Loading...
Chaucer-CS 910927COPPELL PUBLIC WORKS MEMORANDUM DATE: September 27, 2991 Shohre Daneshmand, ~ting City Engineer Public Works Staff ~.~ !I .!~/ 'l'~,t}!~ Development Fees for Chaucer Estates The following fees should be assessed on the above referenced project. Water Impact Fee= 58 - 5/0" x 3/4" Domestic Meter/s = Irrigation Meter/s = Fireline Meter/s = 58 ESU's ESU's ESU's 100% Total 58 ESU's ~ $660.00 ea = $38,280.00 due prior to Council approval of final plat. Wastewater Impact Fee: 5__8_- 5/8" x 3/4" Domestic Meter/s = 5__8 ESU's ~ $422.00 = $24,47~.00 100% due prior to Council approval of final plat. * Note: If property to be developed is in the Coppell Municipal Utility District %1 this fee shall be assessed, but shall not be collected until such time as an interlocal agreement is made between the City and MUD. Water Tap Inspection Fee 58 Connections ~ $100.00 each = $5,800.00. 100% due prior to issuance of building permit. Sewer Tap Inspection Fee N/A 58 Connections @ $100.00 each = $5,800.00 100% due prior to issuance of building permit. Street Lighting Fee Shall be assessed and paid prior to final acceptance of project. Note: This fee cannot be assessed until after TU Electric submits the lighting plan for the proposed project. Once plan is submitted $292.60 per light will be assessed. Street Signs Fee See attached Street sign assessment sheet. 100% due prior to final acceptance of project. Park Fee 58 Residential Lots at $150.00 each = $8,700.00 Units (Multi family) at $75.00 each = $ 50% of the amount specified above shall be paid by the Developer; prior to Council approval of final plat. 50% remaining shall be paid by the Builder at such time as a building permit is issued. Please advise the Developer of these fees and due dates. If you have any questions regarding these assessments please advise. HLP/mp cc: Steven G. Goram, Director of Public Works STREET SIGN ASSESSMENT for Chaucer Estates The following assessment is being made in accordance with the City of Coppell Subdivision Ordinance Appendix A chapter VIII A. The following cost of those sign materials required are based on current pricing which is reviewed on a regular basis. SIGN UNIT PRICE QUANTITY EXTENDED PRICE NO Parking $ 53.10 Speed Limit $ 63.54 13 $ 826.02 Yield $ 58.56 Stop $ 65.12 street Name $ 11.60 4 $ 46.40 Stop & Street Combo $ 96.85 4 $ 387.40 OTHER $ $ TOTAL $1,259.82 Cost breakdowns may be obtained from Public Works by written request. CIIAUCER . FEE