Loading...
Latter-day-WO 951220 DATE: OM: A walk-thru on the above referenced project was conducted on and the items below were found to be deficient. COPI~LL ENGINEERING UTn~ITIES DIVISION Please ensure that these items get t~cen care of and if you have any questions, please give me a call. HLP/dg COPI~II~ I~GINEER~G MEMORANDUM DATE: TO: FROM: RE: De~ember 8, 1994 I~ Davis, Construction Inspector Howard Pafford, Utilities Superintendent Wai~flu'u for Church of~_atter Day Sain..,_t~ A waik-thm was conducted on 12/8/95 on the above referenced project. Below are listing of deficiencies found at that time. 1) Pump out fire vault and clean Out bottom. X 2) "~ 3) ~ 4) /c 5) 8) 9) Please ensure that these deficiencies get taken care of. give me a call. Clean out ail four (4) meter boxes and clean out din. Locate fire hydrant vaive. Paint sewer clean out lids, red and stencil a red clean out on adjacent curb. Paint fire vault vaive, fire hydrant vaive red and fire hydrant valve on curb adjacent to vaive and V on curb adjacent to vault on curb. Paint main line vaive blue with a V on curb. Al1 three double checks have to be inspected by a licensed backflow tester. Stencil a blue W on curb adjacent to meter boxes. Clean dirt and brick out of sewer clean out boxes and grout inside around pipe. If you have any questions, please HLP/dg