Chaucer-CS 930128 COPPELL PUBLIC WORKS a 28 DATE: Janu ry , TO: Garreth Campbell, ConstruCtion Inspector FROM: Howard L. Pafford, utilities Su~rintenden~//~. RE: Walk Through of/ChaUcer sewer) Field personnel have conducted a final punch list walk through on the above referenced project and have found all deficiencies be corrected. I would ask that once the wall construction is completed that we are allowed to look at those utilities along Heartz Road. If at that time, deficiencies ar found, the contractor building the wall will be responsible for correcting them. Please ensure that maintenance bonds and as-builts are sent to Public Works prior to acceptance of this project. If you have any questions, please advise. ~LP/dm cc: Steven G. Goram Director of Public Works C~AUCR. HLP