Loading...
COS Lutheran-CS 990309 COPPELL, TEXAS 75019 P.O. Box 478 Coppell, Texas 75019 972-462-0022 March 9, 1999 James A. Riley, P.E. Brockette, Davis, Drake, Inc. 4144 North Central Expressway, Suite 1100 Dallas, Texas 75204 RE: Christ Our Savior Lutheran Church Fee Assessment Letter Dear Mr. Riley: Enclosed is a copy of the City of Coppell Roadway Impact Fee Assessment table. Please make payment to the City of Coppell in the mount of $2,381.18 and forward to the Finance Department along with a copy of the Fee Assessment table. Also, provide a copy of the Engineer's estimate or contract to our office so the construction inspection fee can be verified. Providing a copy of your paid receipt to the Engineering Department will help us to verify the payment of required fees and insure a successful beginning of this project. We look forward to working with you on this project. If you have any questions, please contact me. Sincerely, Michael A. Martin, P.E. Assistant City Engineer CC: Jennifer Armstrong, Finance Director Doug Stevens, Engineering Technician Glema Hollowell, A~i~ant Director of Public Works Greg Jones, Chief Building Official Gary Sims, Director of Leisure Services ROADWAY IMPACT FEE CALCULATIONS PROJECT: DATE: Christ Our Savior Lutheran Church 3/8/99 ROADWAY IMPACT FEE: gervice Area * 6 Eategory ** Institutional Land Use ** Church/Synagogue Development Units ** 15.264 Vehicle Miles per Development Unit ** 0.52 ?ee per Vehicle Mile *** $300 Roadway Impact Fee due = (Development Units) x (Vehicle Miles per Development Unit) x (Fee per Vehicle Mile) -- $2,381.18 * (Figure 2 - Roadway Impact Fee Study) ** (Table 3 - Roadway Impact Fee Study) *** (Schedule 2, Page 3 - Roadway Impact Fee Study) Amount due is the lesser of the Street Escrow or the Roadway Impact Fee.