Loading...
Latter-day-AG 931214CONSENT AGENDA~ ~ AGENDA REQUEST FORM CITY COUI~'~ l~aCaCl'ilqG I~,~nh~r I~; 100~t fl'EM NUMBER ITEM CAPTION: Consideration and approval of a Final Plat for Latter Day $aints Addition, located along the south side of MacArthur Boulevard, appro~finmtely 700 feet east of Samuel Boulevard, & Associates. $UBMrvi'~,D BY: at the requ~Anderson DATE: EVALUATION OF ITEM: Date of P&Z Meeting: November 18, 1993 Decision of P&Z Commission: Approval (7-0), with the following conditions: 1. all appropriate easements should be shown on face of plat; and 2. construction plans should be provided for the off-site sanitary sewer line and also for the deceleration lane. BUDGET AMT. ,~//~ AMT. +/- BUDGET COMMENTS: FIN~.NCL~L REVIEW aY ~ LEGAL REVIEW BY: AGENDA R~QUF.~T eORM P.~V~D 2/93 REVIEWED BY CM: CASE #: P & Z HEARING DATE: C. C. HEARING DATE: CITY OF COPPELL PLANNING DEPARTMENT STAFF REPORT Latter Day Saints Addition, Final Plot November 18, 1993 December 14, 1993 LOCATION: Along the south side of MacArthur Boulevard, approximately 700 feet east of Samuel Boulevard. SIZE OF AREA: 3.527 acres of land CURRENT SF-9 ZONING: REQUEST: Approval of a final plat APPLICANT: Presiding Bishop of Church of Jesus Christ of Latter Day Saints 50 Paat North Temple St. Salt Lake City, Utah 84150 (801) 2404067 Dowdey Anderson & Assoc. 16250 Dallas Parkway Suite I00 Dallas, TX 75248 (214) 931-0694 HISTORY: A preliminary plat was approved by the City Council on August 10, 1993. TRANSPORTATION: MacArthur Boulevard is designated as a P6D, six-lane divided thoroughfare contained with 110 feet of right-of-way. Item 10 SURROUNDING LAND USE & ZONING: North - Single-family residential; SF-0 South - Single-family residential; SF-9 East - Developing single-family; SF-9 West - Vacant CISD property; SF-9 COMPREHENSIVE PLAN: Shows low-density residential uses as most appropriate here. ANALYSIS: Basically, this plat is in good order. Attention is directed to three comments which came out of our DRC session. First, all appropriate easements should be shown on face of plat; second, construction plans should be provided for the off-site sanitary sewer line and also for the deceleration lane; and third, an off-site 20 foot wide utility easement will be required from the school property to allow for the installation of the off-site sanitary sewer line. Because these issues are in the process of being resolved, staff recommends approval of the final plat provided the drainage, engineering and utility issues pointed out are addressed prior to execution of the final plat. 1) Approve the zoning 2) Deny the zoning 3) Modify zoning ATrACHMENTS: 1) Final Plat ldr, add.