Park West CC(02-2)-LR050928GEOTECHNICAL AND r~ F~ r-'l I I p
ENVI~ON~IENTaL CONSULTANTS
CONCRETE CYLINDER TEST REPORT
Park West Commerce Center
Beltline Road and Airline Road
Coppell, Texas
PO #5126-0103P
REPORTED TO: Cadence McShane Corporation
14860 Montfort Drive, Suite 270
Dallas, Texas 75254
ATTN: Mr. Bobby Paret
CONTRACTOR: Cadence McShane Corporation
Location of Sample
Set Number I Location
1
2
3
4
5
6
7
REPORT NO. 76
REG PROJECT NO. 12468
SAMPLE DATE: 09-21-05
TECHNICIAN: G. Tsougarakis
PAGE: 1 of 2
I Quantity Represented
Paving: 690'N, 30'W from S.W. corner of Building B. 30/650
Pav'ng: 600 N, 25'W from S.W. corner of Building B. 130/650
Paving: 515'N, 30'W from S.W. corner of Building B. 230/650
Paving: 425'N, 50'W from S.W. corner of Building B. 310/650
Paving: 305'N, 25'W from S.W. corner of Building B. 410/650
Paving: 250'N, 20'W from S.W. corner of Building B. 510/650
Paving: 25'N, 40'W from S.W. corner of Building B. 610/650
Design Information
Source of Concrete
Osburn
Mix Identification
Specified Strength p.s.i.
4000
40A55
Test Results
Set Cylinder
No. ID
Age @ Total Load Compressive Average
Date Tested Test lbs. Strength p.s.i. Strength p.s.i.
09-28-05 7 123900 4380
10-19-05 28
10-19-05 28
Hold H
4321
4321
4321
4321
2 4322
4322
09-28-05 7 95690
10-19-05 28
28
3
4
4322 10-19-Q5
4323 10-1§-~ [ 28
4323 Hold ~ h
4324~ 09-~-0~,~") 7
4324 ' 9-
3390 .....
145590 5150
r,,,
126460
2424 STUTZ DR. ,* SUITE 400 · DALLAS, TX 75235 * TEL [214] 350 5600 * FAX [214] 3500019
REPORT NO. 76
REG PROJECT NO. 12468
SAMPLE DATE: 09-2'1-05
PAGE: 2 of 2
Test Results
Set Cylinder Age @
No. ID Date Tested Test
5 4325 09-28-05 7
4325 10-19-05 28
4325 10-19-05 28
4325 Hold H
6 4326 09-28-05 7
4326 10-19-05 28
4326 10-19-05 28
4326 Hold H
7 4327 09-28-05 7
4327 10-19-05 28
4327 10-19-05 28
4327 Hold H
Total Load Compressive Average
lbs. Strength p.s.i.
114740 4060
Strength p.s.i.
139840 4950
108110 3830
.~ylinder Data
Set Cylinder Time of Concrete Air Ticket
No. ID Slump Sample Air Temp. Temp. Entrainment Number
1 4321 5.00 3:20AM 77 84 4.3 N/A
2 4322 5.00 4:25AM 77 83 4.0 N/A
3 4323 5.50 5:25AM 77 82 4.5 N/A
4 4324 4.00 6:30AM 77 86 4.4 N/A
5 4325 6.00 8:00AM 77 83 4.3 N/A
6 4326 5.00 9:10AM 82 87 4.2 N/A
7 4327 6.00 10:30AM 83 90 4.2 N/A
Mail
Distribution: (1) Cadence McShane Corporation/
Mr. Bobby Paret
(1) Commerce Construction Co., LP/
Mr. Rick Wyly
(1) City of Coppell/Mr. Larry Davis
(1) City of Coppell/Mr. Lee Stone
(1) Northwestern Investment Mgmt./
Mr. Ernest Willmore
(1) Stewart Consulting Associates/
Mr. Mike Smith
Submitted by:
REED ENGINEERING GROUP, LTD.
Original Signed By
Arthur Etherly, III
Manager, CMT
AE/cn