Cici's Addition-CS 990721The City With A Beautiful Future
PO BOX 478
COPPELL, TEXAS 75019
PO, Box 478
CoppelL Texas 75019
972-462-0022
July 21, 1999
James Koch, P.E.
Pacheco Koch Consulting Engineers, Inc.
9401 LBJ Freeway, Suite 300
Dallas, TX 75243
CiCi's Addition No. 1
Fee Assessment Letter
Revised
Dear Mr. Koch:
Enclosed is a copy of the REVISED City of Coppell Development Fee Assessment table,
along with a copy of the Development Fee calculations for the referenced development.
The revision to the roadway impact fee assessment is due to this development being a
part of the Freeport North Development.
The City of Coppell received payment in the amount of $23,341.20 on May 27, 1999 to
cover the amount previously assessed. A copy of this letter will be forwarded to the City
Finance Department to aid in processing a refund of $8562.15 to the developer.
If you have any questions regarding this matter, please contact me.
Sincerely,
Michael A. Martin, P.E.
Assistant City Engineer
CC:
Jennifer Armstrong, Finance Director
Doug Stevens, Engineering Technician
Glenn Hollowell, Assistant Director of Public Works
Greg Jones, Chief Building Official
Gary Sims, Director of Leisure Services
Project:
Date:
DEVELOPMENT FEE TABLE
CiCi's Addition No. 1
07/21/1999
REVISED TO ACCOUNT FOR ROADWAY IMPACT FEE CREDIT
TOTAL AMOUNT DUE
FEES DUE PRIOR TO
COUNCIL
APPROVAL
Water Impact Fee $8,325.00 $8,325.00
(100 % due prior to Council Approval)
Water Tap Inspection Fee $200.00
(100 % due at Issuance of Water Meter)
Water Meter Fee (Domestic) $192.05
(100% due at Issuance of Water Meter)
Water Meter Fee (Irrigation/Fireline) $6,626.45
(100% due at Issuance of Water Meter)
Water Meter Deposit (Domestic) $35.00
(100% due at Issuance of Water Meter)
Irrigation/Fireline Meter Deposit $90.00
(100 % due at Issuance of Water Meter)
Wastewater Impact Fee $3,600.00 $3',600.00
(100 % due prior to Council Approval)
Wastewater Tap Inspection Fee $50.00
(100% due at Issuance of Building Permit)
Utility Final Inspection Fee $50.00
(100% due at Issuance of Building Permit)
Park Fee $0.00 $0.00
(100% due prior to Council Approval)
Roadway Impact Fee $2,854.05 $2,854.05
(100% due prior to Council Approval)
Street Light Fee Information not Available
(100% due prior to Acceptance of Project ]]
Street Sign Fee Information not Available
(100% due prior to Acceptance of Project il
Construction Inspection Fee Information not Available
TOTAL $22,022.55
TOTAL AMOUNT DUE PRIOR TO COUNCIL APPROVAL $14,779.05
DEVELOPMENT FEE WORKSHEET
PROJECT: CiCi's Add~on No. 1
DATE: 07/21/1999
REVISED TO ACCOUNT FOR ROADWAY IMPACT FEE CREDIT
Water Impact Fee:
Domestic Meter(s):
Irrigation Meter(s):
Fireline Meter(s):
1 - 2 inch = 8 ESU's
1 - 2 inch = 8 ESU's
0 = 0 ESU's
2 - 8 inch = 2.5 ESU's
Total #: 18.5 ESU's @ $450.00 ea.
(100% due prior to Council approval of the final plat)
Water Tap Inspection Fee:
Total #~ 4 Connections @ $50.00 ea.
(Single family due prior to issuance of building permit)
(All other developments due prior to issuance of meter)
Domestic Water Meter Fee:
Total #: 1 Domestic Meter(s) @ $192.05
(Single family due prior to issuance of building permit)
(Alt other developments due prior to issuance of meter)
Irrigation/Fireline Water Meter Fee:
Total #: 1 Irrigation Meter(s) @ $192.05
Total #: 0 Additional Irrigation Meter(s) @ $0.00
Total #: 2 Fireline Meter(s) @ $3,217.20
(100% due prior to issuance of water meters)
Domestic Water Meter Deposit Fee:
Total #: 1 Meter(s) @ $35.00 ea.
(100% due prior to issuance of water meters)
Irrigation/Fire Meter Deposit Fee:
.......... T. ot~.' ---$ Meter(s) @ $30.00 ea.
(100% due prior to issuance of water meters)
Wastewater Impact Fee:
Total Domestic Meters ESU's:
$450.00 ea.
Wastewater Tap Inspection Fee:
Total #: 1 Connections @ $50.00 ea.
(100% due prior to issuance of building permit)
Utility Final Inspection Fee (All developments):
Total #: 1 Lots @ $50.00 ea.
(100% due prior to issuance of building permit)
$8,325.00
$200.00
$192.05
$192.05
$0.00
$6,434.40
$35.00
$90.00
$3,600.00
$50.00
$50.00
Page 1
DEVELOPMENT FEE WORKSHEET
Park Fee (For Residential Developments Only): * Preliminary plat approved:
0
0
Single-family @ $0.00 per lot
Multi-family @ $0.00 per unit
(50% paid prior to Council approval of final plat)
(50% paid at issuance of building permit)
Roadway Impact Fee:
(See attached fee calculations)
Street Lighting Fees:
Assessed for lighting in the City's right-of-way.
This fee cannot be assessed until after T.U. Electric submits
the lighting plan for the proposed development.
Once the plans are submitted, $292.60 per light will be assessed.
(100% due prior to final acceptance of development)
$0.00
$o.oo
$2,854.05
Information not Available
Street Sign Fees:
Assessed for signage in the City's right-of-way.
(See attached fee calculations if applicable)
Information not Available
Construction Inspection Fees:
A copy of the development contract must be submitted for assessment.
The contracts should indicate the cost to construct the improvements
that are inspected by the Engineering Department.
(2% of development cost required for private improvements)
(4% of development cost required for public improvements)
Information not Available
Page 2
ROADWAY IMPACT FEE CALCULATIONS
PROJECT: CiCi's Addition No. 1
DATE: 07/21/1999
RF. VISED ~ ACCOIIN~ FOR ~PO, RT NORTH AI)DIT!0N CR~n~
ROADWAY IMPACT FEE:
]ervice Area * 4
Category ** Industrial
Land Use ** General Light Industrial
Building Area (sf) 35,900
Development Units ** 35.90
Vehicle Miles per Development Unit ** 1.06
Fee per Vehicle Mile *** $300
Roadway Impact Fee due = (Development Units) x
(Vehicle Miles per Development Unit) x (Fee per Vehicle Mile) = $11,416.20
* (Figure 2 - Roadway Impact Fee Study)
** (Table 3 - Roadway Impact Fee Study)
*** (Schedule 2, Page 3 - Roadway Impact Fee Study)
Percent of Credit Toward Roadway Impact Fees 75 %
Total Credit $8,562.15