Loading...
ST9301-PR 941115Sverdrup Civil, Inc. 4311 Oak Lawn Suite 300 Dallas, Texas 75219 November 15, 1994 Mr. Kenneth M. Griffin, P.E. Assistant City Manager/Director of Public Works/City Engineer City of Coppell P. O. Box 478 Coppell, Texas 75019 Dear Mr. Griffin: 214 520-2116 Subject: City of Coppell, Texas Sandy Lake Road Improvements Construction Plans And Specifications Fee Proposal Sverdrup Civil, Inc. is pleased to submit our fee proposal for performing the engineering services necessary to prepare engineering plans, technical specifications, and construction cost estimates for the Sandy Lake Road Improvements. The proposed Scope of Services has been prepared per your meeting with Mr. Daniel Reich, P. E. of Sverdrup Civil, Inc. and Mr. Bill Jessup, P.E. of Dallas County Department of Public Works on October 28, 1994. Sverdrup's proposed Scope of Services is included herein as Appendix "A". Our proposed fee for this project, as defined by the Scope of Services, is $39,774.07. The fees defined on the enclosed manhour, salary, and direct cost tabulation are proposed as a lump sum fee. Our final fee, including profit, will be based on your concurrence with the proposed Scope of Services. Invoices will be presented on a monthly basis. We propose a schedule of approximately 10 weeks to complete the work, with a progress Submittal to the City of Coppell at the 50% complete stage. We look forward to receiving your concurrence with this proposal. We will then forward the contract to you for signature. Should you have any questions regarding this fee proposal, please no not hesitate to Call either myself or Mr. Reich. Sincerely, SVERDRUP CIVIL, INC. JKVB/dtr Enclosure TABLE OF CONTENTS TABLE OF CONTENTS SECTION I · EXAMPLE "Agreement for Professional Services" APPENDIX "A": Proposed Scope of Services APPENDIX "B" · Manhour/Fee Proposal SECTION 1 This Agreement i~ made and entered into thi~ __, 19~r by and between day of , (Owner), Sverdrup shall provide for Owner professional serwices for , hereinafter referred to as .Pro eot'*L Thes~identified a~d described in the scope o= Work (APPENDIX A) a=tached to an= maue a part of this Agreement. A. Owner's Reprs~entative Owner shall designate in writing a person to act as Owner's to be rendered under this Agreemen= P ...... ~- ~ne,~ t and define Owner's policies and ma~e ~ecxsmonm w~. -- r services for the Project. B. _Information 1. Owner shall provide in a timely manner a11_ criteria and fuel information as to owner's requirements for the Project, includ~ design objectives and constraints, space, ng flexibility and expand- abi ¥ . · ire to be included in the draw standards which Owner will ~eq~. ......... ~-u~,s disposal all ings and specif.ic~gi°n~_~9~_~ta~ ~e~~ including previ- · informa~lon peru~,o available ' n or construc er data relative ous reports and any oth ...... = ...... ~ =--rove sverdrup s tion of the Project; an~ promp=~Y submittals. 2. Owner agrees to comply with the ,'Hazard COmmuni- cation Standard" of the Occupational Safety and Health Adminis- =ration. ~. If Owner ~rovides ? b~dget for the project, it shall include contingenczes for bzddlng, changes in the work truction and other cos=s which ar~ the responsibility during cons shall, at the request of sverdrup, provide a of owner. Owner statement of funds available for the pro, eot and their source. 4. Owner shall furnish to Sverdrup as required for performance of sverdrup's services (eXcept to the extent provid- ed otherwise in the Scope of work), data prepared by or services A 3-4/06-89 .... ' ..... ~ ~--itation- soil borings, p.robings of other , .... ~--m--*---aDhlC ~urvevs. laborato~ bo~a~, ease.eh:, r~9nu u-'''io~[~[ ~;.d and o~-r land use , · ro e~v desoriptionm; , su~eysf,P .P -='--=er ~ecial data or consultatLon; all which sverd~p may u~e and rely ~o~lng establish-reference~or tot(s) to proceed W~ ~e ~out of the worK. . . ~er' shall provide su~ accougting, in~naent . emtl~%ing and insurance co~sellng cost ' - ...... ~ -~-al semites a~er may re~re or Syerd~p may reasonably re~es~-~ ~gar~ to legal issues P ......... - --aiti~e~io~ as ~er ~ay raise~ by con=ra?