Loading...
Latter-day-CS 951220COPI'F~LL DATE: TO: FROM: RE: December 20, 1995 Larry Davis, Construction Inspector Howard Pafford, Utilities Superintendent Follow-up Walk thru for Church of Latter Day Saints (615 N. Macarthur) A follow-up waik-thru on the above referenced project was conducted on 12/20/95 and the items listed below have not been corrected. Pump out fire vault and clean out bottom. Clean out ail 4 meter boxes below bypass pipe. Paint V on curb by each valve. Ail three double checks need to be tested and results sent to Water Utilities Dept. If you have any questions, please advise. HLP/dg COPPELL ENGINEERING UTILITh~S DIVISION MEMORANDUM DATE: TO: FROM: RE: December 20, 1995 Larry Davis, Construction Inspector Howard Pafford, Utilities Superintendent Follow-up Walk thru for Church of Latter Day Saints (615 N. Macarthur) A follow-up walk-thru on the above referenced project was conducted on 12/20/95 and the items listed below have not been corrected. ~/ Pump out fire vault,and clean out bottom. /:)Z[Se - ~ C!etm ou[nd4-4--mete~-bo×es below bypass p'.'pe. ~__.P-aint V oa-eurl~ag_ea:l~_alve. /xv' All three double, checks need_ to be tested and results sent to Water Utilities D_D_~ept. If you have any questions, please advise. _ .. _ ~ ~ x,i~/'-, s HLP/dg