Loading...
Denton Tap 1A-LR051012ECS - Texas~ LLP 4950 Keller Springs Road,Suite 480 Addison, TX 75001 (972) 392-3222 (FAX) 392-0102 LETTER OF TRANSMITTAL October 12, 2005 Little Diversified Arch. Consulting 5001 Spring Valley Road, Suite 282-W Providence Towers Dallas, TX 75244 ATTN: Ms. Kathryn E. Rabuse RE: Wachovia - Coppell ECS ,lob # 19:4236-A Permits: -.~ Location: 13'1N. Denton Tapp Road ~C°ppelI' TX We ~e enclosing: X Materials Engineering Division Reports X For your use X As reqoested CC: Centex Construction Co. - Claud Bolton Centex Construction Co. - Robert Boe Wachovia Corporate Real Estate - Ken Clansen Little Diversified Arch. Consultants - Philip F. Ritchie CityofCoppell- Lee Stone City ofCoppell - Larry Davis ENCL: Field Report # 5 10/12/2~05 ?'it...,/ . Daniel Franklin, P.E. President/Principal Engineer J~.,~Off Allen, SET ,C3~struction Services Manager ECS - Texas, LLP 4950 Keller Springs Road, Suite 480 Addison, TX 75001 (972) 392-3222 (FAX) 392-0102 Project Wachovia - Coppell Location Coppell, TX Crient Little Diversified Arch. Consulting - Kathryn E. Rabuse Contractor Centex Construction Co. - Claud Bolton Remarks Trip Charges* Tolls/Parking* Chargeable Items Nuclear Gauge Rental Mileage* 40 FIELD REPORT Project No 19:4236-A Report No. 5 Day & Date Wednesday 10/12/2005 Weather 65°/Clear On Site Time 1.00 Lab Time 0.25 Travel Time* 1.00 Total 2.25 Re Obs. T~me 0.00 Time of Arrival Departure 07:00A 08:00A * Travel timc and mileage will b~ billcd in accordance with the contract. Summary of Services Performed (field test data, Iocaf~ons, elevations & depths are estimates) & Individuals Contacted. I Soil Compaction Tests: The undersigned arrived on site, as requested, to observe the placement and compaction of soils for building pad re-work and paving subgrade. Please refer to the attached compaction report. Utilizing the Nuclear Method (ASTM D-2922) to verify the compaction of soils; test results indicated that the compacted material, at the areas and depths tested~ met or exceeded the projcct requirements of 95% for paving and 92% for building pad rework of the maximum dry density as obtained in our laboratory using the Standard Proctor Method (ASTM D-698). The soils observed on this date appeared to be placed in compliance with pro. ject drawings and specitications with regard to ]itt thickness and moisture content. By Marvin Hanks, -- Field Technician 1700 70592 0 ~ z 0 0 7 C