=?r~, ~u~_~'~~S~-~y contractor hag re.ir ........ ~~~~ion contract, anu suc~ Con%r ( .... :-.~ to their fu~ishing ordinance, cooe o~ oroer appiiu---T -- --- . -- ina~itee ~d.r ~on=~act~r~]_~,_ ~-=~al Li~ility Ins~- a4di~ional in~ureu under conuru~u~ ~ ante Policy. C. Ac~$ss and ApDrovals provxsions for Sverdrup to eh:er upon p.um.~.u G,,~.. A.,,..__.,__--.~.~ ty as required for Sverdrup to perform i~:~ services unu=~ ~--~ Agreement. 2. Owner shall furnish at itB cost. approvals and ' from all governmental authorities havzng jurisdiction may be necessary for completion cZ :ne ~ruj~ D. Coordination 1. If Owner designates a person to represent Owner ' e other than Sverdrup, the duties, respon~zbilitie~ at the Blt and the effect ....... = .... - -,,~i=~ of such other person .... thereof on the duties and res~onsio}~l%%=~_¥t,"l''_~_.~ +. and made a part of this Agreemen A 3-4/06-89 2 . If more than one prime contract is to be awarded 2 ....... =--ent and services for the for construc , - -- ---=---~- ~-ior to the start of entire Project, Owner sna~ u=?~9~?~- ~i ..... authorit~ and construCt%on a person or org~n~za=lon c~ ~ ~ . responsibility for coor~inatLng the act=v£t~es among the various prime contractorG. Owner shall give prompt ,,i.z'ltten notice_=o styes or o~herwise become~ ~ware o~ any aeve~opm~-~ owner cbs ---- ....... -rdruo's services, or any that affects the_scope or.:~m~n9 ~ ~-~ o,,i~d~n or a~v Co~trac- defect or nonconZormance ~n the work of tot. 0~ner ~hall compensate Sverdrup for the performance of the services describea in the Scope of Work in accordance with the Terms and Conditions of the attached APPENDIX B. A. Commencement sverdrup shall commence the performance o~ the services for the Project upon the date oi this Agreement and complete the work in accordance with such schedule as may be mutually agreed to by the parties. If SverdrupTM services ~or ~he Project are delayed for reasons beyond its control, 'e~wh~:- in this ~-,6,%~ ~-~' the-time for performance sna~ be subject to equitable adjustment. owner reserves ~he right, without impairing this Agreement, to order changes or alterations in ~e work to be performed Sverdrup If changes o~ alterations ordered affect hereunder by '- ..... the cost or p gr the time for performance or Sverdrup, as the case maY be. A 3-¢/06-89 l B. Concealed Conditions Should concealed or unkn_.o~n conditions be ?n~ou~t~ed_in the performance of the work whxch present the rxs~ or ~lsonarge, dis ersal, release or escape of asbestos, any hazardous sub- . P --- = .... ~ .... w-ste Sverdrup shall promptly suspend its erformance of the Work ior ~ne ~r~u~ .... ii_ ~- - .... _ P- · - --~ --~=-- Owner of ~he conux=xons encou- tered.. Owner an9 Sver~rup shall promptly investigate th~ conditxons and, mf warranted, equitable and.necessarY ad3ust- ments shal% be'made 'in the terms and conditxons of this Agree- ment It is agreed, however, that Sverdrup shall have no duty - other hazardous to determine the ex£stence of asbesto? or any substance or hazardous waste.at the sxt~e~J~[~ or to provide response actxon services even wxnn ~= adjust- ments. S ...... sents that its services shall be performed with ~he skill and care whichwould be.exercx~ed by co,parable qualified design professionals performxng similar ..... ~-~- ~----~sh at ~s own cost and expense, the r ?n sverarup ~na~ ~''"t ' ~ ---.-=---~.. vf the failure to necessarY to correct such ae=~A~n~ ...... _ _ these standards results in damages incurre~ by owner =or re air, or correction of any par~ of the Project, Sverdrup shall ~ .......... =--.etlon costs aGsociate~ with be liable.rd owner xor =ne con~=~ . _ _ such ~epaxr or correction except to the exten~ that such costs constitute an addition of value to the Projeot~ provided, however,.that in no event shall such damage for ~hlch sverdrup may be lxable un, er this paragraph or otherwise xnclude any oonse~aen=ial, sge¢ial, contingent or penal damages. A. ~verdruo's Dut~ Sverdrup shall indemnify Owner against all ~laims and suits b third parties for loss of or damage to proper~y, or persona~ i urv, including death, to persons, and f om reSov~gea therefor, and from all expenses claim or suit, including court costs an~ attorney s.A~ , ari=ing out of the negligent acts, e~rors, or omissxons of ~.