Park West CC(02-2)-LR051010ENVIRONHENTAL CONSULTANTS j CONCRETE CYLINDER Coppell, Texas PO #5126-0103P REPORTED TO: Cadence McShane Corporation 14860 Montfod Drive, Suite 270 Dallas, Texas 75254 ATTN: Mr. Bobby Paret CONTRACTOR: Cadence McShane Corporation Location of Sample REPORT NO. 64 REG PROJECT NO. 12468 SAMPLE DATE: 09-12-05 TECHNICIAN: A. Chairez Set Number Location 1 Junction Box Quantity Represented 8/8 Mix Identification Design Information Source of Concrete I LMC 1551 Test Results Specified Strength p.s.i. 4000 Set Cylinder N~. I ID 4067 4067 4067 4067 Age @ Total Load Date Tested Test lbs. 09-19-05 7 82780 10-10-05 28 105410 10-10-05 28 107170 Hold H Compressive Average Strength p.s.i. Strength p.s.i. 2930 3730 3790 3760 Cylinder Data Set Cylinder Time of Concrete Air Ticket No. I ID Slump Sample Air Temp. Temp. Entrainment Number I 4067 5.0 4:15PM 94 90 4.0 3201031 Mail Distribution: (1) Cadence McShane Corporation/ Submitted by: Mr. Bobby Paret REED ENGINEERING GROUP LTD. Mr. Rick Wyly o' ned By Larry (1) City of Coppell/Mr. Davis Lee Stone (1) City of Coppell/Mr. herly, III Northwestern Investment Mgmt./ (1) Mr. Ernest Willmore ,soc~ate ce (1) Stewart Consulting As' ' Mr. Mike Smith 2424 STUTZ DR. ,* SUITE 400 ,* DALLAS, TX 75235 ,, TEL [214] 350 5600 * FAX [214] 3500019 GEOTECHNICAL AND ~ jc~j r-'l U P ENVIRONMENTAL CONSULTANTS REPORT OF REINFORCING STEEL PLACEMENT OBSERVATION Park West Commerce Center Beltline Road and Airline Road Coppell, Texas PO #5126-0103P REPORTED TO: Cadence McShane Corporation 14880 Montfort Drive, Suite 270 Dallas, Texas 75254 ATTN: Mr. Bobby Paret CONTRACTOR: Cadence McShane Corporation REPORT NO. 72 REPORT DATE: 10-10-05 REG PROJECT NO. 12468 DATE OBSERVED: 09-21-05 TECHNICIAN: G. Tsougarakis PAGE: 1 of 1 [ Items Observed: J Paving: 50 to 750'N and 15 to 55'W from the S.W. corner of Building B. Reference Plans or Notes Used: ] Sheet C5,1 ~There were no deviations noted. The reinforcing steel placed at the above referenced locations was observed with respect to the referenced portions of the contract documents. Mail Distribution: (1) Cadence McShane Corporation/ Mr. Bobby Paret (1) Commerce Construction Co., LP/ Mr. Rick Wyly (1) City of Coppell/Mr. Larry Davis (1) City of Coppell/Mr. Lee Stone (1) Northwestern Investment Mgmt./ Mr. Ernest Willmore (1) Stewart Consulting Associates/ Mr. Mike Smith Submitted by: REED ENGINEERING GROUP, LTD. Original Signed By Ronald F. Reed, P.E. BW/mg 2424 STUTZ DR. · SUITE 400 · DALLAS, TX 75235 ,, T[L [214] 350 $600 · ~^x [214] 350 0019 REPORT OF FIELD DENSITY TESTS Park West Commerce Center Beltline Road and Airline Road Coppell, Texas PO #5126-0103P REPORTED TO: Cadence McShane Corporation 14860 Montfort Drive, Suite 270 Dallas, Texas 75254 ATTN: Mr. Bobby Parer CONTRACTOR: Cadence McShane Corporation REPORT NO. 