Loading...
Latter-day-CS 940214DATE TO: FROM RE: COPPELL PUBLIC WORKS MEMORANDUM February 14, 1994 Engineering Department Public Works Staff Development Fees for Church of The Latter Day Saints The following fees referenced project. Water Impact Fee: 1 - 2" 1 - 2" 1 - 8" Total 18.5 should be assessed and collected on the above Domestic Meter/s = 8 ESU's Irrigation Meter/s = 8 ESU's Fireline Meter/s = 2.5 ESU's 100% due prior to Council approval ESU's @ $650.00 ea = $12,025.00 of the final plat. Wastewater Impact 1 - 2" Total 8 (MUD) Domestic Meter/s = ESU's ~ $225.00 ea = 100% 8 ESU's $1,800.00 due prior to Council approval of final plat. Wastewater Impact (City) N/A - Domestic Meter/s = Total ESU's @ $450.00 ea = ESU's 100% due prior to Council approval of the final plat. Water Tap Inspection Fee 3 Connections @ $100.00 each = $300.00 100% due prior to issuance of building permit for residential. (Or in the case of multi-family, commercial, retail, industrial, fee is due prior to issuance of meter). Development Fees Page 2 Sewer Tap Inspection Fee N/A Connections @ $100.00 each = $ lOO% due prior to issuance of building permit. (Residential only) Utility Final Inspection Fee (Ail Development) 1 lots @ $50.00/10t = $50.00 100% due prior to issuance of building permit. Water Meter Fee (Domestic) 1 - 2" Domestic Meters @ $189.10 ea = $ 189.10 100% due prior to issuance of building permit for residential only. Ail other development fees are due prior to issuance of meter/s. Water Meter Fee 1 2" (Irrigation/Fireline) Irrigation Meter/s @ Fireline Meter/s @ $ $288.88 ea 2,402.10 ea Total 100% due prior to issuance of water meter/s. = $288.88 = $ 2.402.10 = 2,680.98 Water Meter Deposit (Residential) N/A Meters @ $30.00 ea = $ 100% due prior to issuance of building permit. Water Meter Deposit (Multi-Family or Non-Residential) 2 Meters @ $35.00 ea = $ 70.00 100% due prior to issuance of water meters. Irrigation Meter Deposit 1 Meter @ $35.00 ea = $ 35.00 100% due prior to issuance of water meters.