Latter-day-CS 940216February 16, 1994
PO, Box 478
~-"~-~*~l~;;~ ~ ~-~'VTr'~ [-'~, oppell, Texas 75019
PUBLIC W }
Mr. Michael Dowdey
Dowdey, Anderson and Associates, Inc.
16250 Dallas Parkway
Dallas, TX 75248
RE: Church of the Latter Day Saints
Development Fee Assessment
Dear Mr. Dowdey:
Enclosed is a copy of the City of Coppell development fee assessment list, along with a copy of the
development fee calculations for Church of the Latter Day Saints.
Please provide a check made payable to the City of Coppell in the amount of $13,825.00 and
forward it to Mr. Alan Johnson, Acting Finance Director, along with a copy of the fee assessment
list. Please provide our office a copy of the engineer's estimate or contract for this project so the
construction inspection fee can be verified.
By providing a copy of your paid receipt to our office, it will help us to verify payment of the
required fees and insure a successful beginning of this project.
We look forward to working with you on this project. If you have any questions, please do not
hesitate to contact me.
Sincerely,
Kenneth M. Griffin, P.E.
City Engineer
Steve Goram, Director of Public Works
Alan Johnson, Acting Finance Director
Greg Jones, Building Official
Doug Stevens, Engineering Technician
CITY OF COPPELL
DEVELOPMENT FEES
Date:
Project:
February 16, 1994
Church of the Latter Day Saints
TOTAL AMOUNT DUE
ASSESSMENT PRIOR TO
COUNCIL
APPROVAL
Water Impact Fee $12,025.00 $12,025.00
(100% due prior to Council Approval)
Water Tap Inspection Fee $300.00 -0-
(100%due at Issuance of Building Permit)
Wastewater Impact Fee (MUD) $1,800.00 $1,800.00
(100% due prior to Council Approval)
Sewer Tap Inspection Fee -0- -0-
(100%due at Issuance of Building Permit)
Utility Final Inspection Fee $50.00 -0-
(100%due at Issuance of Building Permit)
Water Meter Fee (Lots) $189.10 -0-
(100% due at Issuance of Building Permit)
Water Meter Fee (Irrigation & Fire) $2,680.98 -0-
(100% due at Issuance of Water Meters)
Water Meter Deposit $70.00 -O-
(100%due at Issuance of Building Permi0
Irrigation Meter Deposit $35.00 -0-
(100%due at Issuance of Water Meters)
Street Sign Fee -0- -0-
(100%due prior to Acceptance of Project)
Street Light Fee * -0-
(100%due prior to Acceptance of Project)
Park Fee -0- -0-
(100% due prior to Council Approval)
TOTAL $17,150.08
TOTAL AMOUNT DUE PRIOR TO $13,825.00
COUNCIL APPROVAL
Construction Inspection Fee
(2% of Project Cost due prior to
preconstruction meeting)
This fee cannot be assessed until after TU Electric submits the lighting plan for the proposed project.
Once the plan is submitted, $292.60 per light will be assessed.
COPPELL PUBLIC WORKS
MEMORANDUM
DATE:
TO:
FROM:
RE:
February 14, 1994
Engineering Department
Public Works Staff
Development Fees for Church
The following fees
referenced project.
Water Impact Fee:
1 - 2"
1 - 8"
Total 18.5
100% due prior to Council
of The Latter Day Saints
should be assessed and collected on the
Domestic Meter/s = 8 ESU's
Irrigation Meter/s = 8 ESU's
Fireline Meter/s = 2.5 ESU's
ESU's @ $650.00 ea = $12,025.00
approval of the final plat.
above
Wastewater Impact (MUD)
1 - 2" Domestic Meter/s =
Total 8 ESU's @ $225.00 ea =
100% due prior to Council
8 ESU's
$1,800.00
approval of final plat.
Wastewater Impact (City)
N/A - Domestic Meter/s =
Total ESU's @ $450.00 ea =
ESU's
100% due prior to Council approval of the final plat.
Water Tap Inspection Fee
3 Connections @ $100.00 each = $300.00
100% due prior to issuance of building permit for residential. (Or in
the case of multi-family, commercial, retail, industrial, fee is due
prior to issuance of meter).
Development Fees
Page 2
Sewer Tap Inspection Fee
N/A Connections @ $100.00 each = $
100% due prior to issuance of building permit.
(Residential only)
Utility Final Inspection Fee (Ail Development)
1 lots @ $50.00/lot = $50.00
100% due prior to issuance of building permit.
Water Meter Fee (Domestic)
1 - 2" Domestic Meters @ $189.10 ea = $ 189.10
100% due prior to issuance of building permit for residential only.
Ail other development fees are due prior to issuance of meter/s.
Water Meter Fee
1 - 2"
1 - 8"
(Irrigation/Fireline)
Irrigation Meter/s
Fireline Meter/s @
$288.88 ea
2,402.10 ea
Total
100% due prior to issuance of water meter/s.
= $288.88
= $ 2.402.10
= 2,680.98
Water Meter Deposit (Residential)
N/A Meters @ $30.00 ea = $
100% due prior to issuance of building permit.
Water Meter Deposit (Multi-Family or Non-Residential)
2 Meters @ $35.00 ea = $ 70.00
100% due prior to issuance of water meters.
Irrigation MeterDeposit
1 Meter @ $35.00 ea = $ 35.00
100% due prior to issuance of water meters.