A walk-thru on the above referenced project was conducted on
and the items below were found to be deficient.
COPI~LL ENGINEERING
UTn~ITIES DIVISION
Please ensure that these items get t~cen care of and if you have any questions, please
give me a call.
HLP/dg
COPI~II~ I~GINEER~G
MEMORANDUM
DATE:
TO:
FROM:
RE:
De~ember 8, 1994
I~ Davis, Construction Inspector
Howard Pafford, Utilities Superintendent
Wai~flu'u for Church of~_atter Day Sain..,_t~
A waik-thm was conducted on 12/8/95 on the above referenced project. Below are
listing of deficiencies found at that time.
1) Pump out fire vault and clean Out bottom.
X 2)
"~ 3)
~ 4)
/c 5)
8)
9)
Please ensure that these deficiencies get taken care of.
give me a call.
Clean out ail four (4) meter boxes and clean out din.
Locate fire hydrant vaive.
Paint sewer clean out lids, red and stencil a red clean out on adjacent curb.
Paint fire vault vaive, fire hydrant vaive red and fire hydrant valve on curb adjacent
to vaive and V on curb adjacent to vault on curb.
Paint main line vaive blue with a V on curb.
Al1 three double checks have to be inspected by a licensed backflow tester.
Stencil a blue W on curb adjacent to meter boxes.
Clean dirt and brick out of sewer clean out boxes and grout inside around pipe.