~.+ V~ O event shall Sver~rup ~ave sole or contributing negligence. A 3-4/06-89  ~ner's Duty n and after final completion of the ~je~.t, Owner sha!l Upo ....... "ess from a~l claims and a e= arising ~r p *~-, ...... ersons, or co proper~x, ~ sverd~p ~der this Agreemenc- A~X~LE 8 · . ......... =_~4~+~ hereunder, Sverdrup s~all "~. . -- (~- -~ ~- a-reemen~ the fo££owlng xnsur- maintaxn ~urxng ~ne ~ ~ ~,*- ~ certificates of insurance ance and furni~ Owner, in duplicate, as evidence thereo~. Such certifica=e~ shall provide ~hat cancella~xon of sax~ insurance sha%l not be effected wxtho~t. · 30 da s flor written no~lce to_ ?.wner. thirty .( .~ -Y. ~ .... =---~- *~e name the certificate is provided. (1) Workers' Compensation Insurance, providing coverage in compliance with the laws of the state in which any par= of the work is to be performed, and Employer's Liability Coverage in the minimUm amount of $100,000 for each occurrence. · (2) commercial General Liability Insurance written on an occurrence basis with the following limit~ of liabilitY= $4,000,000 General Aggregate Products/Completed Operation5 Aggregate Personal and Aaverti~ing injury Each occurrence Fire Damage Medical Expense $2,000,000 $2~000,000 $2,000,000 $~5,000 $1,000 (3) Automobile Liability I~surance. Bodily injury and p=oper~¥ da~a~_co.~.}~ad sxngle limit - $1 million each occurrence, $~ mxlAxon aggregate. (¢) Architect'~ an~ Engineer's professional Liability Insurance. ~odily.in~ury and property da~.ag~ combined single limit - $1 million each claxm, $5 mxlllon aggregate. A 3--4/05-89 ...% The Commercial General Liability and Architect.'s and Engineer's Professional Liability Insurance shall xnolude Contractual Liability Coverage for the liability assumed by sverdrup in Article 7 herein. A. Termination By Owner 1. In the event sverdrup fails to comply with any provisions of this Agreement, or if the progress or quality of u on Sverdru , and if Sver=rup thereof p ~ its erzor~s of twenty (20) days thereafter to commence correct such failure, Owner may =erminate ~he_~greement_upon to Owner all completed or partially comple:~ and Owner shall pay to sverdrup the amount due for such saris- factory work. Agreement in the event %t shall abandon or ~naez~nz=ely pos:pone the project. Such termln~tion shall be accomplished by written notice to that effect ~elLvered t? Sverdrup. Upon receipt of such notice, Sverdrup shall imm~dlately c~a~e_work_ and_dellv?r_ to owner all completed or part~ally oomple:~u worK. m~ymen= :o verdru shall be made for work performed prior to reoeLpt by ~verdr~ of such termination not~oe, together wxth Sverdrup's costs for closing down its work, and Sverdrup shall have no claim for loss of anticipated profits or any additional compen- sationS''' B. Termination By Sverdrup . In the event Owner fails to comply with any pr.o¥isions of th~s Agreement, or if it fails to timely pay compensation due Owner, and if Owner fails within a thereafter to correct such failure, Sverdrup may termin~te.~hie paid the amount due for such worx, complete~ or partially completed work for the project. A. Use of Documents All documents including Drawings, Specifications, and CADD discs prepared or furnished by Sverdrup pursuant to this Agree- ment are instruments of service with respect to the Project and A 3-4/06-89 S erdrup shall retain an own..ership and property interest therein v er or not the Project is completed. Owner ~ay make and. _ whetS. ........ .. .... ~ ~ enos in =o~ection wl~h uitable for reuse Dy ~er or ou,,=~, -,, ~ . .... s ....... ~ue- .ro~eot. ~y reuse ProO~ ...... ~ ...... -drop for ~s vsr~ ............. r's sole ris~ and w~thout ~iabil~y ...... ~-- -r ada-ration will entitle f~er compensation at rate= to be ~agreeu upo~ B. Opinions of Cost materials, equipment or services Zur~lsneu the Contractor(s)' methods of aetermining prices, or over competitive bidding or market conaitions, Sverdru~'s oD%nions of probable Total Project Costs and. Construction ~o~t provided for stein are to be made on the baszs of Sverdrup s experience and ~.