Chaucer-CS 910927COPPELL PUBLIC WORKS
MEMORANDUM
DATE:
September 27, 2991
Shohre Daneshmand, ~ting City Engineer
Public Works Staff ~.~ !I .!~/ 'l'~,t}!~
Development Fees for Chaucer Estates
The following fees should be assessed on the above referenced
project.
Water Impact Fee=
58 - 5/0" x 3/4"
Domestic Meter/s =
Irrigation Meter/s =
Fireline Meter/s =
58
ESU's
ESU's
ESU's
100%
Total 58 ESU's ~ $660.00 ea = $38,280.00
due prior to Council approval of final plat.
Wastewater Impact Fee:
5__8_- 5/8" x 3/4" Domestic Meter/s = 5__8 ESU's ~ $422.00 = $24,47~.00
100% due prior to Council approval of final plat.
* Note: If property to be developed is in the Coppell Municipal
Utility District %1 this fee shall be assessed, but shall not be
collected until such time as an interlocal agreement is made
between the City and MUD.
Water Tap Inspection Fee
58 Connections ~ $100.00 each = $5,800.00.
100% due prior to issuance of building permit.
Sewer Tap Inspection Fee N/A
58 Connections @ $100.00 each = $5,800.00
100% due prior to issuance of building permit.
Street Lighting Fee
Shall be assessed and paid prior to final acceptance of project.
Note: This fee cannot be assessed until after TU Electric submits
the lighting plan for the proposed project. Once plan is
submitted $292.60 per light will be assessed.
Street Signs Fee
See attached Street sign assessment sheet.
100% due prior to final acceptance of project.
Park Fee
58
Residential Lots at $150.00 each = $8,700.00
Units (Multi family) at $75.00 each = $
50% of the amount specified above shall be paid by the Developer;
prior to Council approval of final plat.
50% remaining shall be paid by the Builder at such time as a
building permit is issued.
Please advise the Developer of these fees and due dates.
If you have any questions regarding these assessments please
advise.
HLP/mp
cc: Steven G. Goram, Director of Public Works
STREET SIGN ASSESSMENT
for Chaucer Estates
The following assessment is being made in accordance with the City
of Coppell Subdivision Ordinance Appendix A chapter VIII A. The
following cost of those sign materials required are based on
current pricing which is reviewed on a regular basis.
SIGN UNIT PRICE QUANTITY
EXTENDED PRICE
NO Parking $ 53.10
Speed Limit $ 63.54 13 $ 826.02
Yield $ 58.56
Stop $ 65.12
street Name $ 11.60 4 $ 46.40
Stop & Street Combo $ 96.85 4 $ 387.40
OTHER
$
$
TOTAL $1,259.82
Cost breakdowns may be obtained from Public Works by written
request.
CIIAUCER . FEE