73 REPORT DATE: 10-10-05 REG PROJECT NO. 12468 TECHNICIAN: P. Becerra PAGE: 1 of ! Proctor ASTM No. Standard 1 2 3 4 Description D-698 Dark gray and Olive brown clay D 698 Dark brown clay w/calcareous nodules and trace of gravel D-698 Dark brown clay (lime-treated) D-698 Dark brown clay w/trace limestone fragments (lime-treated) Optimum Maximum Mo sture, % Density, PCF 25.4 91.5 23.9 94.4 22.9 95.0 23.3 95.4 Test Ne- 159 160 i161 162 163 164 Date Location 09-22-05 BldgBPlumbingTrench:D5-21.2 Bldg B Plumbing Trench: D.5-17.4 Bldg B Plumbing Trench: D.7 16.0 Bldg B Plumbing Trench: D 7-10.0 BIdg B Plumbing Trench: D.5-8,6 Bldg B Plumbing Trench: D.5-3.5 BelowDepth Field Field Final S. G. Density MoistureI Proctor I Compaction (feet) pcf) (%) D Level (%) 1.0 91.0 25.1 3 95.7 1.0 90.6 25.6 3 95.3 1.0 91 8 24.8 3 96.6 1.0 90.9 25.5 3 95.6 1.0 91.7 24.6 3 96.5 1.0 90.8 25.6 3 95.5 Comments: Where tested, materials were in compliance with project specifications. Mail Distribution: (1) Cadence McShane Corporation/ Mr. Bobby Paret (1) Commerce Construction Co., LP/ Mr. Rick Wyly (1) City of Coppell/Mr. Larry Davis (1) City of Coppell/Mr. Lee Stone (1) Northwestern Investment Mgmt./ Mr. Ernest Willmore (1) Stewart Consulting Associates/ Mr. Mike Smith Submitted by: REED ENGINEERING GROUP, LTD. Original Signed By Bill Woolwine Sr. Manager, CMT BW/m9 :424 SILJfZ DR · SUITE 400 · DAllAS fX 7523~ · rb [214] 350 560C · ~^x [214] 350 0019 REPORT OF PIER OBSERVATION Park West Commerce Center Beltline Road and Airline Road Coppell, Texas PO #5126-0103P REPORTED TO: Cadence McShane Corporation 14860 Montfort Drive, Suite 270 Dallas, Texas 75254 ATTN: Mr. Bobby Parer CONTRACTOR: Cadence McShane Corporation REPORT NO. 74 REPORT DATE: 10-10-05 REG PROJECT NO. 12468 TECHNICIAN: A. Chariez PAGE: 1 of 1 Pier Diameter Bell Diameter Depth Before Final Depth Concrete Date Pier No. (inches) (nches) Bell (feet) of Pier (feet) Length (feet) 09-22-05 C 17 18 44 141 14.2 14.2 C-16 18 44 14.1 14.1 14.1 C-14 18 44 15.1 15.2 15.2 C-13 18 44 15.2 15.5 15.5 C-12 18 44 143 14.5 14.5 Cd1 18 44 148 15.0 15.0 C-10 18 44 144 14.4 14.4 C 17 18 44 151 15.3 15.3 D-16 18 44 151 15.1 15.1 D-14 18 44 14 6 14,7 14.7 D-13 18 44 145 14.5 14.5 D-12 18 44 14.4 14.5 14.5 D-11 18 44 14.3 14.3 14.3 D 10 18 44 14.2 14.4 14.4 D-8 18 44 14.2 14.2 14.2 D-7 18 44 14.2 14.4 14.4 D-6 18 44 14.5 14.6 14.6 Mail Distribution: (1) Cadence McShane Corporation/ Mr. Bobby Paret (1) Commerce Construction Co., LP/ Mr. Rick Wyly (1) City of Coppell/Mr. Larry Davis (1) City of Coppell/Mr. Lee Stone (1) Northwestern Investment Mgmt./ Mr. Ernest Willmore (1) Stewart Consulting Associates/ Mr. Mike Smith Submitted by: REED ENGINEERING GROUP, LTD. Original Signed By Ronald F. Reed, P.E BW/mg 2424STUTZ DR · SUITE 400 * DAI!AS, TX 75235 · ~n [214} 350 5600 · ~^× [214] 3500019