~-~~ and represent Sverdrup's bes~ judgment a? an PstrUCtion industry; but Sver4rup cannot and does not guaran- con ......... ~---~ motel Pro4ect or ConstrUction .... ~ --- ..... ---~ o-inions of probable ConStruction costs, Owner shall employ an estimator as provided in ARTICLE 2. C. P~.rchase Order Terms is A eement in accordance wl:n uwn,& ~ _ . ' by th gr ..... : ..... 4-~-d on such purchase orUer, ~d s~olements or amsndmentm thereto are su~erseue= oX ~,~ ~e;~t, and are not applicable to the wor~. D. C0ntrollin~ La~ This Agreement is to.be governed by t.he law o~ the state where the ,sit9 9f the pr.o~]ec~t~i_s l?cate~-V_.~_.~.. ~ ~ 1. owner and Sverdrup each is hereby bound and the partners, s~¢¢essors, executors, administrators and legal esentat~ve~ of Owner and Sverdrup are hereby bound to the repr ..... = ~_ ~..a~tners, successors, A 3-4/06-89 assigns) of such other party, in respect of all covenants, agreements and obligations of this Agreement. 2. Neither o~ner nor Sver~rup shall assign, sublet transfer any rights under or interest in this Agreement or her exce t to the extent without the w~itten consent of the ct , 'sPmandated b law that an assignment, subletting or transfer l. Y · - Y ..... - ~- ~--~tation may be restricted by law. · a in an written Unless specifically stated to th~ contr r¥ Y _. consent to an ~ssignment, no assignment wzll.r~l~ase or charge the asszgnor from any duty or respons~bxlltY under this Agreement. Nothing contained in this paragraph shall prevent sverdru from employing such independent professional assoc=ates P ro fiats to assist in and consultants as svsrdrup may deem app the performance of services hereunder. ~ ~eh~n= under this Agreement shall be constru~ . ~' . T7--'- ~ .... ~- ~n this A"~eemen= to anyone o~ner 1Ve an rl~s or D~n~lZ~ ~ m-- . , . to g Y ........ = --- ~,,*~es and resoonsib~lztles exclusive benefit of owner and Sver=rup an~ no~ ~uz ~= -~,,~- of any other party. F. Arbitration 1. All claims, counterclaims, disputes and other matters in question between the par=les hereto arising ou~-of o~ in~ the sum of $200,000 will ~e =e¢l~e= ~y a=mA~ . the American Arbitration Association. The _ . have jurisdiction to consider any claim, counterclaim, or or_~er sum of $200,000 or w~ere r. ne aamag~ ~u=~ -~- punitive damages. This Agreement to arbitrate.a~d any other agreement or consent.to arbitrate will be specifically enforce- able under the prevailing law of any court having jurisdiction. 2. Notice of demand for arbitration must be filed in American Arbitra=ion ASSOCiation. within a reasonable time after the olaim, matter in question has arisen. In no event may the demand ~or arbitration be made after the date when institution of legal or equitab%e proceedings based on such claim, dispute or other matter zn question would be barred by the applicable statute of limitations. 3. No arbitration arising out of or related to this Agreement shall include, by joinder, consolidation or other manner, any person not a party to this Agreement except for Sverdrup's Subconsultants who may be joined at Sverdrup's sole election. A 3-4/06-89 8 4. .The limitations oontainea in.paragraphs 1 and 3 may be waived ~n whole or in part by the w~tten consent of both parties. 5. The award rendered by the arbitrators, wi}l be · ' ant ma be entered upon it in any court havlng flnal, ]udgm Y -- act to mo~ifioation or · · · eof and will not be subJ ~urisdzotlon ther , ..... 11 of t~S Federal Arbitration Act (9 U.S.C. Seo=xonm ~v ~,.~ ~,- 6. Unless otherwise agreed in writing, Sv~rdrup the Work and maintaxn its progress durxng any shall carry on and the Owner ,hall continu- to arbitration prooeedings, . . pa.y~.ents to Sverdrup in accoraan~e wxth .th~? 'Artxole 10, Section F shall survive completion thi~ Agreement. IN WITNESS WHEREOF, the parties hereto hav~_?xecuted this Agreement as of the day and year first aoove wrx=~en. OWNER: ~¥: TITLE: BY: TITLE: SVERDRUP CORPORATION A 3-4/06-S~ 9 APPENDIX B ]1I ; [ APPENDIX B S~~P'S ~ ~ p~mVXsxO~S A. For and in consideration ~f the services rendered by Sverdrup, 0wner~P a lump sum fee in the amountof$__~____~--~ , ...4--,~ .h~l~ ~ubmit an invoice for its services at .. ~??