Denton Tap 1A-LR051012ECS - Texas~ LLP
4950 Keller Springs Road,Suite 480
Addison, TX 75001
(972) 392-3222
(FAX) 392-0102
LETTER OF TRANSMITTAL
October 12, 2005
Little Diversified Arch. Consulting
5001 Spring Valley Road, Suite 282-W
Providence Towers
Dallas, TX 75244
ATTN: Ms. Kathryn E. Rabuse
RE: Wachovia - Coppell
ECS ,lob # 19:4236-A
Permits: -.~
Location: 13'1N. Denton Tapp Road
~C°ppelI' TX
We ~e enclosing: X Materials Engineering Division Reports
X For your use
X As reqoested
CC: Centex Construction Co. - Claud Bolton
Centex Construction Co. - Robert Boe
Wachovia Corporate Real Estate - Ken Clansen
Little Diversified Arch. Consultants - Philip F. Ritchie
CityofCoppell- Lee Stone
City ofCoppell - Larry Davis
ENCL:
Field Report # 5
10/12/2~05
?'it...,/ .
Daniel Franklin, P.E.
President/Principal Engineer
J~.,~Off Allen, SET
,C3~struction Services Manager
ECS - Texas, LLP
4950 Keller Springs Road, Suite 480
Addison, TX 75001
(972) 392-3222
(FAX) 392-0102
Project Wachovia - Coppell
Location Coppell, TX
Crient Little Diversified Arch. Consulting - Kathryn E. Rabuse
Contractor Centex Construction Co. - Claud Bolton
Remarks
Trip Charges* Tolls/Parking*
Chargeable Items Nuclear Gauge Rental
Mileage* 40
FIELD REPORT
Project No 19:4236-A
Report No. 5
Day & Date Wednesday 10/12/2005
Weather 65°/Clear
On Site Time 1.00
Lab Time 0.25
Travel Time* 1.00
Total 2.25
Re Obs. T~me 0.00
Time of Arrival Departure
07:00A 08:00A
* Travel timc and mileage will b~ billcd in accordance with the contract.
Summary of Services Performed (field test data, Iocaf~ons, elevations & depths are estimates) & Individuals Contacted. I
Soil Compaction Tests:
The undersigned arrived on site, as requested, to observe the placement and compaction of soils
for building pad re-work and paving subgrade. Please refer to the attached compaction report.
Utilizing the Nuclear Method (ASTM D-2922) to verify the compaction of soils; test results
indicated that the compacted material, at the areas and depths tested~ met or exceeded the
projcct requirements of 95% for paving and 92% for building pad rework of the maximum dry
density as obtained in our laboratory using the Standard Proctor Method (ASTM D-698).
The soils observed on this date appeared to be placed in compliance with pro. ject drawings and
specitications with regard to ]itt thickness and moisture content.
By Marvin Hanks, -- Field Technician