Loading...
Channel Pointe-CS 890829COPPELL PUBLIC WORKS MEMORANDUM August 29,1989 TO: Steve Goram, FROM: Per Birdsall, RE: Director of Public Works Street Superintendent .~ Street Lighting Request (Tickler 8/25/89) As is customary, the street light escrow is paid upon final inspec- tion by which time TU Electric can give an accurate design count of the lighting. The fees have not been paid according to Channel Pointe Records. End Tickler PHB/mt