~ ~"TiT [___~ ..... sverdruD's estimate of the proportion of total servl~es ~ctua11¥ completed during the -eriod £or which the invoice ~s applzcable, payment of P ...... ='e u-on ~res~ntation and shall be ~ade by wire transfer into an account designated by $ve~drup. If there are disputed items and/or amounts on an~.lnv~ice~ the balance of such invoice, after deducting any U~spu=ed items, s~all be paid in full, and the ~isputed. i~.ems and amounts _ shall be presented to sverdrup for reso£u=Lon as soon as such dis uted items have been determin~d by 9.wrier. p,y~e~s_dy~ the invoice, excludLng any amounts anu l:ems u~mpuu~= mx Owner, shall bear interest at one percent (1%) interest per month (or any lesser legal limit applicable) until paid. The abov. e provisions are predicated on the work. being per- ~ormed ~n Sver.dru..P'S.r_egularl~y_e~lcie:h:dre°nfefc~eC::a~dfmo~y be ~ubJect to revision 1~ separate project purposes. 3-4/06-89 1 ~ !' APPENDIX a ',~ ! 11 ~ I SVERDRUP CIVIL, INC. APPENDIX "A" CITY OF COPPELL, TEXAS Sandy Lake Road Design Construction Plans and Specifications SCOPE OF SERVICES The limits of work for improvements to Sandy Lake Road will be from approximately 355 feet west of Mar, Arthur Boulevard to the City of Coppell city limit at the Trinity River. Sverdrup Corporation is presently providing design services to Dallas County Department of Public Works in connection with Sandy Lake Road Project 91-830 to provide final design and construction documents to improve Sandy Lake Road to a four-lane divided facility. 1. TASK 1 - STREET LIGHTING DESIGN SCOPE OF WORK (a) Prepare lighting calculations to determine spacing requirements of poles along Sandy -- Lake Road. (b) Prepare voltage drop calculations to determine feeder size to supply lighting units. (c) Prepare load calculations to determine the size of service and distribution equipment. -- (d) Prepare plan drawings showing the locations of all lighting units along Sandy Lake Road. (e) Prepare One Line Diagram showing total connected load and distribution equipment '- ~ requirements. (f) Prepare miscellaneous details sheet showing lighting unit mounting details, distribution equipment details, and other required element details. "- (g) Prepare quantities sheet showing total electrical equipment and matedal required for the street lighting system. DESIGN CRITERIA (a) Street lighting design shall be in compliance with the latest edition of the Illuminating Engineering Society Handbook. (b) Street lights will be manufactured by Klm Standards in accordance with City of Coppell Standards, or approved equal. (c) The electrical design will be in compliance with the latest edition of the National Electrical Code, and all applicable local and State codes. I Sverdrup Civil, Inc. City of Coppell APPENDIX "A" ASSUMPTIONS (a) Design calculations will be based on Street lighting units being installed in the median of Sandy Lake Road. DELIVERABLES (a) Drawings: 1. Symbols, General Notes & One Line Diagram 2. Lighting Plan Sheets 1 through 11 3. Miscellaneous Details Sheet 4. Quantity Sheet (b) Construction Specifications - Special Provisions 2. TASK 2 - SANITARY SEWER DESIGN SCOPE OF WORK (a) Prepare Plan & Profile drawings to show design location of proposed 21" diameter sanitary sewer line from MacArthur Boulevard to the Sandy Lake Road Lift Station. (b) Prepare Partial Site Plan drawing at Sandy Lake Road Lift Station to indicate the sewer line interface/connection requirements at the pump station. (c) Prepare miscellaneous detail sheet for sanitary sewer details and required details for utility adjustments/relocations. (d) Prepare quantity summary sheet showing total material and items required for the sanitary sewer. DESIGN CRITERIA (a) Sanitary sewer design shall conform to the requirements of the City of Coppell Subdivision Ordinance, Appendix C -"Design Criteria and Standards", 1994 edition. (b) Engineering requirements shall be in accordance with '~/PCF Manual of Practice No. 9" as published by the American Society of Civil Engineers and the Water Pollution Control Federation. ASSUMPTIONS (a) Any required ground surveys are not included in this fee proposal. We anticipate utilizing existing "As-Built" drawings of the existing sanitary sewers within the right-of-way and of the lift station and corridor from Sandy Lake Road to the lift station. The actual existence of "As-Builts" for the sanitary system has not been determined. DELIVERABLES (a) Drawings 1. Plan & Profiles drawings for sanitary sewer 2. Partial Site Plan @ Sandy Lake Road Lift Station 2 Sverdrup Civil, Inc. City of Coppell APPENDIX "A" 3. Miscellaneous Details sheet 4. Quantity summary (b) Construction Specifications - Special Provisions 3. TASK 3 - SIGNALIZATION DESIGN AT MacARTHUR BLVD. AND SANDY LAKE SCOPE OF WORK (a) Prepare/design signal plan layout and signal phasing diagram (b) Develop signal hardware quantity summary sheet. (c) Provide conduit and cable quantity summary sheet. (d) Prepare Equipment Detail sheet (i.e. Signal Heads, Poles, Foundations, Pull Boxes, Mast Arms) (e) Prepare General Notes and Conditions sheet DESIGN CRITERIA (a) All traffic signalization shall be in compliance with the Texas Manual on Uniform Traffic Control Devices for Streets and Highways, Part IV - Signals. (b) Traffic signal design shall be in accordance with the City of Coppell Subdivision Ordinance. ASSUMPTIONS (a) City of Coppell will coordinate with local utility to provide location of power source. (b) Traffic counts to be provided by the City of Coppell for intersection traffic movements DELIVERABLES (a) Signal Plan Layout sheet & Phasing diagram (b) Signal Hardware Quantity Summary sheet (c) Conduit Cable Quantity summary sheet (d) Equipment Detail Sheets (e) General Notes and Conditions Sheet 4. TASK 4 - DESIGN OF SOUTH ALIGNMENT SHIFT OF SANDY LAKE ROAD at MacARTHUR BOULEVARD SCOPE OF WORK The purpose of this task element is to determine both the design and construction cost impacts of a southward shift of the centerline alignment. This shift is contemplated to attempt to mitigate the impacts to property owners due to right-of-way acquisition along the north side. Sverdrup recommends that some preliminary alignments be developed along with the associated roadway cross sections to evaluate cost trade-offs of an alignment shift. Sverdrup would also analyze roadway functionality due to a shift in alignment. 3 Sverdrup Civil, Inc. City of Coppell APPENDIX "A" The effort associated with this task should be only to develop a reasonable cost estimate of construction costs to provide an alignment shift. Our concern is that encroachment into the existing 80' wide drainage easement may require construction of Iow retaining walls to maintain the required flow area. Also, encroachment into the drainage easement, or placement of any fill material, may require a hydrologic/hydraulic analysis to determine adequacy of the channel configuration. Sverdrup proposes that a brief Summary Report be prepared to address the feasibility and costs associated with an alignment shift rather than propose a design fee to accomplish the alignment shift. Sverdrup proposes the following to provide City of Coppell with the feasibility of an alignment shift: (a) Prepare preliminary alignment drawings using our current CADD database (b) evaluate impacts to the 80" Drainage Easement along south RNV. (c) develop rough "working" drawings of MacArthur Blvd./Sandy Lake Road intersection. (d) determine traffic impacts due to intersection offset & modifications needed to maintain turn lane storage on MacArthur, median island configuration, radius returns, crosswalk changes. (e) evaluate impacts to existing drainage structures along 80' Drainage Easement. DELIVERABLES (a) Preliminary alignment drawings (b) '~/Vorking" Drawings of MacArthur Blvd./Sandy Lake Road intersection depicting revisions required to existing features (median, turn lanes, etc.) (c) Cross-Sections of revised alignment (d) Summary Report addressing impacts including a construction cost estimate and design fee estimate to accomplish the shift. 