 5/15/2003 7/10/2003 Construction Inspection $3,192.18 7/22/2003 Bore Permit $100.00 Overtime Inspection $3,192.18 rb 7/14/2003 $100.00 pc 7/23/2003 Water Tap Inspection $150.00 $150.00 Wastewater Tap Inspection $50.00 $50.00 Water Meter (Domestic) $142.10 $142.10 Water Meter (Fire/Irrig) $1,335.83 $1,335.83 Meter Deposit (Domestic) $30.00 $30.00 Meter Deposit (Fire/Irrig) $60.00 $60.00 Utility Final Inspection $50.00 $50.00 ~Subtotal to Eng. di 8/14/2003 di 8/14/2003 di 8/14/2003 di 8/14/2003 di 8/14/2003 di 8/14/2003 di 8/14/2003 $10,824.90 $10,824.90 $0.00 Total Fees Fees Paid Amount Owed TOTALS $17,542.83 $16,842.83 $700.00 Prior To Construction Erosion Control Approved E.P.A.-N.O.I. Recd. Const. Plan Approved NOTES Date Received Prior To Final Acceptance As Built Plan Recd. Paving Bond Recd. Utilities Bond Recd. Erosion Control Maint.