Loading...
Denton Tap 1A-LR051010ECS - Texas~ LLP 4950 Keller Springs Road, Suite 480 Addison, TX 75001 (972)392-3222 (FAX) 392-0102 LETTER OF TRANSMITTAL October 10. 2005 I oiltle Diversified Arch. Consttlting 5001 Spring Valley Road, Suile 282-W Providence Towers Dallas, FX 75244 ATTN: Ms. Kathryn E. Rabuse RE: Wachovia - Coppell ECS Job # 19:4236-A Permits: Location: 131 N. Denton Tapp Road Coppell, TX We are enclosing: X Materials Engineering Division Reports For your use X As requested CC: Centex Construction Co. - Claud Bolton Centex Construction Co. - Robert Boe Wachovia Corporate Real Estate - Ken Clausen Little Diversified Arch. Consultants - Philip F. Ritchie City ofCoppell - Lee Stone Ci~ ofCoppell - Larry Davis ENCL: Field Report # 4 10/10/2005 Daniel Franklin, P.E. President/Principal Engineer jas6n Allen, SET Construction Services Manager ECS - Texas~ LLP 4950 Keller Springs Road, Suite 480 Addison, TX 75001 (972) 392-3222 {FAX) 392-0102 / Project [ Wachovia - Coppell Location Coppell, TX Client Little Diversified Arch. Consulting - Kathryn E. Rabuse Contractor Centex Construction Cn.- Claud Bolton Trip Charges* L Tolls/Parking* Chargeableltems ~arGa~geRental I FIELD REPORT Project No 19:4236-A Report No. 4 Day & Date Monday 10/10/2005 Weather 63°/Cloudy On-Site Time 1.25 Lab Time 0.25 Travel Time* 1.00 Total 2.50 ReObs~qme 0.00 Mileage* ~ 40 T~meof Arrival Departure 08:00A 09:15A * Travel time mid milcage will be billed ii1 accordance ;~itll the contract Summary of Services Performed (field test data, Iocalions, elevations & depths are estimates) & Individuals Contacted. Soil Compaction Tests: The undersigned arrived on site, as requested, to observe the placement and compaction of soils for building pad, SW comer. Please refer to the attached compaction report. Utilizing the Nuclear Method (ASTM D-2922) to verify' the compaction of soils; test results indicated that the compacted material, at the areas and depths tested, met or exceeded the project requirements of 92% of the maximum dry density as obtained in our laboratory using the Standard Proctor Method (ASTM D-698). The soils observed on this date appeared to be placed in compliance with prqject drawings and specifications with regard to lift thickness and moisture content. By Marvin Hanks, -- Field Technician 1700 c c