Loading...
Cici's Addition-CS 990721The City With A Beautiful Future PO BOX 478 COPPELL, TEXAS 75019 PO, Box 478 CoppelL Texas 75019 972-462-0022 July 21, 1999 James Koch, P.E. Pacheco Koch Consulting Engineers, Inc. 9401 LBJ Freeway, Suite 300 Dallas, TX 75243 CiCi's Addition No. 1 Fee Assessment Letter Revised Dear Mr. Koch: Enclosed is a copy of the REVISED City of Coppell Development Fee Assessment table, along with a copy of the Development Fee calculations for the referenced development. The revision to the roadway impact fee assessment is due to this development being a part of the Freeport North Development. The City of Coppell received payment in the amount of $23,341.20 on May 27, 1999 to cover the amount previously assessed. A copy of this letter will be forwarded to the City Finance Department to aid in processing a refund of $8562.15 to the developer. If you have any questions regarding this matter, please contact me. Sincerely, Michael A. Martin, P.E. Assistant City Engineer CC: Jennifer Armstrong, Finance Director Doug Stevens, Engineering Technician Glenn Hollowell, Assistant Director of Public Works Greg Jones, Chief Building Official Gary Sims, Director of Leisure Services Project: Date: DEVELOPMENT FEE TABLE CiCi's Addition No. 1 07/21/1999 REVISED TO ACCOUNT FOR ROADWAY IMPACT FEE CREDIT TOTAL AMOUNT DUE FEES DUE PRIOR TO COUNCIL APPROVAL Water Impact Fee $8,325.00 $8,325.00 (100 % due prior to Council Approval) Water Tap Inspection Fee $200.00 (100 % due at Issuance of Water Meter) Water Meter Fee (Domestic) $192.05 (100% due at Issuance of Water Meter) Water Meter Fee (Irrigation/Fireline) $6,626.45 (100% due at Issuance of Water Meter) Water Meter Deposit (Domestic) $35.00 (100% due at Issuance of Water Meter) Irrigation/Fireline Meter Deposit $90.00 (100 % due at Issuance of Water Meter) Wastewater Impact Fee $3,600.00 $3',600.00 (100 % due prior to Council Approval) Wastewater Tap Inspection Fee $50.00 (100% due at Issuance of Building Permit) Utility Final Inspection Fee $50.00 (100% due at Issuance of Building Permit) Park Fee $0.00 $0.00 (100% due prior to Council Approval) Roadway Impact Fee $2,854.05 $2,854.05 (100% due prior to Council Approval) Street Light Fee Information not Available (100% due prior to Acceptance of Project ]] Street Sign Fee Information not Available (100% due prior to Acceptance of Project il Construction Inspection Fee Information not Available TOTAL $22,022.55 TOTAL AMOUNT DUE PRIOR TO COUNCIL APPROVAL $14,779.05 DEVELOPMENT FEE WORKSHEET PROJECT: CiCi's Add~on No. 1 DATE: 07/21/1999 REVISED TO ACCOUNT FOR ROADWAY IMPACT FEE CREDIT Water Impact Fee: Domestic Meter(s): Irrigation Meter(s): Fireline Meter(s): 1 - 2 inch = 8 ESU's 1 - 2 inch = 8 ESU's 0 = 0 ESU's 2 - 8 inch = 2.5 ESU's Total #: 18.5 ESU's @ $450.00 ea. (100% due prior to Council approval of the final plat) Water Tap Inspection Fee: Total #~ 4 Connections @ $50.00 ea. (Single family due prior to issuance of building permit) (All other developments due prior to issuance of meter) Domestic Water Meter Fee: Total #: 1 Domestic Meter(s) @ $192.05 (Single family due prior to issuance of building permit) (Alt other developments due prior to issuance of meter) Irrigation/Fireline Water Meter Fee: Total #: 1 Irrigation Meter(s) @ $192.05 Total #: 0 Additional Irrigation Meter(s) @ $0.00 Total #: 2 Fireline Meter(s) @ $3,217.20 (100% due prior to issuance of water meters) Domestic Water Meter Deposit Fee: Total #: 1 Meter(s) @ $35.00 ea. (100% due prior to issuance of water meters) Irrigation/Fire Meter Deposit Fee: .......... T. ot~.' ---$ Meter(s) @ $30.00 ea. (100% due prior to issuance of water meters) Wastewater Impact Fee: Total Domestic Meters ESU's: $450.00 ea. Wastewater Tap Inspection Fee: Total #: 1 Connections @ $50.00 ea. (100% due prior to issuance of building permit) Utility Final Inspection Fee (All developments): Total #: 1 Lots @ $50.00 ea. (100% due prior to issuance of building permit) $8,325.00 $200.00 $192.05 $192.05 $0.00 $6,434.40 $35.00 $90.00 $3,600.00 $50.00 $50.00 Page 1 DEVELOPMENT FEE WORKSHEET Park Fee (For Residential Developments Only): * Preliminary plat approved: 0 0 Single-family @ $0.00 per lot Multi-family @ $0.00 per unit (50% paid prior to Council approval of final plat) (50% paid at issuance of building permit) Roadway Impact Fee: (See attached fee calculations) Street Lighting Fees: Assessed for lighting in the City's right-of-way. This fee cannot be assessed until after T.U. Electric submits the lighting plan for the proposed development. Once the plans are submitted, $292.60 per light will be assessed. (100% due prior to final acceptance of development) $0.00 $o.oo $2,854.05 Information not Available Street Sign Fees: Assessed for signage in the City's right-of-way. (See attached fee calculations if applicable) Information not Available Construction Inspection Fees: A copy of the development contract must be submitted for assessment. The contracts should indicate the cost to construct the improvements that are inspected by the Engineering Department. (2% of development cost required for private improvements) (4% of development cost required for public improvements) Information not Available Page 2 ROADWAY IMPACT FEE CALCULATIONS PROJECT: CiCi's Addition No. 1 DATE: 07/21/1999 RF. VISED ~ ACCOIIN~ FOR ~PO, RT NORTH AI)DIT!0N CR~n~ ROADWAY IMPACT FEE: ]ervice Area * 4 Category ** Industrial Land Use ** General Light Industrial Building Area (sf) 35,900 Development Units ** 35.90 Vehicle Miles per Development Unit ** 1.06 Fee per Vehicle Mile *** $300 Roadway Impact Fee due = (Development Units) x (Vehicle Miles per Development Unit) x (Fee per Vehicle Mile) = $11,416.20 * (Figure 2 - Roadway Impact Fee Study) ** (Table 3 - Roadway Impact Fee Study) *** (Schedule 2, Page 3 - Roadway Impact Fee Study) Percent of Credit Toward Roadway Impact Fees 75 % Total Credit $8,562.15