Loading...
Channel Pointe-CS 880714 COPPELL PUBLIC WORKS MEMORANDUM Steve, ~below_~.~c t~e itc~s we found in our walk that need to bo cozI-ected: 1. All ~nholes and sanitary sewer line need to be flushed and cleaned. 2 8" water ' - · ' · ih-mine gate valve at 4 + 66.28 needs to be located. 3. There were several water and sewer services that we were not able to they are as follows: 1. BL~%~ Lo~~) m~~ south _ r~- 9~-alse -~r box - ' sew~ ~Lot lese~=z fo~ Lhi~c o~t 11 i Lot 12 ~) ~lr]<er 2 ~- '~ BL~K 2 ~t 1 replace -~LoL ~sewer - - Lot 7 ne _~ thi~ on Lot . - L~G~: ama v.,e~er ar~ nn]~ 2 f~m~ ~1;~% ~d ~.~ ~-- ~ Steve, I ~uld say overall that they should ~e s~e each lot has water/wastewahe~ se~ices and they ~e pro.fly ~ked before staff does final walk If you ~ve any ~estions reg~ding t~s ~tter, please advise. [-~5P/bb cc: Steve Goram /-.fY