5. TASK 5 - (OPTIONAL) SCOPE OF WORK (a) Sverdrup Corporation is currently preparing the Sandy Lake Road project for Dallas County Department of Public Works utilizing Intergraph Micro-Station. We will provide the City of Coppell the final plans in AutoCadd electronic format is desired. (Approximately 120 files) PROJECT BUDGET We have prepared a proposed project budget, included as Attachment "B". We propose to provide these services on a lump sum basis, in accordance with the Agreement for Professional Services which is attached hereto. We will submit our invoice to the City of Coppell, to the attention of Kenneth Gdffin, P. E., at monthly intervals. We are happy to 4 Sverdrup Civil, Inc. City of Coppell APPENDIX "A" be of assistence to the City of Coppell. If this agreement is acceptable, acknowledge by signing end returning one copy of this letter for our files. please Very truly yours, SVERDRUP CIVIL, INC. CITY OF COPPELL James K. Van Buren Vice President JKVB/dtr By: Title: Date: c: D.T. Reich, P.E. - Dallas Manager Sverdrup Civil, Inc. City of Coppell Sverdrup Sverdrup Facilities, Inc. A/E OPERATIONS-ST. LOUIS ELECTRICAL SECTION MEMORANDUM DATE: November 10, 1994 TO: Dan Reich Dallas Office FROM: Bill Lewis SUBJECT: County of Dallas, Texas Street Lighting - Sandy Lake Road Final Design - Manhour Estimate Per your telephone request on November 9, 1994 the following is SvF engineering cost for providing construction documents for the above subject. The engineering cost is based on the attached manhour estimate and Scope of Work. Labor Hours Labor Cost Total Cost Electrical (E21) Eng. & Des. Administration (Y21) Typing Direct Cost-Cad 35 Hrs. x27 = Duplicating Mail Telephone 130 24.00 3,120 6 14.00 84 Total Labor Cost 3,204 SRE 42.8% 1,371 Sub-Total 4, 575 G & A 92.5 4,232 Subtotal 8,807 Subtotal Profit (14.6% of Labor) 945 30 20 30 9,832 1,286 CC: R. Kurth F. D'Sa Total 11,118 'T'I' T T I ~F T CLIENT: COUNTY OF DALLAS TEXAS PROJECT: STREET LIGHTING -MAC ARTHUR TO TRINITY RIVER BRIDGE JOB DIVISION: A: FINAL DESIGN D: ~NH~R E$~iMATE~E~RI~ PAGE 1 OF 3 SHEET 1 OF 1 DATE: 11 - 10-94 PROP. NO. 140822 JOB NC). B: E: C: PRI3.1MINARY DESIGN DESIGN REPORTS COST ESTIMATES MISC. TOTAl. PRELIMINARY FINAl_DESIGN SPECS -CONSTRUCTION '" SPECS-EC~JIP PACKAGES DESIGN (BASIC CRITERA) DRAWING (INCL. DWG DES.) COST ESTIMATE SUPPORT "'AS BULTS SHOP DVVG. REV. (EQUIP PKG) TECHNICN.. BID EVAL O&M MN~UN.S MISC CLIENT REVIEW MEETINGS PROJECT MEETINGS F: MANHOURS JOB DIVlSON A B C D E F TOT,N. 0 0 0 0 0 0 0: 0 0 0 0 0 0 O~ 0 0 0 0 0 0 0; 0 0 0 0 0 0i 0 0 0 0 0 O= Oi 0 0 0 TOTN..--FINN. DESIGN 18 0 0' 0 0 0 18 0 0 0 0 0 0 0 9 0 0 0 0 0 9 92.5 0 0 0 0 0 92.5 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 7 0 0 0 0 0 7 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 126.5 0 0 0 0 0 126.5 CONSTRUCTION PERIODIC SITE VISIT SHOP DRAW'lNG- CONSTR PKGS CONSULTATION IN OFFICE CHECK OUT-START UP TOTAL--CONSTRUCTION SECTION SUPERVISION 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 I 41 ol ol ol ol ol 41 TOT,N.--PRB.IM.~FINAL.,CONST I 1301 ol ol ol ol ol 43Ol ,,-- CtUANITIES NO. OF DRAWINGS ,.- CONSTRUC. SPECS EQUIP. PKGS SPECS ,-.. DRAW. SIZE 22X34 141 Ol Ol Ol Ol Ol 141 ol ol ol ol ol ~1 Ol Ol Ol Ol Ol Ol MANHOURS/ORAWlNG DWG. DES PROJECT 6.607143 9.3O6786 ESTIMATED BY: W.WJ..EV~S APPROVED. BY: FINAL DESIGN WORK SHEET CLIENT: CC~NTY OF DALLAS TEXAS PROJECT STREET LIGHTING COSTRUCTION SPECIFICATIONS CONSTRUCTION SPECS - SPECIAL PROV. CONSTRUCTION SPECS - BID PKG 2 CONSTRUCTION SPECS - BID PKG 3 CONSTRUCTION SPECS - BID PKG 4 TOT/M.-CONSTRUCTION SPEClRCATION EQUIPMENT SPECIRCATIONS MOTOR CONTROl. CENTERS "" SWITCHGEAR VARIABLE FREQ. DRIVES TRANSFORMERS UNIT SUBSTATION "" TOTAL-EQUIPMENT SPECIFICATIONS JOB DIVISON '^" FINAL DESIGN NO OF SPEC 1 NO OF SPEC PAGE 2 OF 3 SHEET 1 OF 2 DATE: 11-10-9,4 PROP NO. 140~22 JOB NO. ENG DESIGN CHECK TOTAL 16 2 18 0 0 0 16 0 2 18 0 0 0 0 0 0 0 0 0 DESIGN(BASIC CRITERIA) LIGHTING C,N. CLILATIONS LOAD C,N. CULATIONS VOLTAGE DROP C/~CULATIONS COORDINATION CALCULATIONS FEEDER &BRANCH CIRCUIT CAL.CLILATIONS TOTAL--DESIGN(BASIC CRITERIA) TECHNICAL. BID EVALUATION MOTOR CONTFIOL. CENTERS SWrFCHGEAR VARIABLE FREQ. DRIVES TRANSFORMERS UNIT SUBSTATION TOTAL-TECHNICAL BID EVALUATION 3 I 4 2 0.5 2.5 2 0.5 2.5 0 0 ? 