Sandy Lk Addn L3-CS051011COPPELL October 11, 2005 Ms. Louise Halprin Structures & Interiors 1594 Hart Street Southlake TX 76092 Sandy Lake Addition, Lot 3 Block A (McAnelly) Final Acceptance Pending Dear Ms. Halprin: The City of Coppell Engineering Department inspected the improvements in the above referenced project during construction. The issuance of a Final Acceptance letter that starts the two-year maintenance bond period is still pending on the project. The letter will be issued when the following two requirements are met: 1. A sealed set of record drawings from the Engineer of Record, Keith Hamilton, including all as- built conditions provided from mark-ups. 2. Two-year maintenance bond(s) covering the installation of utilities (water and sewer) and paving in the public right-of-way. The bond(s) should be in the amount of 50% of the contract amount for the duration of two years, inception from the date of the Final Acceptance letter. Please make arrangements to provide these required items to the Engineering Dept. so that the project can be successfully concluded. Thank you for your cooperation during this construction, and if I can be of further service, please contact me. Sincerely, Keith R. Marvin, P.E. Assistant City Engineer Office Phone: (972) 304-7044 Fax: (972) 304-3570 CC~ Ken Griffin, P.E., Director of Engineering & Public Works Garreth Campbell, Construction Inspector Keith Hamilton, P.E., Hamilton Consulting George McAnelly, M.D. 255 PARKWAY ~r p,o.8ox 9478 ~l- COPpELL TX 75OI9 1~ TEL 972/462 0022 W PAX 972/304 3673