ST9302-CN 990309 MEMORANDUM FROM THE DEPARTMENT OF ENGINEERING To: From: Date: RE: Jim Witt, City Manager Kenneth M. Griff'm, P.E., Dir. of Engineering/Public Works March 9, 1999 Sandy Lake Road Professional Services Agreement changes Daring the course of the design of Sandy Lake Road there have been some modifications to the Scope of Services. Those are itemized as 1 through 6 on Profession Service Agreement//3: 1. This was a deleting of 1 public meeting. 2. There were additional easements required than what was originally thought. 3. The staking of the property corners were assumed to be "per parcel" but the contract was actually written "per property corner". 4. This was a survey requested to re-verify exiting conditions construction because the original survey had taken place in developments along Sandy Lake had taken place since that time. 5. Thi.g was a request to survey the Ashton Ridge screening wall to insure that it was not in conflict with proposed Sandy Lake Road construction. 6. This was a special public meeting with exhibits concerning TU Electric trnn.~mi~ion lines in 1994. Verbal approval was given but no official paperwork was processed at that time. prior to the start of 1994 and numerous "CITY OF COPPELL ENGINEERING - EXCELLENCE BY DESIGN" Kimley-Horn and Associates, Inc. February 25, 1999 Mr. Ken Griffin, P.E. City of Coppell P. O. Box 478 Coppell, Texas 75019 Sandy Lake Road Reconstruction (ST 93-02) Professional Services Agreement Revision No. 3 KHA No. 06940600 Dear Mr. Griffin: Kimley-Horn and Associates is pleased to present the following revisions to our existing Professional Services Agreement with the City of Coppell. These revisions are necessary to adjust the contract amount in accordance with various additional services that have been provided over the past six years. The total adjustment to the contract amount needed is $13,112. The adjustment is further described as follows: Description Amount 1. Meeting at $2,000 each, omit 1 ($ 2,000) 2. Easement Descriptions $ 3,400 at $600 each, add 5. 3. Stake Property Corners $ 1,180 at 20 each, add 59 4. Survey to adjust current $ 7,190 topography, September, 1998 5. Survey Ashton Ridge $ 342 Screening Wall, October, 1996 6. Special Public Meeting with TU Electric, October, 1994 $ 3,000 NET INCREASE $ 13,112 · Suite 1100 801 Cherry Street Fort Worth, Texas 76102-6803 · TEL 817 335 6511 MET 817 654 4266 FAX 817 335 5070 Kimley-Horn and Associates, Inc. Mr. Ken Cvrifl~n, P.E., Felmuiry 25, 1999, Page 2 All the provisions of our Professional Services Agreement with the City of Coppell, including Revision No.s 1 and 2, the Scope of Services and fee, will remain in effect, along with the changes provided for herein.. A chronology of agreements and revisions is included in Exhibit A. Upon your agreement with the above revisions to scope and fee for this project, please endorse both copies of this letter and return one copy to our office. Certainly call us if you have any questions or require additional information. Respectfully submitted, KIMLEY-HORN AND ASSOCIATES, INC. Lee K. Allison, P.E. LKA:pts Attachment Copy to: P:~061087.00~LTR~n~I~w .doo ,1999. Kimley-Horn and Associates, Inc, EXHIBIT A CHRONOLOGY OF CONTRACT AGREEMENTS Original Agreement Amount Lump Sum Reimbursable Total Concept Design $ Preliminary Design Final Design Bid Construction Water System Sub Total $ 107,050 $ 8,000 $ 115,050 195,640 4,000 199,640 252,913 23,800 276,713 6,500 0 6,500 73,897 700 74,597 10,000 0 10,000 646,000 $ 36,500 $ 682,500 Contract Revision No. 1 - Redesign Concept Design $ 38,000 Preliminary Design 116,750 Drainage channel 23,500 Sub Total $ 178,250 $ 0 0 0 $ o $ 38,000 116,750 23,500 $ 178,250 Contract Revision No. 2 - DWU Redesign Final Design $ 165,000 $ 0 $ 165,000 ~ TOTAL CONTRACT AGREEMENTS TO DATE $ 989,250 $ 36,500 $ 1,025,750 Proposed Revision No. 3 $ 0 $ 13,112 $ 13,112 PROPOSED TOTAL AGREEMENTS $ 989,250 $ 49,612 $ 1,038,862