Apostles-CS 970611The City With A Beautiful Future
P.O. Box 478
Coppell, Texas 75019
214-462-0022
June 11, 1997
Jack Furlong, P.E.
Albert Halff & Associates
4000 Fossil Creek Blvd.
Fort Worth, Texas 76137
Corporation of the Episcopal Diocese of Dallas Addition, Lot 1, Block A
Development Fee Assessment
Dear Mr Furlong:
Enclosed is a copy of the City of Coppell Development Fee Assessment table, along with a copy
of the Development Fee calculations for the referenced development.
Please make payment to the City of Coppell in the amount of $8,310.00 and forward to the
Finance Department along with a copy of the Fee Assessment table. This amount is a portion
of the assessed fees which need to be paid prior to Council approval. Please refer to attached
table for additional fees. Also provide a copy of the Engineer's estimate or contract to our offic
so the construction inspection fee can be verified.
Providing a copy of your paid receipt to the Engineering Department will help us to verify the
payment of required fees and insure a successful beginning of this project. We look forward
to working with you on this project. If you have any questions, please contact me.
SincerelY,Atul I~Pate 1 ,~E~
Graduate Engineer
CC:
Jennifer Armstrong, Finance Director
Doug Stevens, Engineering Technician
Matt Catit, Supt. of Public Services
Greg Jones, Chief Building Official
Gary Sims, Dir. Leisure Services
2VELOPMENT FEE TABLE
Project: Corporation of the Episcopal Diocese of Dallas Addition, Lot 1, Black A
Date: 6/11/97
TOTAL AMOUNT DUE
FEES DUE PRIOR TO
COUNCIL
APPROVAL
Water Impact Fee $4,500.00 $4,500.00
(100% due prior to Council Approval)
Water Tap Inspection Fee $150.00
(100% due at Issuance of Water Meter)
Water Meter Fee (Domestic) $144.38
(100% due at Issuance of Water Meter)
Water Meter Fee (Irrigation/Fireline) $1,551.90
(100% due at Issuance of Water Meter)
Water Meter Deposit (Domestic) $30.00
(100% due at Issuance of Water Meter)
Irrigation/Fireline Meter Deposit $70.00
(100% due at Issuance of Water Meter)
Wastewater Impact Fee $2,250.00 $2,250.00
(100% due prior to Council Approval)
I Wastewater Tap Inspection Fee $50.00
(100% due at Issuance of Building Permit)
Utility Final Inspection Fee $50.00
(100% due at Issuance of Building Permit)
Park Fee $0.00 N/A
(100% due prior to Council Approval)
Roadway Impact Fee $1,560.00 $1,560.00
(100% due prior to Council Approval)
Street Light Fee Information not
(100% due prior to Acceptance of Project available at this time
Street Sign Fee Information not
(100% due prior to Acceptance of Project available at this time
Construction Inspection Fee Need submittal of
development contracts
TOTAL $10,356.28
TOTAL AMOUNT DUE PRIOR TO COUNCIL APPROVAL $8,310.00
L-VELOPMENT FEE WORKSHE~ r
PROJECT: Corporation of the Episcopal Diocese of Dallas Addition, Lot 1, Block A
DATE: 6/11/97
Water Impact Fee:
Domestic Meter(s):
Irrigation Meter(s):
Firelina Meter(s):
1 - 1 1/2 inch = 5 ESU's
1 - I inch = 2.5 ESU's
= ESU's
1 - 6 inch = 2.5 ESU's
Total #: 10 ESU's @ $450.00 ea.
(100% due prior to Council approval of the final plat)
$4,500.00
$150.00
$144.38
$57.75
Water Tap Inspection Fee:
Total #: 3 Connections @ $50.00 ea.
(Single family due prior to issuance of building permit)
(All other developments due prior to issuance of meter)
Water Meter Fee (Domestic):
Total #: 1 Domestic Meter(s) @ $144.38
(Single family due prior to issuance of building permit)
(All other developments due prior to issuance of meter)
Water Meter Fee (Irrigation/Fireline):
Total #: 1 Irrigation Meter(s) @
Total #: 0 Additional Irrigation Meter(s) @
Total #: I Fireline Meter(s) @
(100% due prior to issuance of water meters)
Water Meter Deposit Fee (Domestic):
Total #: 1 Meter{s) @ $30.00 ea.
(100% due prior to issuance of water meters)
$0.00
$1,494.15
$30,00
'$70.00
$2,250.00
$50.00
$50.00
Irrigation/Fire Meter Deposit Fee:
Total #: 2 Meter(s) @ $35.00 ea.
(100% due prior to issuance of water meters)
Wastewater Impact Fee:
Total Domestic Meters ESU'
@$450.00 ea.
Wastewater Tap Inspection Fee:
Total #: 1 Connections @ $50.00 ea.
(100% due prior to issuance of building permit)
Utility Final Inspection Fee (All developments):
Total #: 1 Lots @ $50.00 ea.
(100% due prior to issuance of building permit)
Page 1
I-,.-VELOPMENT FEE WORKSHE,-r
Park Fee (For Resdential Developments Only):
* Preliminary plat approved prior to June 23, 1992:
N/A
N/A
Single-family @ $150.00 / Lot
Multi-family @ $75.00 / Unit
(50% paid prior to Council approval of final plat)
(50% paid at issuance of building permit)
* Preliminary plat approved after June 23, 1992:
N/A
N/A
Single-family @ $350.00 / Lot
Multi-family @ $350.00 / Unit
(50% paid prior to Council approval of final plat)
(50% paid at issuance of building permit)
* Preliminary plat approved after October 26, 1993:
N/A
N/A
Single-family @ $1285.00 / Lot
Multi-family ~ $1285.00 / Unit
(100% paid prior to Council approval of final plat)
Roadway Impact Fee:
(See attached fee calculations)
Street Lighting Fees:
Assessed for lighting in the City's right-of-way.
This fee cannot be assessed until after T.U. Electric submits
the lighting plan for the proposed development.
Once the plans are submitted, $292.60 per light will be assessed.
(100% due prior to final acceptance of development)
N/A
N/A
N/A
N/A
N/A
N/A
$1,560.00
Information not
available at this time
Street Sign Fees:
Assessed for signage in the City's right-of-way.
(See attached fee calculations if applicable)
lnfbrmation not
available at this time
Construction Inspection Fees:
A copy of the development contract must be submitted for assessment.
The contracts should indicate the cost to construct the improvements
that are inspected by the Engineering Department.
(2% of development cost required for private improvements)
(4% of development cost required for public improvements)
Need submittal of
development contracts
Page 2
ROA~ ~VAY IMPACT FEE CALCULA t'IONS
PROJECT:
DATE:
Corporation of the Episcopal Diocese of Dallas Additon, Lot 1, Block A
6/11/97
ROADWAY IMPACT FEE:
Service Area *
Catel~or7 **
Land Use **
Buildinl~ Size (Sq. Ft.)
Development Un/ts **
Vehicle Miles per Development Unit **
Fee per Vehicle Mile ***
7
Institutional
Church/Synagogue
10,000
10
0.52
$300
Roadway Impact Fee due = (Development Units) x
Vehicle Miles per Development Unit) x (Fee per Vehicle Mile) =
$1,560.00
* (Figure 2 - Roadway Impact Fee Study)
** (Table 3 - Roadway Impact Fee Study)
*** (Schedule 2, Page 3 - Roadway Impact Fee Study)