Channel Pointe-CS 901016 CITY OF COPPELL
255 PARKWAY BL~q).
P, 0. BOX 478
CO Pp ELI,, TEXAS 75019
(218) 462-0022
WE ARE SENDING YOU [ P'] Attached [ ] Under Separate Cover via ~-(~T the following items:
[ ] Mark Up Plans [ ] Plans [ ] Prints
[ ] Copy of Minutes
[ ] Change order
[ :opy of Letter [ ] Specifications
COP [ I",S I)A'I'I'~ NO. I)I".SCI(II'T].ON
TIIESE ARE TRANSMITTED as checked below: I
[ ] As Requested
[ ].Approved as No'ted
[ ] Approved as Submitted
[ ] For Review & Comment [ ] Note & Reply To:
[ ] Returned for Corrections'
[ ~(esubmit ~ Copies for Approval
Note & Forward To:
Submit .Copies for Distribution
Return Corrected Prints [ ] Return Markup Plans with Corrections
. ' " " ,. ~ Y - ~ '
PERMIT NO. 9oI0
STATE OF
TEXAS :
DALLAS :
COPPE],L :
COUNTY OF
CITY OF
NAME OF PERMITTEE:
Tile above name,, permittee applied for a DEVELOPMENT PERMIT on
app]icotlon hos been rev:lewed hy the ADMINISTRATOR and it is his determination ttiat the
proposed development IS located within an identified flood plain of
The ADMINISTRATOR has reviewed plans and specifications of the proposed development for
conformance with the development standards required by COPPELL flood plain management
regulations. You are hereby authorized to proceed with the following described work:
on the following described property:
To maintain compliance with the development standards of COPPELL flood plain management
regulations and to eliminate or minimize flood damage potential to tbs proposed development,
you are hereby directed to construct your proposed development in accordance with the
following special provisions:
( ) For residential structures, the lowest floor (including basement) must be elevated to
two (2) feet above tbs 100-year base flood elevation. Minimum finished floor
elevations must be shown on the plat for the development as approved by the C~ty
Engineer.
( ) For non-residential structures, the lowest floor (including basement) must be elevated
or floodproofed to two (2) feet above the lO0-year base flood elevation. Minimum
finished floor elevations must be shown on the plat or site plan as approved by the
City Engineer.
) Permittee must submit a.certification from a registered professional engineer,
architect, or land surveyor that the finished floor level of the residential structure
has been constructed two (2) feet above the lO0-year base flood elevation.
( )
( )
For non-residential floodproofing, a registered professional engineer or architect must
certify that the floodproofing methods are adequate to withstand the flood depths,
pressures, velocities, impact and uplift forces and other factors associated with the
base flood.
For fill activities, the permittee must submit a certification from an engineer or land
surveyor that the level of the compacted fill material is at or above the elevation of
the Base Flood.
( ) Provide a certified copy of all final plans or As-Built Drawings to the ADMINISTRATOR.
( ) OTHER PROVISIONS:
ACKNOWLEDGEMENT OF CONDITIONS BY PERMITTEE
SIGNATURE OF ADMINISTRATOR
DATE
DATE
DEV.PERMITS
PZAGN