Loading...
Chaucer-CS 920528COPPELL PUBLIC WORKS DATE: TO: FROM: RE: May 28, 1992 Ken Griffin, City E~neer Public Works Staff~'A' Development Fees for Chaucer Estates The following fees should be assessed on the above referenced project. Water Impact Fee: 58 - 5/8" x 3/4" 2 - 1" Domestic Meter/s = 58 ESU's Irrigation Meter/s = 5 ESU's Fireline Meter/s = ESU's Total 63 ESU's ~ $650.00 ea = $40,950.00 100% due prior to Council approval of final plat. Wastewater I~act Fee (MUD): 5--8 - 5/8" x 3/4" Domestic Meter/s = 5-8 ESU's ~ $225.00 = $13,050.00 100% due prior to Council approval of final plat. Water Tap Inspection Fee 60 Connections ~ $100.00 each = $6,000.00 100% due prior to issuance of building permit. Sewer Tap Inspection Fee N/A 58 Connections ~ $100.00 each = $5,800.00 100% due prior to issuance of building permit. Street Lighting Fee Shall be assessed and paid prior to final acceptance of project. Note: This fee cannot be assessed until after TU Electric submits the lighting plan for the proposed project. Once plan is submitted $292.60 per light will be assessed. Street Sig~s Fee See attached Street sign assessment sheet. 100% due prior to final acceptance of project. Park Fee 58 Residential Lots at Units (Multi family) $150.00 each = $8,700.00 at $75.00 each = $ 50% of the amount specified above shall be paid by the Developer; prior to Council approval of final plat. 50% remaining shall be paid by the Builder at such time as a building permit is issued. Please advise the Developer of these fees and due dates. If you have any questions regarding these assessments please advise. cc: Steven G. Goram, Director of Public Works STREET SIGN ASSESSMENT for Chaucer Estates The following assessment is being made in accordance with the City of Coppell Subdivision Ordinance Appendix A chapter VIII A. The following cost of those sign materials required are based on current pricing which is reviewed on a regular basis. SIGN UNIT PRICE QUANTITY EXTENDED PRICE No Parking $ 53.10 Speed Limit $ 63.54 8 $ 508.32 Yield $ 58.56 Stop $ 65.12 Street Name $ 11.60 2 $ 23.20 Stop & Street Combo $ 96.85 4 $ 387.40 OTHER $ TOTAL $ 918.92 * Cost breakdowns may be obtained from Public Works by written request. CHAUCER2.fee