0 2 9 O O O O 0 0 0 0 0 SHOP DRAWING REVIEW-EQUIP. PACKAGES MOTOR CONTROL CENTERS SWrFCHGEAR VARIABLE FREQ. DRIVES TRANSFORMERS ,_. UNIT SUBSTATION TOTAL--SHOP DRA'WING REVlEW'--EClrUIP. 0 0 0 0 0 0 o o o COST ESTIMATE SUPPORT AS BUILTS CLIENT REVIEW MEETINGS PRO,~CT MEETINGS MISC~ I ,aI, NEOUS CORRDINATION WTTH LOC/~ UTILITY FOR SERVICE DROP INCORPORATE REVIEW COMMENTS TOTAL-MISC 2 2 2 2 I 5 0 4 2 I 7' FINAL DESIGN WOl::~: SHEET CLIENT: COUNTY OF DALLAS TEXAS PROJECT STREET LIGHTING CONSTRUCTION DRAWINGS SYMBOLS AND GEN NOTES & ONE LINE LIGHTING PLAN SHEET 1 LIGHTING PLAN SHEET 2 LIGHTING PLAN SHEET 3 LIGHTING PLAN SHEET 4 LIGHTING PLAN SHEET 5 LIGHTING PLAN SHEET 6 LIGHTING PLAN SHEET 7 LIGHTING PLAN SHEET 8 LIGHTING PLAN SHEET 9 LIGHTING PLAN SHEET 10 LIGHTING PLAN SHEET 11 MISC DETAILS QUANITY SPEET TOTAL THIS SHEET ~/TOTAL CONSTRUSTION DRAWINGS JOB DIVlSON 'A' FINAL DESIGN NO OF 1:TWG 1 14 PAGE 3 OF 3 SHEET 2 OF 2 DATE: 11-10-94. PROP NO. 140622 ENG DESIGN CHEC~ TOTAL 8 8 I 17 2 2 0.5 4.5 2 2; 0.5 4.5 2 2! 0.5 4.5 2 2 0.5 4.5 2 2 0.5 4.5 2 2 0.5 4.5 2 2 0.5 4.5 2 2 0.5 4.5 2 2 0.5 4.5 2 2 0.5 4.5 2 2 0.5 4.5 6 6 I 13 6 6 I 13 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Oi 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 42 42 8.5 92.5 I 421 421 e.51 92.51 ATTACHMENT "B" Sverdrup Corporation Dalle8 Office SVERDRUP CIVIL, INC. CITY OF COPPELL, TEXAS r i Sandy Lake Road Design Construction Plans and Specifications Fee Proposal TASK 2 - Sanitary Sewer Design - LABOR SALARY COSTS Personnel I Classification Hours Rate Total Plan & Profile Drawings P2 20 $ 16.93 $ 338.60 I I P3 8 $ 19.14 $ 153.12 Partial Site Plan @ Lift Station P2 24 $ 16.93 $ 406.32 J I P3 10 $ 19.14 $ 191.40 Miscellaneous Details Sheet P2 20 $ 16.93 $ 338.60 J P3 10 $ 19.14 $ 191.40 Quantity Summary P2 16 $ 16.93 $ 270.88 I P3 10 $ 19.14 $ 191.40 QA/QC Drawung and Design P5 15 $ 27.36 $ 410.40 TOTALS 133 $ 2,492.12 Hours TASK 3 - Signalization Design - LABOR SALARY COSTS Personnel I Classification Hours :Rate Total Intersection Signal Plan P5 40 $ 27.36 $ 1,094.40 I TS 16 $ 19.09 $ 305.44 iPhasing Diagram P5 8 $ 27.36 $ 218.88 I T5 4 $ 19.09 $ 76.36 Signal Hardware Quantities P5 16 $ 27.36 $ 437.76 I I T5 4 $ 19.09 $ 76.36 Cable/Conduit Quantities P5 12 $ 27.36 $ 328.32 I I TS 4 $ 19.09 $ 76.36 Equipment Detail Sheets P5 12 $ 27.36 $ 328.32 I T5 16 $ 19.09 $ 305.44 General Notes P5 4 $ 27.36 $ 109.44 I TS 6 $ 19.09 $ 114.54 QA/QC Drawing & Design P5 16 $ 27.36 $ 437.76 T5 20 $ 19.09 $ 381.80 TOTALS 178 $ 4,291.18 Hours Page 1 ATTACHMENT "B" Sverdrup Corporation Dallas Ot lice SVERDRUP CIVIL, INC. CITY OF COPPELL, TEXAS I Sandy Lake Road Design Construction Plans and Specifications Fee Proposal TASK 4 - Study of South Alignment Shift - LABOR SALARY COSTS Personnel I Classification Hours Rate Total Preliminary Alignment Drawing P2 24 $ 16.93 $ 406.32 I I P3 8 $ 19.14 $ 153.12 "Working" Drawings of intersection P2 16 $ 16.93 $ 270.88 I I P3 8 $ 19.14 $ 153.12 Cross sections of alignment P2 16 $ 16.93 $ 270.88 I I P3 8 $ 19.14 $ 153.12 Summary Report/Cost Estimate P2 4 $ 16.93 $ 67.72 P3 8 $ 19.14 $ 153.12 P5 12 $ 27.36 $ 328.32 TOTALS 104 $ 1,956.60 Hours TASK $ - (OPTIONAL) Conversion to AutoCadd from Microstation - LABOR SALARY COSTS Personnel I Classification Hours Rate Total Convert approx. 120files P2 20 $ 16.93 $ 338.60 at 10 Tin/file LABOR TOTALS - TASKS 1 through 5 TASK 1 (SvFac) $ 11,118.00 Total Labor $ 9,078.50 SRE @ 42.95% of Base $ 3,899.22 TASK 2 $ 2,492.12 OVHD @ 113.25 of Base $ 10,344.95 TASK 3 $ 4,291.18 TASK 4 $ 1,956.60 Total Salary $ 23,322.67 TASK 5 $ 338.60 Profit @ 15% $ 3,498.40 TOTAL (TASK 2- 5) $ 9,078.50 TASK 1 $ 11,118.00 I TOTAL LABOR $ 37,939.07 Page 2 ATTACHMENT "B" Sverdrup Corporation Dalla~ O' ~ice SVERDRUP CIVIL, INC. CITY OF COPPELL, TEXAS I Sandy Lake Road Design Construction Plans and Specifications Fee Proposal DIRECT COSTS Hours Rate Total CADD 80 $ 19.50 $ 1,560.00 'Duplicating (Engineering Plans) $ 25.00 Microcomputers (20 hours @ $5.00) $ 100.00 Misc. (Telephone, mileage,Report binding) $ 150.00 Total Direct Costs $ 1,835.00 Total Labor $ 37,939.07 TOTAL ESTIMATED ENGINEERING FEE $ 39,774.07 Page 3