Loading...
BEI Properties-CS051014 T H E C I T ¥ · 0 F COPP-EL£ P.O. Box 9478 255 Parkway Brvd Coppell, TX 75019 Phone: (972)304-3679 Fax: (972) 304-3570 ENGINEERING DEPARTMENT FAX COVER SHEET To: Charlotte / Cooper From: Rhonda Fax: 972-245-7970 Date: October 14, 2005 Phone: Pages: q (including cover sheet) Re: Bloom Embro CC: [] Urgent [] For Review [] Please Comment [] Please Reply X As Requested .Comments: Charlotte - apparently Troy Smith calculated the construction inspection fee back in June when he filled out this permit application. If any of the info has changed, such as quantities, please substitute a new page 3 (blank pg 3 included in this fax) with new quantities, calculations & back-up. The fee must be paid to the Engineering Dept. prior to the pre-construction meeting. FYI - I don't believe we have final construction plans for stamping. Those will need to be received from the engineer of record, Keith Hamilton prior to the pre-con. Also the meter prices changed as of 8/05 so I included the development fee chart with those new prices. Call if you have any questions. IF YOU DO NOT RECEIVE ALL OF THE PAGES PLEASE CALL (972) 304-3679 "City of Coppell Engineering- Excellence By Design DEVELOPMENT FEES PROJECT NAME: BEI Properties ENGINEER: Hamilton Consulting DRIGINATION DATE: 2/4/2005 SENT ASSESSMENT ASSESSED FEE AMOUNT PD DATE 2/4/2005 Water Impact Fee Wastewater impact Fee Park Fee n/a Roadway Impact-Zone $5,050.84 $5,050.84 pc 6/28/2005 Street Sign Street Light Construction Inspection EG or Bore Permit Overtime Inspection Water Tap Inspection Wastewater Tap Inspection Water Meter (Domestic) Water Meter (Fire/Irrig) Meter Deposit (Domestic) Meter Deposit (Fire/Irrig) Utility Final Inspection $100.00 $50.00 $62.74 $62.74 $30.00 $30.00 $50.00 Sd, $. ~Subtotal to Eng. $6,904.27 $5,050.84 $1,853.43 TOTALS Total Fees Fees Paid Amount Owed $9,389.75 $5,050.84 $4,338.91 Prior To Construction Erosion Control Approved E.P.A.-NO.I. Recd. Const. Plan Approved NOTES Date Received Prior To Final Acceptance As Built Plan Recd. Paving Bond Recd. Utilities Bond Recd. Erosion Control Maint.